Loading...
HomeMy WebLinkAboutS-202922STREAMSIDE F-C-1 ROCKERY L19J W-8' HEIGHT) AREA 0 PHASE 2 COP F-A-1 BRIDGE NQ.-S 8' STREAMSIDE ROCKERY (LOCATION AS SHOWN) B Xli AREA 0 PHASE 2 COP ............. N RAISE ROAD GRADE 00' WIDTH) j::ue AREA N - PHASE 2 NOTES.' (NOT USED) 2 RAISE ROAD GRADE STA 25+50 TO STA 27+90 (6'- IWBASE COURSE) OREMOVE AND DISPOSE OF EXIST TANK STA 27+00 + (INCIDENTAL TO OTHER WORK) 6'TO 8'STREAMSIDE ROCKERY (LOCATION AS SHOWN) STA 26+67 TO STA 27+25 (SEE SHT C-5) (SEE SHT C-5) LIGHT LOOSE RIPRAP (AT END OF ROCKERY - 3 TONS) WARNING R. c.'. leG. DATE IF THIS BAR DOES NOT MEASURE THEN DRAWING IS R_ -_ E..NO. DATE NOT TO SCALE. A CULVERT r W/ CATcff__ ;D9 .0 STREAMSIDE F-C-1 ROCKERY - ------ LL4J W HEIGHT) PLANTING NOTES: AREA 0 PHASE 2 NOTES.' AREA 0 PHASE 2 NOTES (CONT): PJ LIVESTAKE (RED-OSIER DOGWOOD AND WILLOW). (D BRIDGE ABUTMENT REPLACEMENT (SEE SHT C-11) 9 CONSTRUCT ROCK WEIR (SEE SHT C-11) SHEET NOTES.7 1. SEE SHEET G-2 FOR GENERAL NOTES. 2. SEE SHEET G-3 FOR SURVEY CONTROL POINTS. 3. FROM STA 29+00 TO STA 32 +00 PLACE LOD AND BOULDER CLUSTERS IN LOCATIONS DESIGNATED BY THE ENGINEER. PLAN FOR 4 SUCH LOCATIONS. PLACEMENT OF LOD IS INCIDENTAL TO OTHER WORK. FOUR (4) 2-3 MAN ROCKS (BOULDERD) PER LOCATION MAXIMUM, TO BE LOCATED BY THE ENGINEER. F-A-1 BRIDGE NQ.-S 8' STREAMSIDE ROCKERY (LOCATION AS SHOWN) B RAISE ROAD GRADE LIGHT LOOSE RIPRAP (AT END OF ROCKERY STA 28+77± I C-11 I ABUTMENT REPAIR (INCIDENTAL TO OTHER WORK) (lZ WIDTH) INSTALL 15'CPEP CULVERT REMOVE DEAD TREE (INCIDENTAL TO OTHER WORK) STA 28-77Y 13 ROCK LINED DITCH (60 LF) ------------ --------- -------------------- RIPRAP INLET /OUTLET (3 TONS, EACH LOCATION) 14 RAISE ROAD GRADE �V WAs STA 29-40 TO STA 30+30 6 RAISE ROAD GRADE 3 FT (APPROX) A C-14 ROCK LINED DITCH STA 2845 TO STA 29+40 Z QN� 7 13 5 4 QD (SEE SHT C-71 b 12 2.5' - 2" TO 4" OUARRY SPALLS ------ 29% -- --------------- k----- J -- . . . ........... .... ... ........ 14 . . . .... ...... STA 28+77t IS'IIIIIIII`2029 JEXPIRES: 12/13 —1 OREMOVE EXIST GABION (INCIDENTAL TO OTHER WORK) ..... . ......... ... -- --------- -7- .......... ------------ ---------- ....... ........... . . HONEY CREEK INTERIM REPAIRS - PHASE 2 REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS WWP-22-2029 PLAN IMPROVEMENTS pi... ....... ............. N RAISE ROAD GRADE 00' WIDTH) j::ue AREA N - PHASE 2 NOTES.' (NOT USED) 2 RAISE ROAD GRADE STA 25+50 TO STA 27+90 (6'- IWBASE COURSE) OREMOVE AND DISPOSE OF EXIST TANK STA 27+00 + (INCIDENTAL TO OTHER WORK) 6'TO 8'STREAMSIDE ROCKERY (LOCATION AS SHOWN) STA 26+67 TO STA 27+25 (SEE SHT C-5) (SEE SHT C-5) LIGHT LOOSE RIPRAP (AT END OF ROCKERY - 3 TONS) WARNING R. c.'. leG. DATE IF THIS BAR DOES NOT MEASURE THEN DRAWING IS R_ -_ E..NO. DATE NOT TO SCALE. A CULVERT r W/ CATcff__ ;D9 .0 STREAMSIDE F-C-1 ROCKERY - ------ LL4J W HEIGHT) PLANTING NOTES: AREA 0 PHASE 2 NOTES.' AREA 0 PHASE 2 NOTES (CONT): PJ LIVESTAKE (RED-OSIER DOGWOOD AND WILLOW). (D BRIDGE ABUTMENT REPLACEMENT (SEE SHT C-11) 9 CONSTRUCT ROCK WEIR (SEE SHT C-11) SHEET NOTES.7 1. SEE SHEET G-2 FOR GENERAL NOTES. 2. SEE SHEET G-3 FOR SURVEY CONTROL POINTS. 3. FROM STA 29+00 TO STA 32 +00 PLACE LOD AND BOULDER CLUSTERS IN LOCATIONS DESIGNATED BY THE ENGINEER. PLAN FOR 4 SUCH LOCATIONS. PLACEMENT OF LOD IS INCIDENTAL TO OTHER WORK. FOUR (4) 2-3 MAN ROCKS (BOULDERD) PER LOCATION MAXIMUM, TO BE LOCATED BY THE ENGINEER. (NOT USED) l0 8' STREAMSIDE ROCKERY (LOCATION AS SHOWN) TREMOVE FENCE POSTS LIGHT LOOSE RIPRAP (AT END OF ROCKERY STA 28+77± 3 TONS) (INCIDENTAL TO OTHER WORK) INSTALL 15'CPEP CULVERT REMOVE DEAD TREE (INCIDENTAL TO OTHER WORK) STA 28-77Y 13 ROCK LINED DITCH (60 LF) 5 RIPRAP INLET /OUTLET (3 TONS, EACH LOCATION) 14 RAISE ROAD GRADE �V WAs STA 29-40 TO STA 30+30 6 RAISE ROAD GRADE 3 FT (APPROX) (6"- /%4" BASE COURSE) STA 2845 TO STA 29+40 6�' - 1% " BASE COURSE p QD (SEE SHT C-71 b 2.5' - 2" TO 4" OUARRY SPALLS 29% INSTALL TYPE / CATCH BASIN IST ONAL STA 28+77t IS'IIIIIIII`2029 JEXPIRES: 12/13 —1 OREMOVE EXIST GABION (INCIDENTAL TO OTHER WORK) CITY OF RENTON DEPARTMENT OF PUBLIC WORKS HONEY CREEK INTERIM REPAIRS - PHASE 2 REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS WWP-22-2029 PLAN IMPROVEMENTS STA. 27+00 TO STA. 30+00 DESIGNED: DATE: 6/94 FILE NAME: PLAN REVIEW DATE WASTEWATER L7;LITY 'AT' DRAW— CHECKED SCALE: AS NOTED FIELD BOOK: PAGE: I RECORD DRAWING—AS BUILT DGP JEB DEC. 22 1994 NO. REVISION BY APPR. DATE SHEET: C-6 OF: