Loading...
HomeMy WebLinkAboutS-206308[A I I I I I AI I I I A i I I j I A I X I I I I I X I I 1 IA i I 1 i 1 INSULATED ENCLOSURE WITH LOCK, HEAT SOURCE, AND DRAIN PORTS. 9'4" DIA. REDUCED PRESSURE BACKFLOW EQUAL TO LOK BOX, MODEL #.75, j PREVENTE CENTER ENCLOSURE OVER PIPING P EQUAL TO FEBCO MODEL 825YA ANGLE PATTERN HIGHWAY RIGHT OF WAY, PRIVATE PROPERTY AIR GAP DRAIN, T'a" DIA_ ISOLATION VALVE, EACH SIDE i ROUTE TO DRAIN PORTS CORPORATION STOP EQUAL TO FORD TAPERED THREAD (CC) WATER METER TO BE SUPPLIED BY CITY 1174 "x1774° CONCRETE METER BOX WITH 3'a' DIA. "Y" STRAINER PACK JOINT (f 1000) 9'111° STEEL DIAMOND PLATE COVER EQUAL TO FOG TITE METER SEAL CO. 1D METER. BOX 2274' FINISH GRADE 9" 36' MINIMUM DEPTH ANCHOR ENCLOSURE TO PAD WITH (4) S.S. Yz" BOLTS 12" MIN. NOTES: r UNDISTURBED NATIVE MATERIAL NEAR FN ENCLOSURE LID TO ENCL OPEN NEAR FENCE AND ELECTRICAL ENCLOSURE �I II- II- II III- III�II HEAT SOURCE TO PROTECT PIPING INSIDE I ENCLOSURE FROM FREEZING TO 30' F. EXISTING WATER MAIN - III�II�II -I 11 . SOFT COPPER TUBING LOOP DOWN TO CENTERLINE FORD COPPERSETTER VH 772 -75W BOTH INLET AND OUTLET WITH PACK PROVIDE PADLOCK AND (2) KEYS. OF WATER MAIN TO PROVIDE SLACK IN COPPER SERVICE JOINT WITH GRIPPER, PADLOCK WINGS ON KEY VALVE, SINGLE CHECK VALVE CONNECT TO BACKFLOW PREVENTER ON OUTLET, ALL PACK JOINT FITTINGS 24" DEEP X 30" WIDE X 4" THICK LINE TO METER. SHALL BE GRIPPER. CONCRETE PAD KITH 6" X 6" W7.4 X WIA WWF, CENTER PAD AROUND PIPING WATER SERVICE CONNECTION WATER METER PIPE TO VALVE VAULT PIPE FROM WATER METER CO C7 NTS CO C22 NTS REDUCED PRESSURE 3 3 GQ C12 BACKFLOW PREVENTER NTS 1 -6 ACCESS HATCH, SHOWN IN UPRIGHT POSITION, SEE DWG. N0. M01 FOR HATCH DETAILS 1' -6" ACCESS HATCH, SHOWN IN UPRIGHT POSITION, SEE DWG. NO. M01 FOR HATCH I DETAILS I ALUMINUM ACCESS LADDER WELDED TO REPLACE TRENCH WIDTH WITH UNDERSIDE OF ACCESS HATCH DOOR, ASPHALT PAVEMENT, 4- MIN, STRUCTURAL FILL MATCH ALIGNMENT OF LADDER BELOW ALUMINUM ACCESS LADDER WELDED TO PROVIDE PVC PIPE TO UNDERSIDE OF ACCESS HATCH DOOR, WARNING TAPE, ROUTE HATCH DRAIN MATCH ALIGNMENT OF LADDER BELOW SAWCUT EXISTING PAVEMENT 4' -0° 2' -0' 12" ABOVE CONDUIT APPLY TACK COAT TO EDGE EDGE TO EDGE ��'Ij INTO LIFT STATION 1 -6 ANTI -SLIP FRP LADDER RUNG @ 12" O.C. BELOW GRATING PRIOR TO PLACING I FRP LADDER RAIL, EACH SIDE NEW PAVEMENT I 4� 7.00' T� OP OF AT SURFACE 12" NOTE: ROUTE PVC PIPE FROM HATCH DRAIN TO SUMP PIT. 0 07 : o -o - �� TOP COURSE, 4° MIN. o TOP OF cp # FRP RAIL ATTACHMENT ANGLE BOLTED TO LIFT STATION g 12° CONCRETE SLAB WITH (1) T'a DIA SS_ z 'k ° ', Na EXPANSION BOLT EACH SIDE 3' -0' UNDER HIGHWAY 2' MIN. ELSEWHERE -0" GRATING 4 -0° REMOVABLE SECTION OF FRP -: -_ T'a " S.S. ANCHOR BOLT, EACH SIDE �I I I I� III I I L7' -6' MIN. V -6" MIN. I I I IBI�I I I I I I �I I I I I IE " FRP RAIL ATTACHMENT ANGLE BOLTED TO GRATING BEAM WITH (2) Y2' DIA. FRP BOLTS, 81 x 2 "W x Y2" FLAT BAR (FB) TOP OF SEWER TO I I ELECTRICAL DUCT BANK - 18 MIN. BOTTOM OF WATER F9 F I COVER, SEE DWG. E01 ONE -LINE EACH SIDE, SEAL CUT EDGES OF DRILLED BEND AS SHOWN (TYP.) ��I I Mai I I CIF I�I�I 16° MIN. DIAGRAM FOR SIZE AND TYPE OF 31 F� CONDUIT FRP BEAM (TYP.) 3325' 11k�Ik�iFl I IHI I 6° MIN - tYz "x7Yz "xYa" FRP ANGLE, FULL LENGTH OF TOP OF BEAM, BOLTED TO TOP FLANGE OF BEAM Y4" DIA. LADDER RUNGS ®12" O.C. I�I�I�I I -Y," DIA. WATER SERVICE I I��I��II�I II -�i GRATING WITH Y2" DIA. S.S. BOLTS ®12' O.C. i' -6" 111 I I I I I Y4" x 2' FB STRINGER, EACH SIDE, CONTINUOUS .�t.fl, 4° DIA. D.I. FORCE MAIN° �IuI.. OR 8' DIA. DJ_ GRAVITY SEWER \ \\ FRP GRATING SUPPORT FRAME, y4° '- PIPE BEDDING (TYP-) SEE DWG. N0. C04 All STABILIZATION MATERIAL, FRP TANK BEHIND TYP. TRENCH SECTION IF REQUIRED BY ENGINEER 81 x 2'W x Y2" FLAT BAR (FB) FOR ANY TRENCH rA CO FIBERGLASS ACCESS LADDER BEND AS SHOWN (TYP) SCALE: 1' = 2' -0' UNDISTURBED NATIVE MATERIAL B CO3 IN LIFT STATION 7'4" DIA. S.S. ANCHOR BOLT (TYP.) SCALE: 1" = V -O" VV AULT FLOOR ALUMINUM ACCESS LADDERp CO3 C13 IN VALVE VAULT SCALE: 1" = 7' -0" SCHEDULE A & B REVISED TO CONFORM TO CONSTRUCTION RECORDS o H. Zw �� � CITY OF RENTON - 1992 LIFT STATION IMPROVEMENTS SCHEDULE A: COTTONWOOD L.S. REPLACEMENT SCHEDULE B: LAKE WASHINGTON L.S. #2 REHABILITATION DWG N0. JOB NO. I� F a 911 � uo2 1v7.zo MISCELLANEOUS RH2 ENGINEERING P.S. ='DATE A 16727 ° 4°! ' 10 ' 1 .' �O ,Qecrsrsxe °ti SIGNED: „ ,, i, 1. -t �� � '� IN(I \IIItti I,�n. , i n.� .Intl;. - Sstoxac *' I VXl q.S i, "I0 n' i i iui' DETAILS Qj ADDENDUM 1 MLM ORE 10/20/92 .;. „ :. .. .. w�/ /� �otfl.3 10109192 - uu�i�sT� r�n�� �� u��ii /- Fxaiaes a /z /ae DAD DIRE SHOWN OCT 03, 1994 1 18 OF 20 [A I I I I I AI I I I A i I I j I A I X I I I I I X I I 1 IA i I 1 i 1