Loading...
HomeMy WebLinkAboutS-2071060 1.73% "PRIVATE' ® 1.12% "PRIVATE' @ 2.27% "PRIVATr' ,RECORD DRAWING 20' 10' 0 20' 40' SCALE: 1 " =20' NOTES: FOR GENERAL DRAWING NOTES AND SYMBOLS, SEE SHEETS G4 AND G5, FOR GENERAL SANITARY SEWER SYSTEM NOTES, SEE SHEET 3C81. FOR SANITARY SEWER SYSTEM DETAILS, SEE SHEET 3C80 TO 3C82. FOR SURVEY" CONTROL INFORMATION., SEE SHEET G5. ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. SANITARY SEWER PROFILES ARE SHOWN ON SHEETS 3C60 TO 3C61 SECTIONS OF THE SANITARY SEWER MAIN ARE DISTINGUISED BY "A THROUGH C" DESIGNATORS. POINT OF CONNECTION TO WORK BY OTHERS IS MH -5. CONTRACTOR TO COMPLETE DROP CONNECTION TO METRO 72" SS. RECORD DRAWING INFORMATION OBTAINED FROM CONTRACTOR'S RECORDS, 00 EMIR 4 amml ®Ina�IM- KEY PLAN SCALE: NONE S. 1 Z SEC. 24, T. 23N, . 4E, W.M. KCL /06.30.9, I I I I % I Al I I I A I I I A I A _ I I A I I I A I i 1 18 17 16 15 14 13 12 11 10 9 8 7 6 MICROBOX 00 Ag"' Ew 6 7 1 9 11 11 12 13 14 15 11 17 i8 19 20 R146