Loading...
HomeMy WebLinkAboutS-207901CITY • a • ••- Alp R 0 IN APROR I ' RF 1 ffi ®m - W4 +00 W5 +00 �iW6 +00 i PROJECT CORNER R N27 +28,W6 +32 �I N ww'Q -14 -2079 z �_ LOCATION MAP NJ.S MAINTENANCE O o / � z 0 w o `" BUILDING FF =22.1 LEASE C201C o. N25 +07, W5 +28 °o oa a_ � m - o,° =�I /O I BUILDING PLUMBING. LINE - IJ I N: w Z o-1 QN Q°Xw ��ww .. .. . . ................. ------------------ :.... ...: ......................... ................ ....... . . . . .. _._............ - - - - .. . -. _........ .--- - - . .... --------------- .................SURFA -.- ....... -- - -- ._. ......... ....._....... EXISTING GROUND E : _ Qo _ _ 22 ... :...: 21 .... 20 n�_ -- ------------ --------- ............ ....... 8'H L '�'�,S�ER.......... .......... 18 EXBTISS F m 17 ±zew......._ QOII.p r- I � Z0 :ui O O _ ---- -' - - - ...... ..... .... ................... - ...... 16 rn =� - om ....... _ ------------------------------T 1 +60 - - - - -----... T....-'---.--...-... 1 +40 1:-20 1'00 0'00 - .a........_.................... 0 +60 0 +.0 0:20 0 +00 SANITARY SEWER PROFILE SCALE-- 1 ° =20' HORIZ. 1 ° =2' VERT• I 4=i U O � / Nc W F­_ I CONSTRUCTION BENCHMARK 22.48 MAINTENANCE BUILDING 05 -45 FF =22.1 N25 +03,W4 +00 I I I I O o / � z so / z / I I I STA. 1 +77 C201C o. N25 +07, W5 +28 I /O I BUILDING PLUMBING. 1- CLEANOUT IJ I N: RIM =21.6 C201 C508 I.E =19.00 I 4=i U O � / Nc W F­_ I CONSTRUCTION BENCHMARK 22.48 MAINTENANCE BUILDING 05 -45 FF =22.1 N25 +03,W4 +00 I I I I I I I I BOEING PROJECT LINE TYP_ I I I I - I I I STA. 1 +77 C201C o. N25 +07, W5 +28 I CONNECT TO BUILDING PLUMBING. 1- CLEANOUT RIM =21.6 C201 C508 I.E =19.00 BUILDING 622 177 LF OF 8" DI SANITARY SEWER LINE. SL =1.589 REPLACE ASPHALT PIPE JOINTS ARE AS FAR FROM THE 16" . WATERMAIN AS POSSIBLE. LE. (SS) =18.89 .E. (W)=16-60 FLOW STA 1 ' 45 N24 +75,W5 +28 C20AC508 1- 8"X6" TEE (MJXMJ) -F CAP FOR FUTURE USE BY CITY OF RENTON -- -STA. t34 +83, -39'RT N23 +30, W5 +30 REMOVE EXISTING CLEANOUT. INSTALL NEW TYPE B MANHOL . RIM =20.5 CONNECT EXISTING 8" SANITARY SEWER I.E. =16.0 CONNECT NEW 8" FLOW SANITARY SEWER I_E -16.20 _ \ EXISTING REPLACE FENCE 87 SS REMOVED FOR CONSTRUCTION. R F IF r T I // I LEASE CORNER 7 N25 +02.96,W5 +87.39 I II II I I I � I I 5-j•W -�' __�-- I w Il�ll F llul I 29'� �! 3 3 TELEMETRY Nl� 35 I w I I O I I ¢ 1 1 0 1 I PULL BOX /- I o TELEMETRY PULL BOX CALL UTILITY LOCATE E 1 -800- 424 -5555 BEFORE YOU DIG CITY OF RENTON STANDARD SEWER NOTES: 1. All work materials shall be in conformance with the Standards and Specifications of the City of Renton Utility Department and the latest edition of the WSDOT /APWA standards and specifications. 2. The hours of work in the street right -of -way shall be limited to 8:30 A.M. to 3:30 P.M. on weekdays unless otherwise approved in writing by the Department of Public Works at 235- 2620_ All street closures, partial or fulf, shell be oprr -•: i by the department of public works 24 hours in advance. The police department, fire department and 911 shall be notified 24 hours in advance. 3. All construction shall be in accordance with "Standard Specifications for Municipal Public Works Construction" prepared by Washington State Chapter American Public Works Association, latest edition (APWA) and City of Renton Standard Specifications. 4. All !ocations of existing utilities shown are approximate and it shall be the contrac'tor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 5. A preconstruction conference and a 24 hour notice shall be required prior to starting new construction. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. (Inspection will be accomplished by a representative of the City of Renton.) It shall be the contractor's responsibility to notify the utility department 24 hours in advance of backfilling all construction. 6. Contractor is solely responsible for the means, methods and sequences of construction and for the safety of workers and others on the construction site. - 7. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to any construction. 8. Plans approved by the City of Renton, Public Works Department shall take precedence over all other plans. . 9. A copy of these approved plans must be on the job site whenever construction is in progress. 10. The contractor shall provide the City of Renton with on as- built drawing of the sanitary sewer system which has been stamped and sinned by a licensed professional engineer or .licensed professional surveyor. 11. Backfill shall be placed equally on both sides of the pipe in layers with a loose average depth of 6 inches, maximum depth of 8 inches, thoroughly tamping each layer to 95 percent of maximum density. These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the trench. Materials to complete the fill over pipe shall be the some as described. 12. Open cut road crossings - for utility trenches on existing traveled roadway shall be backfilled with crushed rock and mechanically compacted. Cuts into the existing asphalt shall be neatline cut with saw in a continuous line. A temporary mix patch must be placed immediately after backfill and compaction. A permanent hot mix patch shall be .placed within 30 days and shall be per City of Renton current standards. 13. Datum shall be City of Renton, U.S.C. and G.S. 14. All disturbed areas shall be seeded and mulched or otherwise stabilized to the satisfaction of the department for the prevention of on -site erosion after the completion of construction. 15_ All pipe and appurtenances sholl be laid on a properly prepared foundation in accordance with Section 7- 02.3(1) of the current State of Washington Standard Specifications for Road and Bridge Construction. This shall include necessary leveling of the trench bottom or the top of the foundation material as well as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense unyielding base. Pipe bedding shall be pea gravel 6" above and below the pipe. 16. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034, SDR 35, or ductile iron class 50. 17. In unimproved areas, manhole to extend minimum 6 inch and maximum 18 inch above finished grade. In paved area, cover must slope in all directions to match paving. 18. Sanitary sewer manhole to be waterproofed see Technical Specification Section 02605. 19. Contractor is responsible to locate all off -site & on -site utilities. 20. City of Renton Benchmark No. 100: chiseled square in sidewalk at base of Will Rogers Monument of View Park (East side of Rainier Avenue N. and N-W. 4th Street). Elevation = 50.77. L = -J LJ L - -J I I I +� I --- - i 56 PP �- / 1 ROAD BEARING �- PP �J OPP ' FROM WILSEY & HAM, 1973 O ANAL v ='� 1 PLANS. [13 -1 -39] l(-ZS -fL 37 rEXPIRES 01/26/93 -OE -0E- y -. - CULVERT ' EXISTING BOX s D CHECKED FOR COMPLIANCE __- -- - -- ROA RE OMMENDED RECOMMENDED TO CITY STANDARDS R�METER CITY MONUMENT 1252 PPROV L FOR APPROVAL 39 PE STA. 36 +89.95 I A ISSUED FOR BID B BY' Date CITY MONUMENT #1253 PLAN REVIEW- EV/E WASTEWATER Date STA. 38 +67.84 �- - - N0. REVISION BY APPR. ArW 20 10 0 20 40 N SCALE: 1 " =20' SW 1/4, SEC 7,T23N,R5E, WM CITY OF RENTON DEPARTMENT OF PUBLIC WORKS UTILITY PLAN - SEWER NEW AVIATION FUEL FARM RENTON MUNICIPAL AIRPORT DESIGNED: DATE 9/30/92 FILE NAME C1460201 DRAWN: CHECKED: SCALE 1" = 20' eaurc srELr Na C201 APPROVED: a w�ce MEET: 1 OR 2