Loading...
HomeMy WebLinkAboutS-210905rn CD N d G G • f � 1 I NOTES 1. THE TRENCH PLUGS SHALL EXTEND 2 FEET BELOW THE BOTTOM OF THE SEWER PIPE TRENCH BY 3 FEET EITHER SIDE OF THE TRENCH, BY 3 FEET ABOVE THE ELEVATION OF THE CROWN OF THE PIPE TRENCH PLUGS SHALL BE A MINIMUM OF 3 FEET IN LENGTH. CONTROL DENSITY FILL TRENCH PLUG N.T.S. (FILL MATERIAL VE SOILS TROL DENSITY FILL MIN_ 4" ASPHALT CONCRETE (2 LIFTS) 12" 6" ` i �� 6" MINIMUM CRUSHED SURFACING TOP COURSE � _ JOINT MUST AW —CUT Y Xi }X X.X.X.xXV�:xx.xx \' SUBSEQUENT BACKFILL MATERIAL (NATIVE IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.9(3) STREET PATCHING CRUSHED SURFACING BASE COURSE N.T.S. 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKRI I ED AND PATCHED PER SPECIAL PROVISION 5 -06.1 AT THE END OF EACH WORK DAY. THIS WORK SHALL BE INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2- THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF (1) ONE FOOT BEYOND THE UNDISTURBED EDGE OF THE TRENCH_ 3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 4. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN (2) TWO WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA UNLESS APPROVED BY THE ENGINEER. ssf� ruerA� rw ,.r MAY 2002 _ "`ry"gL NOT TO SCALE °� `° "'"°° CITY OF OH -� R E N TO N HIGATE LIFE STATION ELIMINATION JD" I D DETAILS AND SECTIONS Planning /Building /Public Works Dept. DMC REVISION BY DATE APPR .n L UG MA �"" °"' SCANNED R 2 S M 5 -6 ROLL 179 FR I S 00 9 b y 0 m mj ww'' c �z N z � SO N e -Q BACKFILL MATERIAL NATIVE SOILS 72" \ \, BACKFILL MATERIAL WITHIN THE RIGHT —OF —WAY 72" AS SHOWN IN PATCHING DETAIL 24" IMPORTED BACKFILL MATERIAL PER SECTION 9- 03.9(3) m 8" SANITARY SEWER 6- PIPE BEDDING MATERIAL AS SPECIFIED IN 9 -03.16 8" SANITARY SEWER 6" EXCAVATION OF UNSUITABLE SOIL AND ua BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER. MATERIAL SHALL MEET SECTION PIPE BEDDING MATERIAL 9- 03.9(1) BALLAST 1 AS SPECIFIED IN 9 -03.16 L 6^ EXCAVATION OF UNSUITABLE SOIL AND 1_ ALL UNSUITABLE MATERIALS EXCAVATED FROM THE TRENCH SHALL BE REMOVED, BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) HAULED AND DISPOSED. EXCAVATION SHALL BE REPLACED WITH FOUNDATION, BEDDING AND BACKFILL MATERIALS AS SHOWN IN TRENCH BACKFILL DETAIL AND DEPTH AS APPROVED BY ENGINEER. MATERIAL SHALL MEET SECTION COMPACTED IN ACCORDANCE WITH SPECIFICATIONS 9- 03.9(1) BALLAST 2. ALL TRENCHES IN ARTERIAL STREET ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED WITH TEMPORARY ASPHALT AT END OF EACH WORK DAY. 1_ ALL UNSUITABLE MATERIALS EXCAVATED FROM THE TRENCH SHALL BE REMOVED, SANITARY SEWER BACKFILL HAULED AND DISPOSED. EXCAVATION SHALL BE REPLACED WITH FOUNDATION, WITHIN RIGHT -OF -WAY DETAIL N.T.S. N.T.S. BEDDING BACKFILL DETAIL AND COMPACTED DINBACCORD ACCORDANCE MATERIALS SPECIFICATIONS. SANITARY SEWER BACKFILL WITHIN WETLAND DETAIL N_T S. f � 1 I NOTES 1. THE TRENCH PLUGS SHALL EXTEND 2 FEET BELOW THE BOTTOM OF THE SEWER PIPE TRENCH BY 3 FEET EITHER SIDE OF THE TRENCH, BY 3 FEET ABOVE THE ELEVATION OF THE CROWN OF THE PIPE TRENCH PLUGS SHALL BE A MINIMUM OF 3 FEET IN LENGTH. CONTROL DENSITY FILL TRENCH PLUG N.T.S. (FILL MATERIAL VE SOILS TROL DENSITY FILL MIN_ 4" ASPHALT CONCRETE (2 LIFTS) 12" 6" ` i �� 6" MINIMUM CRUSHED SURFACING TOP COURSE � _ JOINT MUST AW —CUT Y Xi }X X.X.X.xXV�:xx.xx \' SUBSEQUENT BACKFILL MATERIAL (NATIVE IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.9(3) STREET PATCHING CRUSHED SURFACING BASE COURSE N.T.S. 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKRI I ED AND PATCHED PER SPECIAL PROVISION 5 -06.1 AT THE END OF EACH WORK DAY. THIS WORK SHALL BE INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2- THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF (1) ONE FOOT BEYOND THE UNDISTURBED EDGE OF THE TRENCH_ 3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 4. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN (2) TWO WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA UNLESS APPROVED BY THE ENGINEER. ssf� ruerA� rw ,.r MAY 2002 _ "`ry"gL NOT TO SCALE °� `° "'"°° CITY OF OH -� R E N TO N HIGATE LIFE STATION ELIMINATION JD" I D DETAILS AND SECTIONS Planning /Building /Public Works Dept. DMC REVISION BY DATE APPR .n L UG MA �"" °"' SCANNED R 2 S M 5 -6 ROLL 179 FR I S 00 9 b y 0 m mj ww'' c �z N z � SO N e -Q