Loading...
HomeMy WebLinkAboutS-216235II r ' \N� !� t I NIA u I- z 3 N R, z j u Ir, x I N I I Nc0 m (.0 m _ g N ° ^: N � g� € I N I IL W C) z I- n Ld L W w � z W W W _ W mW �W QQ Qcf) � W �z J Cn Q Q W W c- W No w W c Y z (f cn Q W Qo �m OO 3 N a u " E- , :3w i--IN a F+-1 rn c cE .5m E Ir Flfl c a� $a r z V) e INrn �LLa a z w Z U 0 \ \ U O O Q PAY LIMIT TRENCH BACKFILL 6' -0" FOR 12" SEWER AND 12 " -24" STORM PIPES SEE DETAIL FOR STREET RESTORATION REQUIREMENTS SUBSEQUENT BACKFILL MATERIAL (NATIVE APPROVED IMPORT PERS CTTION 9N OR 03J2(1)C (SELECT BACKFILL) OF THE SPECIAL PROVISIONS. PROPOSED 12" SEWER PIPE AND 24' AND 12" STORM PIPES PIPE ZONE MATERIAL PER SECTION 9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3 COMPACT PIPE ZONE MATERIAL TO 907 MINIMUM DENSITY' EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCAVATION SAFETY SYSTEMS: BID ITEM. 12" PVC SEWER AND 24 " -12" CPEP STORM PIPES TYPICAL TRENCH BEDDING AND BACKFILL 12" TYP TRENCH (SEE DETAILS) PAY LIMIT OF TRENCH PAY LIMIT TRENCH BACKFILL 5' -0" FOR 18" O.D. HDPE & 28" O.D. HOPE DUAL LINE TRENCH SUBSEQUENT BACKFILL MATERIAL (NATIVE. IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.12(1)C (SELECT BACKFLL) OF THE SPECIAL PROVISIONS. PROPOSED 18" O.D. HDPE SEWER ANO 28" O.D. STORM HDPE MAINS PIPE ZONE MATERIAL SHALL BE PEA GRAVEL OR SAND EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST PAY LIMIT TRENCH BACKFILL 10' -0" FOR 16" C905 PVC & 24" C905 PVC DUAL LINE TRENCH 4.0' TO 6.0• I 1'-0" 24" 16" SEE DETAIL #1 AND #2 FOR STREET RESTORATION REQUIREMENTS SUBSEQUENT BACKFILL MATERIAL (NATIVE IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.12(1)C (SELECT BACKFILL) OF THE SPECIAL PROVISIONS. PROPOSED 16" C905 PVC SEWER AND 24" C905 PVC STORM MAIN PIPE ZONE MATERIAL PER SECTION 9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES: NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2,. HAND TAMP UNDER HAUNCHES. 2.. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY : 3. COMPACT PIPE ZONE: MATERIAL TO 90% MINIMUM DENSITY " EXCEPT DIRECTLY OVER PIPE, WHERE COMPACTION WILL BE EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY'. '',.,. HAND TAMP ONLY. 4:; PIPE .MUST BE ANCHORED IN SUCH A MANNER AS TOI, ENSURE 4. PIPE MUST BE'. ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW. LINE IS MAINTAINED. FLOW LINE IS MAINTAINED., 5. ALL EXCAVATION AND .BEDDING. AND 13ACKRLL. MATERIALS 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCHI SHALL BE INCLUDED WITHIN BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH. EXCAVATION. SAFETY SYSTER'S BID REM. THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM. 18" O.D. HDPE SEWER AND 28" O.D. HDPE STORM 16" C905 PVC SEWER AND 24" C905 PVC STORM TYPICAL TRENCH BEDDING AND BACKFILL TYPICAL TRENCH BEDDING AND BACKFILL s M21 b 213 5 i! -1�2 ) - SAWCUT FINAL JOINT TYP. EACH SIDE PATCH PAYMENT (SEE BEDDING /BACKFILL DETAIL) PERMANENTLY, REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION. EXIST. ASPH. CONC. PAVEMENT, TYP. - 8" CL 'B' ASPHALT CONCRETE PATCH CONSTRUCTION NOTES . 15' UTILITY EASEMENT (NE 27th ST, KENNEWICK PL NE &ABERDEEN AVE NE) 1. TRENCH SAFETY AND SHORING SHALL BE PER SECTION 7- 08.3(1)6 OF THE SPECIAL 5. STATIONING' SHOWN IN CENTERUNE OF ROADWAY OR SURVEY CONTROL LINES 4" CL 'B' ASPHALT CONCRETE PATCH (NE 24th ST) PROVISIONS. TRENCHES SHALL BE SEALED TO PREVENT ENTRY DURING NON'.- WORKING HOURS. DETAIL PLUS 2' -0' AS DEFINED BY THE CONTROL POINTS. 2. VERTICAL CONTROL .DATUM BASED ON NAVD 1988 (IN FEET) 3.91 4.91' .4.06' 6" CRUSHED SURFACING TOP COURSE 6 SIDE SEWERS 3. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES: - BACKFILL 4. EXISTING PRIVATE IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND 8" WATER Rw',�, &1 1 1 41 I ,i GIP. '73 I�It{ I I 1 r PATCH PAYMENT (SEE BEDDING /BACKFILL DETAIL) PERMANENTLY, REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION. TRENCH WIDTH PER APPROPRIATE 5. STATIONING' SHOWN IN CENTERUNE OF ROADWAY OR SURVEY CONTROL LINES DETAIL PLUS 2' -0' AS DEFINED BY THE CONTROL POINTS. 3.91 4.91' .4.06' 2.12' 6 SIDE SEWERS VARIES 6. ALL MANHOLES AND TYPE -2 CATCH BASINS SHALL HAVE LOCKING UDS. ASPHALT LT CONCRETE PAVEMENT 7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. +III RESTORATION DETAIL 8. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS 24' OF MANHOLE AND CATCH BASINS AND SIDE SEWER VERTICAL AND HORIZONTAL LOCATIONS. ! 16" STORM SEWER NTS 9. INSTALL SEWER MAIN AND SERVICES A MINIMUM 2' FROM PARALLEL GAS LINES WHERE CONFLICT OCCURS. NOTES: 10. ALL CEMENT CONCRETE DRIVEWAYS AND ALLEY APPROACHES SHALL BE 6" ' 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED THICK. (IN ACCORDANCE WITH STANDARD PLAN #FO06, DRAWING hFR01N). PER SPECIAL PROVISION 5-06.1 AT END OF EACH WORK DAY. 11. REPLACE ALL DISTURBED CURB & GUTTERS IN ACCORDANCE WITH STANDARD THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. PLAN # FOO8, DRAWING # FR05 AND STANDARD PLAN # F001 "CEMENT CONCRETE 2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND CURB AND GUTTER." THE UNDISTURBED EDGE OF THE TRENCH. 12. REPLACE ALL DISTURBED :SIDEWALK IN ACCORDANCE WITH STANDARD PLAN TYPICAL CROSS' SECTION FOR 3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL # F007, DRAWING # FR02 16" C905 PVC. 24 "' C905 PVC AND 8" !: DI '.. BE CONSIDERED INCIDENTIAL TO OTHER ITEMS OF WORK. !. !, 13. WHERE UTILITY PIPE LINE VERTICAL. SEPARATION IS LESS THAN (1) ONE FOOT; SEE ABOVE DETAIL'. FOR BACKFILL! ANDS BEDDING REQUIREMENTS,. INSERT ETHAFGAM HS 600 PLANK -FOAM BOARD OR EQUAL AS .CLEARANCE . 4. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED SEPARATION: WITHIN (2) WEEKS OF COMPLETION OR WORK WITHIN THE ROADWAY AREA UNLESS APPROVED BY THE ENGINEER: 14. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTION OF NE 28TH ST /'JONES :AVE NE AND NE 20TH ST / JONES AVE NE: wwro 27 :. REFER TO THE COVER'SHEET' OF THESE CONSTRUCTIONS PLANS FOR THE RESPECTIVE COORDINATES.. !;CAAmit -L, jUL z 7 Z001 S -121 1 6 1 4Ln - �� 6 z 3 S /A _r-, Rw',�, &1 1 1 41 I ,i GIP. '73 I�It{ I I 1 r