Loading...
HomeMy WebLinkAboutS-216236N Q0 CN I t` N � a �ya(lD5 N cfl a N /, I CL ry W o 1/2 PLUG AS DAM z W ONE LENGTH OF DUCTILE IRON TT PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN B MORE THAN 4'. / 1 TYPICAL 1, 11 TEE 12" MIN, MANHOLE (` I F 6" MIN. ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) T0. SOLID BEARING WHEN SPAN IS MORE THAN 4'. Q W W 5 � 1 -6' GATE VALVE (MJxNJ) zo z W Q:-1 2- RO -MAC COUPLINGS DI TO STL 1 -6- PLUG (MJ) W /2'1AP & TEMP. BLOW -OFF TEMP. BLOCK Lli CL v, Q� Qcn �Q W �z I V) Q N c- Nr W W o z� 9 F- cf) Q W N O N N C a z q . 1 a° y o r � N C 3€ N ¢ �a c E atv� �N �y C_ I O y> z a 0 ¢ g� N z \ N Z U � O \ \ U O a a w 0 m 0 O' �I z� z CONCRETE DEAD MAN BLOCKING WITH SHACKLE RODS TO CAP, BLOCK SHALL BE POURED AGAINST UNDISTURBED EARTH, SIZE OF BLOCK TO BE DETERMINED BASED ON TEST PRESSURE OF WATER LINE AND SOIL CHARACTERISTICS. CAST IRON CAP OR PLUG WITH 2" �IPS TAP SHALL BE A ROCKWELL 482 END CAP COUPLING. WATER MAIN / ///���2" GALVANIZED IRON PIPE / AS REQUIRED. 2" CLOSE NIPPLE J / 2" 90• ELBOW ` 2" GALVANIZED IRON PIPE, 12" LONG. PLAN TWO PIECE CAST IRON VALVE BOX VALVE NUT EXTENSION IF REQUIRED EQUAL TO RICH VALVE CO. STANDARD (SEE DWG BR46 /PAGE 6090) 8" TOP SECTION, WITH REGULAR BASE SECTION LENGTH TO FIT. INSTALL 2" 90' ELBOW, SCREWED T 2" PLUG, SCREWED 18" 2" GALVANIZED IRON PIPE 12" LONG 2" GALVANIZED IRON PIPE AS REQUIRED. 2" GATE VALVE, SCREWED INSTALL 2" 90' ELBOW, SCREWED 2" GALVANIZED IRON PIPE AS REQUIRED, TEMPORARY 2" BLOW -OFF ASSEMBLY O STA. 15 +92 6" MIN. H 6" MIN. -I \ +� I-6" MIN. - I L / ✓/ 6" MIN. I I I \ /, 1/2 BLIND FLANGE AS DAM D.I.P. TEE CL.50 1/2 PLUG AS DAM 2 -8' BLIND FLANGES(ON£ W/27AP & 2-PLUG) ONE LENGTH OF DUCTILE IRON TT PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN B MORE THAN 4'. / 1 TYPICAL 1, 11 TEE 12" MIN, MANHOLE (` I F 6" MIN. ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) T0. SOLID BEARING WHEN SPAN IS MORE THAN 4'. FLEXIBLE I i II FLEXIBLE I I � FLEXIBLE JOINT JOINT I BACKFILL WITH _ COMPACTED MATERIAL BACKFILL WITH AS DIRECTED BY I f a COMPACTED MATERIAL ENGINEER. 6" MIN. AS DIRECTED BY I N ENGINEER. WITH MIN.04 6" MIN. - I <I N I II SHACKLE RODS F —I I CEMENT CONCRETE CLASS C POURED IN PLACE CEMENT CONCRETE CLASS C BLOCK / 90• BEND POURED IN PLACE J (TY U -651) D.I.P. 90• BEND ATYPICAL MANHOLE I CL50(MJ X PE) FOUNDATION CONSTRUCTION CONCRETE ENCASED DUCTILE IRON DROP CONNECTION DROP CONNECTION OUTSIDE DROP CONNECTION NTS wT/Q - 27 - 816? WWII - :a -a*2 WATER MAIN CONNECTION DETAILS EXISTING 6- STEEL WATER LINEN I I I 87x8' VERTICAL CROSS(A/JxFL) CU 2 -8' BLIND FLANGES(ON£ W/27AP & 2-PLUG) -x'6- 6'x6' TEE (MJxFL) W/ CONC. BLOCK 1 -8' PLUG YJ W/27AP & 2' BLOW -OFF ( ) 1 -6' GATE VALVE (FLxAIJ) TEMP. BLOCK - INSERT CLEANING POLY -PIG' 1 -6' GATE VALVE (MJxNJ) O �I 2- RO -MAC COUPLINGS DI TO STL 1 -6- PLUG (MJ) W /2'1AP & TEMP. BLOW -OFF TEMP. BLOCK NEW 8' WATER LINE I i PLAN VIEW EXISTING 6' STEEL WATER LINE TESTING DETAIL AT ABERDEEN AVE NE -Rol• NOTES: 1_ ALL PIPE SHALL BE SIMILAR MATERIAL AS MAINLINE. 2. STAINLESS STEEL STRAPS SHALL'HAVE A MAXIMUM SPACING OF 18 ". STRAPS SHALL BE ATTACHED UTILIZING STAINLESS STEEL EXPANSION BOLTS, MIN. 2 EACH AT CONNECTION POINTS. INSIDE DROP CONNECTION TO 54" DIA MANHOLE NTS EXISTING 6' STEEL WATER LINE I AFTER ALL TESTING, CLEANING AND DISINFECTION, REMOVE TEMP. BLOCK & BLOW -OFF & CONNECT WITH 6'xB' INCREASER (PE w) AND 8" SOLID St £EV£ & 8" D.I. SPOOLS SHACKLE CROSS TO VALVE W/ 2 -314' RODS Q�'� NEW 8- WATER LINE rn I I EXISTING 6' STEEL WATER UNE FINAL CONNECTION DETAIL AT ABERDEEN AVE NE I 1 5 m2lib 2-36f W-242 ) 5' -0" TRENCH LIMITS FOR 18" O.D. HOPE & 28" O.D. HOPE DUAL LINE TRENCH 3' -0- O 28" O.D. ------ ----------- NOTES: 1. THE TRENCH PLUGS SHALL EXTEND 2 FEET BELOW THE BOTTOM OF THE 5' WIDE DUAL PIPE TRENCH BY 3 FEET EITHER SIDE OF THE TRENCH BY 1 FOOT BELOW THE ELEVATION OF THE SURROUNDING GROUND. TRENCH PLUGS SHALL BE A MINIMUM OF 3 FEET IN LENGTH. CONTROL DENSITY FILL TRENCH PLUG �h SCAMEO JUL £ 7 2001 �{- 1 I �-U I L- I 1 1 e v