Loading...
HomeMy WebLinkAboutS-223909�z r'\ \ AP�\ r° + � F N U O O w ° w + w zz 2 o a 9 ! FILENAME: UT9 "ENO. STATE IFED. AID PROJ. NO. L) a Su. PLOT DATE: 8/24/90 Y W 3 01 DRAWN G.O. 10 WASH F a o_ ACI- 405 - 3(780) °a o r W CHECKED 'DNP 10/92 AS -BUILT PLANS ONLY fDNPj Joe NuMeER ir w to F x PROJ. ENGR. J.E. JOHNSON 9/4/90 ADDED CALLOUTS 90W069 DIST. ADM. R.Q. ANDERSON 8/30/90 ADDED HYDRANT AND CONN. TO 6 "W CONT RACT NU GER I APP'D 385 Y REPLACE EXISTING 6" PIPE WITH NEW 6 "0 DUCTILE IRON PIPE. FROI UT9 -33 TO UT9 -35 CONSTRUCTION. RELAY SIDE SEWERS AS REQUIRED. "i 1 RELOCATE CONCRETE THRUST BLOCK ` FOR 6 "W FOR C.R.PL. CONSTRUCTION. FROM C STA. 21 +17 (7' LT) TO C STA. 21 +32 (7' LT) Y _ Y Rf4Y- OX 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 NOTE: SEE UT1 FOR .SHEET LEGEND AND GENERAL NOTES 30 0 30 60 90 120 SCALE IN FEET HIGHWAY DMSION lk,m 11 0`-% W88111nvtOn State sR Boa TUKWILA TO SUNSET BLVD �� ® ®— ® Department of Transportation CEDAR RIVER PIPELINE$- RELOCATION 45,w Z*,Wl % a SHEET 106 UTILITY PLAN PR R� RoseWafer Engineeringl, Inc. STA M17 +50 TO STA FR25 +50 317 SHEETS SRy� 13/ Y _ Y Rf4Y- OX 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20