Loading...
HomeMy WebLinkAboutS-22630C70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 260.00 260.00 STA 3 +75, 13.2' RT i r EDGE OF PAVEMENT WITH CURB STA 13 +25, 12.8' RT R/W 250.00 % 250.00 ASPHALT DISPLACED EAST OF CRACK. STA 14 +00, 14.8' RT EDGE -OF- PAVEMENT- -WffH- -CURB 260.00 NO REPAIR REQUIRED, TYPICAL R/W 260.00 250.00 240.00 CRACK 250.00 240.00 2.30.00 I / 230.00 R/W STA = 13+75 i ASPHALT DISPLACED EAST OF CRACK. i 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 STA 14 +50, 13.6' RT 2 5 0.0 0 EDGE OF PAVEMENFT WITH+ G{iRB 255 0.00 R/W 240.00 240.00 ASPHALT DISPLACED EAST OF CRACK. NO REPAIR REQUIRED, TYPICAL. CRACK 230.00 y 230.00 220.00 R/W 220.00 STA = 14+50 STA 13 +50, 11.2' RT EDGE OF PAVEMENT WITH CURB STA 14 +25, 13.7' RT AND 2 BLOCK HIGH WALL EDGE OF PAVEMENT WITH- -CURB- 260.00 / 260.00 250.00 250.00 / R/W I R/W 250.00 I 250.00 240.00 ASPHALT DISPLACED EAST OF CRACK. 240.00 / NO REPAIR REQUIRED, TYPICAL. ASPHALT DISPLACED EAST OF CRACK. CRACK NO REPAIR REQUIRED, TYPICAL. CRACK 240.00 240.00 230.00 230.00 R/W RIW 220.00 STA = 14 +25 220.00 I STA = 13+50 wr vwp - I NOTES: CROSS SECTION CENTERLINE IS APPROXIMATE CENTER OF EXISTING ROADWAY. FOR PAVEMENT PATCHING, REFER TO ASPHALT PAVEMENT PATCH DETAIL /SHEET6. FOR PAVEMENT EXTENSION, REFER TO ASPHALT PAVEMENT EXTENSION DETAIL /SHEET 6. FOR TRENCHES, REFER TO TRENCH DETAIL /SHEET 6. FOR BLOCK `WALLS, REFER TO BLOCK WALL' DETAILS /SHEET 6. m SCALE: 1" = 10' (VOTE PAVEMENT AND CURB WORK DELETED FROM CONTRACT Pg C. SC' wasg� �l o��eti a�Q n REVISED TO CONFORM TO CONSTRUCTION RECORDS � ' �=� e, MARK MILLER 10/24/00 2220 v �'arsr SICNF,p; RH2 ENGINEERING INC. DATE $LORAL 06112198 E %PIKES 9/21/00 F�R 1411MILL 1� 6-9 i z, I. 270.00 270.00 STA 13 +25, 12.8' RT EDGE - OF- -PAV €M €NT -MTH -CURB AND 2 BLOCK HIGH WALL STA 14 +00, 14.8' RT EDGE -OF- PAVEMENT- -WffH- -CURB 260.00 R/W 260.00 250.00 250.00 I / R/W ASPHALT DISPLACED EAST OF CRACK. 250.00 250.00 240.00 NO REPAIR REQUIRED, TYPICAL. 240.00 ASPHALT DISPLACED EAST OF CRACK. CRACK NO REPAIR REQUIRED, TYPIrAL_ CRACK 240.00 20 -0.00 230.00 230.00 R/W RIW STA = I 1 d i nn ■-r vv � zn n 2��.0 I STA =.1;3-x-25 230.00 220.00 v 220.00 I I 220.00 220.00 210.00 210.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 CROSS SECTION INFORMATION REVISED TO CONFORM TO CONSTRUCTION RECORDS I DMB I MLM 10/24/00 wr vwp - I NOTES: CROSS SECTION CENTERLINE IS APPROXIMATE CENTER OF EXISTING ROADWAY. FOR PAVEMENT PATCHING, REFER TO ASPHALT PAVEMENT PATCH DETAIL /SHEET6. FOR PAVEMENT EXTENSION, REFER TO ASPHALT PAVEMENT EXTENSION DETAIL /SHEET 6. FOR TRENCHES, REFER TO TRENCH DETAIL /SHEET 6. FOR BLOCK `WALLS, REFER TO BLOCK WALL' DETAILS /SHEET 6. m SCALE: 1" = 10' (VOTE PAVEMENT AND CURB WORK DELETED FROM CONTRACT Pg C. SC' wasg� �l o��eti a�Q n REVISED TO CONFORM TO CONSTRUCTION RECORDS � ' �=� e, MARK MILLER 10/24/00 2220 v �'arsr SICNF,p; RH2 ENGINEERING INC. DATE $LORAL 06112198 E %PIKES 9/21/00 F�R 1411MILL 1� 6-9 i z, I.