Loading...
HomeMy WebLinkAboutS-226321MCC CONTROL DEVICES M-^.. IYIiIYI — T S MCC SECTION # NAMEPLATE SECTION # NAMEPLATE SECTION DEVICES LEGEND REMOTE. CONTACTS - SECTION 1 SECTION 3G 2A POWER MONITOR POWER MONITOR PHASE FAILURE (OUTPUT) 1A INCOMING COMPARTMENT I 3G 60A BREAKER XFMR BREAKER 44 PILOT LIGHT, TRANSFORMER TYPE, WHITE LENS CONTROL POWER ON I — PILOT LIGHT, TRANSFORMER TYPE, AMBER LENS PUMP REQUIRED PUMP CALL (INPUT) SECTION 2B SECTION 3J PILOT LIGHT, TRANSFORMER TYPE, GREEN LENS PUMP RUN PUMP RUN (OUTPUT) 2B POWER METERING COMPARTMENT 3J 25KV, 1PH, TRANSFORMER PILOT LIGHT, TRANSFORMER TYPE, RED LENS I PUMP FAIL PUMP FAIL (OUTPUT) PILOT LIGHT, TRANSFORMER TYPE, WHITE LENS SEAL FAIL SEAL FAIL (OUTPUT) PILOT LIGHT, TRANSFORMER TYPE, RED LENS HIGH MOTOR TEMP. HIGH MOTOR TEMP. (OUTPUT) MUSHROOM HEAD (PUSH /PULL) PUSH BUTTON EMERGENCY STOP SECTION 2E SECTION 4A HUMAN INTERFACE MODULE (DOOR MOUNT) 2E 48OV, 3 PHASE, 225A SERVICE 4A 150A BREAKER DISCONNECT BREAKER NO. 1 SEWAGE LIFT PUMP 54 PILOT LIGHT, TRANSFORMER TYPE, WHITE LENS CONTROL POWER ON PILOT LIGHT, TRANSFORMER TYPE, AMBER LENS PUMP REQUIRED PUMP CNLL (INPUT) SECTION 3A SECTION 5A PILOT LIGHT, TRANSFORMER TYPE, GREEN LENS PUMP RUN PUM^ RUN (OUTPUT) 3A 125 A BREAKER 5A 150A BREAKER PILOT LIGHT, TRANSFORMER TYPE, RED LENS PUMP FAIL PUMP FAIL (OUTPUT) PANEL "L" NO. 2 SEWAGE LIFT PUMP PILOT LIGHT, TRANSFORMER TYPE, WHITE LENS SEAL FAIL SEAL FAIL (OUTPUT) PILOT LIGHT, TRANSFORMER TYPE, RED LENS HIGH MOTOR TEMP. HIGH MOTOR TEMP. (^LITPUT) ALL OTHER SECTIONS TO BE MUSHROOM HEAD (PUSH /PULL) PUSH BUTTON EkCKGENCY STOP MARKED AS SPARE HUMAN INTFRFA('F mnni)i F ( ,)(-,np Mn11NTi MCC LAYOUT 1" = 1' -0" HOUSEKEEPING PAD. SEE DWG NO. LM1 FOR DETAILS. MCC NO -E: ALL ELECTRICAL AND TELEMETRY CABINETS MUST BE BRACED AGAINST THE @FALL'' TO MEET' UBC STANDARDS FOR EARTHOt;AKE RESTRAINTS: °SEISMIC 20NE i .. BRACING SliALL NOT BE YIS'Ii�E'i WHEN ENCLOSUREiD00RS ARE CLOSED.' An L1 / L2 L3 CB �— G- TLDEMCE EL 0- FI0- F EMERG. STO P 480V � 120V PER CP -M1 CR1 TEMP. SWITCH SEAL FAIL PROBE IN MOTOR -- - -_ 41% SMC PLUS OLr 1 T2 MTP T3 JC1 II ICI I Cl CR PUMP CALL FROM CONTROL PANEL 1 "A - - PUMP REQUIRED LIGHT CR HIGH TEMPERATURE SWITCH CR2 2 — - - R - HIGH MOTOR TEMPERATURE LIGHT CR HIGH TEMPERATURE SWITCH _ _ CR3 3 - W SEAL FAILURE LIGHT C MOTOR STARTER CONTACT R SMC UNIT FAILURE LIGHT - - PFR VFD CONTROL UNIT VFD CONTROL UNIT -- CR4 CR PUMP RUN RELAY 4 -oc- OPERATION COUNTER RTM RUN TIME METER G - PUMP RUN LIGHT CR SMC UNIT FAILURE RELAY CR5 R SMC UNIT FAILURE LIGHT - - PFR PHASE FAIL RELAY - C BYPASS CONTACTOR PER 1 _ W - _,. CONTROL POWER ON TYPICAL PUMP MOTOR CONTROL LOGIC Slm?26321 NO SCALE REVISED TO CONFORM —� TO CONSTRUCTION RECORDS MARK MILLER 10124/00 RH2 ENGINEERING INC. DATE REVISED TO CONFORM TO CONSTRUCTION RECORDS DJB MLM 10/24/00 NO. REVISION BY REV'[F4V RH2 ENGINEERING, INC. F WAS E N G-1 N E E IRS SOTHEEL OFFICE �e F PLANNERS S C I E N T I S T S EAST WENATCHEE OFFICE .q, 16727 "b.�ike�rsTSRe °� SIGNED: DRAWING IS NOT TO SCALE 6 " I 0611, ;798 0 F BAR IS NOT 2" LONG exPlRes a z of 1 City of Renton - Devil's Elbow Sewer and Roadway Improvements - Schedule A MCC CONTROL LOGIC AND DETAILS JOB NO_ FlLE ENGINEER NCVEWLO HAIL. SCAT PLO I' INC NG. SHU I 96. 1024 1 DE -E06R I MM I ORE DEC 07, 2000 SHOWN 24 1 LE6 1 310,32 1�r c