ABBREVIATIONS I CONSTRUCTION NOTES I GENERAL NOTES I LEGEND
C
AS:O -IAl CONCRFTE.
PF. PLAIN END
1. THE CONTRACTOR SHALT_ FIELD VERIFY ALL EXISTING PIPE SIZES, THEIR LOCATIONS,
submittal aid
approval
signatures, and
AND INVERT ELEVATIONS (WITH POT HOLE METHOD), PRIOR TO THE PIPE CONNECTIONS.
ARAN
ABANDONED
PI POINT OF INTFRSFC1ION
96 J
RECOMMENDED:
NONE
2. THE CONTRACTOR SHALT_ SUPPORT, PROTECT AND KEEP IN SERVICE ALL EXISTING
III
APARTME N^
PSI POUNDS PER SQUARE INCH
UTILITIES DURING THE PIPELINE WORK UNLESS NOTED OTHERWISE,
APPROX
A'PROXIMAII:-
PVC POLYVINYL CHLORIDE
3. EXISTING UTILITY LCCATIONS ARE APPROXIMATE. THE LOCATION OF EXISTING
W/M7 -94
UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. CALL
A-F.
ASPHALT TREATED BASE
PW PRODUCTION WELL
48 HOURS BEFORE YOU DIG FOR UTILITY LOCATIONS: 1- 800 - 424 -5555.
BLCG
BJ',LDING
R RIGHT, RADIUS
4. WHEN EXCAVATING IN THE VICINITY OF ANY POWER POLES OR SUPPORTS, THE
CONTRACTOR " "ST SUPPORT AND PROTECT ALL POLES OR SUPPORTS WITHOUT
BLVD
BOULEVARD
R/W RIGHT OF WAY
UNDERMINING THEIR STABILITY.
BNRR
BURLINGTON NORTHERN RAILROAD
PONT REINFORCED
5. CONTRACTOR SHALL MAINTAIN SIDE SEWER FLOWS DURING CONSTRUCTION, TEST
RESTORED SIDE SEWERS BEFORE BACKFILLING, AND PROVIDE MATERIALS AND LABOR
C,CONC
CONCRETE
RCP REINFORCED CONCRETE PIPE
TO RELAY SIDE SEWERS TO ELIMINATE CONFLICT WITH THE NEW METRO PIPELINE.
SEWERS SHALL BE INSTALLED AT A MINIMUM SLOPE OF 29 AND A MAXIMUM SLOPE
CB
CATCH BASIN
REQ'D REQUIRED
OF 509.
C1
CAST IRON
S SIGN,SLOPE
6. THE CONTRACTOR SHALL PROTECT THE EXISTING TELEPHONE DUCTS, DIRECT BURIED
CABLE AND VAULTS FROM DAMAGE DURING CONSTRUCTION. THE CONTRACTOR SHALL
CL
CENTERLINE,C;.ASS
SCH SCHEDULE
NOTIFY US WEST COMMUNICATIONS, MR. FRANK FORREST AT 235 -3012, A MINIMUM
OF ONE (1) WEEK M ADVANCE OF CONSTRUCTION IN THE VICINITY OF TELEPHONE
CDF
CONTROL_ BENSII)' FILL
SD STORM DRAIN
LINES.
CO
CLEANOUT
SEC SECTION
7. PRIOR TO THE PAVEMENT REMOVAL AND TRENCH EXCAVATION, CONTRACTOR SHALL
NOTIFY WASHINGTON NATURAL GAS, M5. JEAN FREEMAN AT 224 -2377, FOR THE ,
CONK
CONNECTION
SS SANITARY SEWER
ENCOUNTERED HIGH PRESSURE PIPES.
CONST
CONSTRUCTION
STA STATION
8. WHERE NEW PIPE CLEARS AN EXISTING UTILITY BY 6 INCHES OR LESS, RIGID
STYROFOAM SHALL BE INSERTED BETWEEN TO PROVIDE A CUSHION.
CPEP
CORRUGATED POLYETHYLENE PIPE
STL STEEL
9. CONTRACTOR SHALL MAINTAIN ALL EXISTING STORM AND SANITARY FLOWS DURING
CR
CRUSHED ROCK
T TELEPHONE
CONSTRUCTION.
DIA
DIAMETER
TYP TYPICAL
10. ALL EXISTING UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE RESTORED
USING ONLY NEW MATERIALS AND IN ACCORDANCE WITH CURRENT CITY OF RENTON
DIP
DUCTILE IRON PIPE
UG UNDERGROUND (CONDUIT)
STANDARD PLANS AND SPECIFICATIONS. WORK SHALL BE PERFORMED IN A MANNER
ACCEPTABLE TO THE UTILITY OWNER.
E
EAST
UT UTILTIY BOX
11. ALL EXISTING UTILITIES NOT SHOWN ON THE DRAWINGS WHICH ARE ENCOUNTERED
EST
EASTSIDE INTERCEPTOR
V VALVE
DURING CONSTRUCTION SHALL BE PROTECTED EXCEPT WHEN DIRECTED OTHERWISE
BY THE ENGINEER.
EV
ELECTRICAL VAULT
VLT VAULr
12. THE CONTRACTOR SHALL VERIFY ALL INACTIVE EXISTING SEWERS AND STORM
EW
EACH WAY
VAR VARIES
DRAINS, AND SHALL PLUG AND FILL ABANDONED PIPES PER ENGINEERS APPROVAL.
EX
EXISTING
VER VERTICAL
13. ALL PIPES WHICH ARE SEVERED AND ARE TO BE ABANDONED SHALL BE PLUGGED
AND FILLED PER SPECIFICATION SECTION M0360a.
FH
FIRE HYDRANT
VCP VITRIFIED CLAY PIPE
14. THE CONTRACTOR SHALL USE CARE WHEN EXCAVATING ADJACENT TO EXISTING
G
GAS
W WATER
MANHOLES, WHICH MUST BE BRACED DURING EXCAVATION. AN OPTION IS TO
BALANCE EXCAVATION AROUND THE MANHOLE. FOR THIS OPTION, SURFACE
GALV
GALVANIZED
W/ WITH
RESTORATION SHALL. BE FULL PANEL WIDTH OF 10' OUTSIDE THE MANHOLE. ALL
COSTS TO BE BORNE BY THE CONTRACTOR.
HP
HIGH PRESSURE
WM WATER METER
15, ALL TREES WITHIN THE CONTRACT LIMITS SHALL BE PROTECTED, RESTORED OR
HOR
HORIZONTAL
XING CROSSING
REPLACED PER SPECIFICATION SECTION 01545.
IF
INVERT ELEVATION
16. THE CONTRACTOR IS REQUIRED TO SUBMIT TRAFFIC CONTROL PLANS TO METRO,
FOR CITY OF RENTON TRANSPORTATION DIVISION APPROVAL. THE TRAFFIC CONTROL
ID
INSIDE DIAMETER
PLAN SHALL INCLUDE THE PIPELINE CONSTRUCTION AND PAVEMENT RESTORATION.
SEE SPECIFICATION SECTION 01570 FOR RESTRICTIONS.
L
LEFT
17. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL DURING THE HOURS OF
LF
LINEAL FEET
CONSTRUCTION AS REQUIRED BY THE CITY OF RENTON AND IN A SAFE, PRUDENT
OPERATING MANNER. DURING THE HOURS OF NON- CONSTRUCTION, THE CONTRACTOR
MAX
MAXIMUM
SHALL MAINTAIN ALL EXISTING TRAFFIC LANES FOR VEHICULAR TRAFFIC. ALL
UNFINISHED WORK SHALL BE LEFT IN A SAFE, NON- HAZARDOUS CONDITION TO THE
MJ
MECHANICAL JOINT
PUBLIC, AND BE IN CONFORMANCE WITH DEPARTMENT OF LABOR AND INDUSTRIES
CHAPTER 296 -155 WAG.
MIN
MINIMUM
18. THE CONTRACTOR SHALL SCHEDULE ALL WORK ACROSS INTERSECTIONS TO ALLOW
MIT
MANHOLE
THROUGH TRAFFIC IN ALL DIRECTIONS DURING PEAK TRAFFIC HOURS. THE PEAK
TRAFFIC HOURS A RF_ MONDAY THRU FRIDAY, 6:30 TO 8:30 A.M. AND 3:00 TO
N
NORTH
5:00 P.M.
OC
ON CENTER
19. THE CONTRACTOR SHALL COORDINATE HIS WORK THROUGH METRO'S ENGINEER, FOR
THE CITY CONTRACTOR WORKING ON PARK AVENUE. CONTACTOR IS CURRENTLY UNDER
OD
OUTSIDE DIAMETER
CONSTRUCTION.
P
POWER
20. CONTRACTOR SHALL NOTIFY CITY OF RENTON TRANSPORTATION OPERATION OFFICE,
BRYSON HUIE AT 277 -6222, A MINIMUM OF 5 DAYS IN ADVANCE OF BEGINNING ANY
PCCP
PORTLAND CEMENT CONCRETE PAVEMENT
WORK AFFECTING, OR IN THE VICINITY OF, TRAFFIC CONTROL SYSTEMS.
21. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO AVOID DAMAGE,
SETTLEMENT OR UNDERMINING OF STRUCTURE FOUNDATIONS IN THE VICINITY OF
CONSTRUCTION. THE PROTECTION MEASURES SHALL BE CONTRACTOR DESIGNED. THE
PLAN AND DESIGN SHALL BE PERFORMED BY A LICENSED STATE OF WASHINGTON
STRUCTURAL ENGINEER AND BE SUBMITTED TO METRO, PER SECTION 01300, FOR
REVIEW. IF METRO DOES NOT APPROVE OF THE CONTRACTOR'S PLAN FOR SUPPORT
OF THE EXISTING STRUCTURE, METRO MAY DIRECT THE CONTRACTOR TO TAKE
ADDITIONAL MEASURES IN ORDER TO SAFEGUARD THE INTEGRITY OF THE EXISTING
STRUCTURE. ..
22. CONTRACTOR SHALL. PROVIDE TEMPORARY PAVEMENT MARKINGS AND CI- IANNELIZATION
DISTURBED AND /OR REMOVED DURING CONSTRUCTION. ALL STREET SIGNAGE REMOVED
AND /OR DESTROYED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED.
1 AS CONSTRUCTED �'i DJB MLT 12 /yt
No. p� REVISION BYAPP DI DATE
1. PROJECT DATUM
HORIZONTAL DATUM:
WASHINGTON COORDINATE SYSTEM NORTH ZONE (HAD 27).
VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD 29)
2. THE PROJECT STATION BASELINE IS 5 FEET SOUTH OF AND PARALLEL TO THE
CENTER LINE OF NORTH THIRD STREET. THE BEGINNING OF THE BASELINE IS
AT THE INTERSECTION POINT OF NORTH THIRD STREET AND THE CENTER OF
BURNETT AVENUE NORTH, IT CONTINUES EAST ALONG NORTH THIRD STREET TO
INTERSECT WITH FACTORY AVENUE NORTH, THEN TURNS SOUTH AND FOLLOWS ALONG
FACTORY AVENUE NORTH TO INTERSECT WITH NORTH BROOKS STREET, THEN TURNS
EAST AND FOLLOWS ALONG NORTH BROOKS STREET. THE PROJECT BASELINE ENDS
AT THE EAST END OF NORTH BROOKS STREET.
3. OVERHEAD ELECTRICAL SERVICE LINES ARE NOT SHOWN IN THEIR ENTIRETY
ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE
EXTENT OF ANY HAZARD CREATED BY OVERHEAD OR UNDERGROUND ELECTRICAL
POWER, THROUGHOUT THE CONSTRUCTION SITE, AND SHALL FOLLOW CONSTRUCTION
PROCEDURES AS REQUIRED BY LAW AND BY REGULATION. PRIOR TO CONSTRUCTION,
THE CONTRACTOR SHALL MEET WITH UTILITY OWNERS, DETERMINE THE EXTENT
OF THE HAZARD, AND TAKE WHATEVER PRECAUTIONS AND REMEDIAL MEASURES MAY
BE REQUIRED.
4. ALL PROPERTY CORNERS, RIGHT -OF -WAY MARKERS, SURVEY MONUMENTS AND
FENCES TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE FIRST
LOCATED AND REFERENCED BY A SURVEY, THEN RESTORED IN THEIR ORIGINAL
LOCATION.
5. THE FIRE DEPARTMENT MUST BE NOTIFIED 24 HOURS IN ADVANCE IF ACCESS
TO A HYDRANT OR ROADWAY WILL BE BLOCKED.
6. THE EXISTING GRADE SHOWN IN PROFILE ON ALL PLAN /PROFILE SHEETS 15
AT CENTER OF THE STREET.
SECTION AND DETAIL NUMBERING SYSTEM
(1) THE SECTION IS CUT ON DRAWING M303
SECTION NUMBER
® 3
.307
- DRAWING ON WHICH
SECTION APPEARS
(2) ON DRAWING M307 THIS SECTION IS IDENTIFIED
- SECTION NUMBER
SECTION 3
LE
SCA: 3/8" = 1' -0" M303
- DRAWING ON WHICH
SECTION WAS TAKEN
(3) DETAILS ARE CROSS- REFERENCED IN A SIMILAR MANNER,
EXCEPT THAT DETAILS ARE IDENTIFIED BY LETTER
RATHER THAN BY NUMBER.
As Built
Drawing'
See original file
copies for
submittal aid
approval
signatures, and
for engineer's
profess i
Dal seal
12
96 J
t
>�C
LU
W
i1
�l
ABi.\
Q
C, 5
® B -1
T - -
SS
-- SD
UG
G
W
0
H
ORNAMENTAL STREET LIGHT
ANGLE POINT OR HUB
SURVEY MONUMENT
FIRE HYDRANT
MANHOLE
VALVE
WATER METER
ABANDONED WATER METER
UTILITY POLE W/ GUY
LIGHT POLE
OVERHEAD SIGNALIZATION
STREET SIGN
VALVE
VAULT
CATCH BASIN
HANDHOLE
TELEPHONE VAULT
UTILITY VAULT
BORING (MONITORING WELL CASEMENT)
TREE
SHRUBBERY
EX PIPING W/ NEW PLUG
TELEPHONE
SANITARY SEWER
STORM DRAIN
UNDERGROUND CONDUIT
GAS
WATER
POWER
EXISTING LATERAL PIPE OR UTILITY (PROFILES)
NEW LATERAL PIPE OR UTILITY (PROFILES)
STREET RIGHT - -OF -WAY
MONUMENT LINE
M -LT /DJB
zn
00
z
Municipality of Metropolitan Seattle
0 0
r Z
SP229102
0
w 4.°
z .¢
z Iv w
O�U)
CEDAR RIVER TRUNK RELOCATION
U
�N
DJB ',M LT
� U
F- z
131554
Y75
M -LT /DJB
"- m R ®
Municipality of Metropolitan Seattle
JUNE 1994
DRAWN: CHECKED
:SCALE:
CEDAR RIVER TRUNK RELOCATION
- --
F„-`. NO:
DJB ',M LT
'
PHASE 2
Y75
RECOMMENDED:
NONE
DRAWING N0:
III
II CONTRACT NO. - - -;', NOTES,
LEGEND & ABBREVIATIONS
'I. G102
APPROVEDS'1
W/M7 -94
_-_ - -- _- -_
SH _O. __ Ur -
sHeE7uo: or
2 12
G
H