Loading...
HomeMy WebLinkAboutS-22910D5 4 3 2 i \ N 1 1 1 Sl - AQUIFER PROTECTION AREA BOUNDARY — - - -- - -- - -/ - -- -- ---- - --- -- > - - _ 73 (n i 7 w IwI Q ��A�� V � - - - - , -i I w > > \ I a o N / J N MARION ST n YI �wI 01 —N \` o Q' V `� N 3RD ST � I � i - -- �` y - - - -- n 42 CEDAR RIVER (TRUNK RELOCATION PHASE 2f (EXISTING) Z, i �" II '` I I I II I I R--- sT Q �I - -- 7 _ r I .I li I-j II II � S LIj o 1 I -� � Ll � , , -- ILI L� �j'� - - - -- G _ ��ii N 2ND ST ��� �iL --J -- I PW -3• LIBERTY o f F V PARK I o O � O z Io SF� 0 CEDAR RIVER PW /8. PARK F j o o V / DPW- • ��o �O C202 ti ,�\ GT F / ORIGINAL DAR RIVER TRUNK \' �R 1�HABILITATION 200 0 200 400 600 PQ� CEDAR RIVER AS CONSTRUCTED =_= DJB 0/9 No. REVISION BY APP'D DATE ww i is4, LOCATION MAP F G H TYPICAL SECTION AND DETAIL REFERENCING SYSTEM DWG # ` SN KENMOREB T ELL OHOMISH CO KING CO G101 (1) THE SECTION IS CUT ON DRAWING A101 2. 0> DUVALL SECTION NUMBER CEDAR RIVER TRUNK RELOCATION — PHASE 3 3. C101 PLAN AND PROFILE STA 0 +00 TO STA 3 +40 G- C102 ELEVATION NUMBER 5. a22 KID AND PLAN AND PROFILE STA 8 +20 TO STA 12 +60 ® ® 3 2/A103 C104 REDMOND A105 / `� 0 _ °J 8. \L/ DRAWING ON WHICH SECTION /ELEVATION N EATTLE MEDI A `20�' / APPEARS - INDICATES 10. ELLEVUE TYPICAL TRENCH SECTION, RESTORATION DETAILS THE DRAWING IS ON THE SAME SHEET. C109 C110 90 IRE ° °M "E " (2) ON DRAWING A105 THIS SECTION IS IDENTIFIED n _I CONTRACT ND: SECTION NUMBER APPROVED: /( SSAQUAH SECTION 1 16 PROJECT SCALE: 1 1/2 "= 1' -0" Al o2 509` LOCATION DRAWING ON WHICH R -N'ON °� SECTION WAS TAKEN. TUKWILA i 69 - INDICATES THE VAS HON DES 67 DRAWING IS TAKEN ISLAND MOINES MAPLE FROM THE SAME SHEET. KENT VALLEY (3) DETAILS ARE CROSS- REFERENCED IN A SIMILAR MANNER, EXCEPT THAT DETAILS ARE IDENTIFIED 8 5 169j BY LETTER RATHER THAN BY NUMBER. AUBURN ALGONA TACOMA PAC( C VICINITY MAP D 2 6 8 � INDEX TO DRAWINGS SHT # DWG # TITLE 1. G101 VICINITY /LOCATION MAPS AND INDEX TO DRAWINGS 2. G102 NOTES, LEGEND AND ABBREVIATIONS CEDAR RIVER TRUNK RELOCATION — PHASE 3 3. C101 PLAN AND PROFILE STA 0 +00 TO STA 3 +40 4. C102 PLAN AND PROFILE STA 3 +40 TO STA 8 +20 5. C103 PLAN AND PROFILE STA 8 +20 TO STA 12 +60 6. C104 PLAN AND PROFILE STA 12 +60 TO STA 17 +20 7. C105 PLAN AND PROFILE STA 17 +20 TO STA 21 +15.14 8. C106 MANHOLE DETAILS 9. C107 JACKING DETAILS 10. C108 TYPICAL TRENCH SECTION, RESTORATION DETAILS 11. 12. C109 C110 STANDARD METRO FRAME AND COVER 22 CORROSION TEST STATIONS AM As Builtj Drawin; See original ile copies for submittal a d approval signatures, on for engineer's pr1e01n96 al �q 14�11 4� r G H ORIGINAL CEDAR RIVER TRUNK REHABILITATION V f oV 13. C201 ALIGNMENT PLAN STA 0 +00 TO STA 19 +80 4 14. C202 ALIGNMENT PLAN STA 19 +80 TO STA 41 +38 N 15, C203 EX MANHOLE PLANS, AND SECTION R� 16. C204 MISCELLANEOUS DETAILS AND SCHEDULE a- 132768 DESIGNED: M E T R ® Municipality of Metropolitan Seattle I DATE: I, OCT 95 DJB DRnwN: I CHECKED: SCALE: CEDAR RIVER TRUNK RELOCATION ,PILE " °, DJB PHASE 3 AND REHABILITATION E13 IRE ° °M "E " °E -- NOTED VICINITY /LOCATION MAPS, DRAW' "° — _I CONTRACT ND: G 1 0 1 APPROVED: W /M1 -96 AND INDEX TO DRAWINGS SHEE-No D- 1 16 r G H