HomeMy WebLinkAboutS-22910D5
4
3
2
i
\
N 1 1 1 Sl - AQUIFER PROTECTION AREA BOUNDARY — - - -- - -- - -/
- -- -- ---- - --- --
>
- - _
73 (n i 7 w IwI Q ��A�� V � - - - -
, -i I w > > \
I
a o N / J
N MARION ST
n YI �wI 01 —N \`
o Q' V `�
N 3RD ST
� I �
i - -- �`
y - - - --
n 42 CEDAR RIVER (TRUNK RELOCATION PHASE 2f (EXISTING)
Z,
i
�" II '` I I I II I I R--- sT
Q
�I - -- 7
_ r
I .I
li I-j II II
� S
LIj
o 1 I -� � Ll � , , --
ILI L� �j'� - - - -- G _
��ii N 2ND ST ���
�iL --J --
I
PW -3•
LIBERTY
o f F V PARK
I o O
�
O
z
Io
SF� 0
CEDAR RIVER
PW /8. PARK F
j o
o V / DPW- • ��o �O
C202 ti ,�\ GT
F
/ ORIGINAL DAR RIVER TRUNK \'
�R
1�HABILITATION
200 0 200 400 600 PQ�
CEDAR RIVER
AS CONSTRUCTED =_= DJB 0/9
No. REVISION BY APP'D DATE
ww i is4,
LOCATION MAP
F G H
TYPICAL SECTION AND
DETAIL REFERENCING SYSTEM
DWG #
`
SN
KENMOREB T ELL
OHOMISH CO
KING CO
G101
(1) THE SECTION IS CUT ON DRAWING A101
2.
0>
DUVALL
SECTION NUMBER
CEDAR
RIVER TRUNK RELOCATION — PHASE 3
3.
C101
PLAN AND PROFILE STA 0 +00 TO STA 3 +40
G-
C102
ELEVATION NUMBER
5.
a22
KID AND
PLAN AND PROFILE STA 8 +20 TO STA 12 +60
®
® 3 2/A103
C104
REDMOND
A105 /
`�
0
_
°J
8.
\L/
DRAWING ON WHICH
SECTION /ELEVATION
N
EATTLE MEDI A
`20�'
/
APPEARS - INDICATES
10.
ELLEVUE
TYPICAL TRENCH SECTION, RESTORATION DETAILS
THE DRAWING IS ON
THE SAME SHEET.
C109
C110
90
IRE ° °M "E "
(2) ON DRAWING A105 THIS SECTION IS IDENTIFIED
n
_I
CONTRACT ND:
SECTION NUMBER
APPROVED:
/(
SSAQUAH
SECTION
1 16
PROJECT
SCALE: 1 1/2 "= 1' -0" Al o2
509`
LOCATION
DRAWING ON WHICH
R -N'ON
°�
SECTION WAS TAKEN.
TUKWILA
i 69
- INDICATES THE
VAS HON
DES 67
DRAWING IS TAKEN
ISLAND
MOINES
MAPLE
FROM THE SAME SHEET.
KENT
VALLEY
(3) DETAILS ARE CROSS- REFERENCED IN A SIMILAR
MANNER, EXCEPT THAT DETAILS ARE IDENTIFIED
8
5
169j
BY LETTER RATHER THAN BY NUMBER.
AUBURN
ALGONA
TACOMA
PAC( C
VICINITY MAP
D 2 6 8
�
INDEX TO DRAWINGS
SHT #
DWG #
TITLE
1.
G101
VICINITY /LOCATION MAPS AND INDEX TO DRAWINGS
2.
G102
NOTES, LEGEND AND ABBREVIATIONS
CEDAR
RIVER TRUNK RELOCATION — PHASE 3
3.
C101
PLAN AND PROFILE STA 0 +00 TO STA 3 +40
4.
C102
PLAN AND PROFILE STA 3 +40 TO STA 8 +20
5.
C103
PLAN AND PROFILE STA 8 +20 TO STA 12 +60
6.
C104
PLAN AND PROFILE STA 12 +60 TO STA 17 +20
7.
C105
PLAN AND PROFILE STA 17 +20 TO STA 21 +15.14
8.
C106
MANHOLE DETAILS
9.
C107
JACKING DETAILS
10.
C108
TYPICAL TRENCH SECTION, RESTORATION DETAILS
11.
12.
C109
C110
STANDARD METRO FRAME AND COVER 22
CORROSION TEST STATIONS AM
As Builtj Drawin;
See original ile copies for
submittal a d approval
signatures, on for engineer's
pr1e01n96 al
�q 14�11
4�
r
G H
ORIGINAL CEDAR RIVER TRUNK REHABILITATION
V f oV
13.
C201 ALIGNMENT PLAN STA 0 +00 TO STA 19 +80
4
14.
C202 ALIGNMENT PLAN STA 19 +80 TO STA 41 +38
N
15,
C203 EX MANHOLE PLANS, AND SECTION
R�
16.
C204 MISCELLANEOUS DETAILS AND SCHEDULE
a-
132768
DESIGNED:
M E T R ® Municipality of Metropolitan Seattle
I DATE:
I, OCT 95
DJB
DRnwN:
I CHECKED: SCALE: CEDAR RIVER TRUNK RELOCATION
,PILE " °,
DJB
PHASE 3 AND REHABILITATION
E13
IRE ° °M "E "
°E -- NOTED
VICINITY /LOCATION MAPS,
DRAW' "° —
_I
CONTRACT ND:
G 1 0 1
APPROVED:
W /M1 -96 AND INDEX TO DRAWINGS
SHEE-No D-
1 16
r
G H