Loading...
HomeMy WebLinkAboutS-229110F 5 4 3 2 ELF/Al1UN U lal, UR 100V UM A�"wuSSreD Uii 192$ COORDINATES & BMINGS ARE akSFJD � sn��EU'D -TH IMF As Built Drawing UtJ1UNtU: M —LT /DJB DRAWN: cHECNEO: Di B Vii, METRO Municipality of Metropolitan Seattb sca E: CEDAR RIVER TRUNK RELOCATION PHASE 3 NOTED CONTRACT NO: PLAN AND PROFILE W/M1 -96 STA 3 +40 TO STA 8 +20 DATE: OCT 95 nLE NO: E13 DRAWING NO: C102 SHEET N0: OF 4 16 See original fle submittal aid signatures, and professi 10296 copies for approval for engineer's al seal RECOMMENDED: 1 DELETED CORR. TEST STA. & REF. TO DIP OPTION DJB —L 0/9 No. REVISION WtNp �' BY APP'D DATE APPROVED: F 5 4 3 2