HomeMy WebLinkAboutS-229110F
5
4
3
2
ELF/Al1UN U lal, UR 100V
UM A�"wuSSreD Uii 192$
COORDINATES & BMINGS ARE
akSFJD � sn��EU'D -TH IMF
As Built
Drawing
UtJ1UNtU:
M —LT /DJB
DRAWN: cHECNEO:
Di B
Vii, METRO Municipality of Metropolitan Seattb
sca E: CEDAR RIVER TRUNK RELOCATION
PHASE 3
NOTED
CONTRACT NO: PLAN AND PROFILE
W/M1 -96 STA 3 +40 TO STA 8 +20
DATE:
OCT 95
nLE NO:
E13
DRAWING NO:
C102
SHEET N0: OF
4 16
See original fle
submittal aid
signatures, and
professi
10296
copies for
approval
for engineer's
al seal
RECOMMENDED:
1
DELETED CORR. TEST STA. & REF. TO DIP OPTION
DJB
—L
0/9
No.
REVISION
WtNp �'
BY
APP'D
DATE
APPROVED:
F
5
4
3
2