HomeMy WebLinkAboutS-229601Maplewood Heights Elementary School
Sanitary Sewer Replacement
GENERAL NOTES
1. PRIOR TO ISSUANCE OF THE CONSTRUCTION PERMIT, THE CONTRACTOR SHALL SUBMIT
COMPLETE CONSTRUCTION PLANS AND DETAILS, PER CITY STANDARDS, FOR REVIEW
AND APPROVAL BY THE CITY OF RENTON.
2. EXISTING SITE IMPROVEMENTS SHOWN ARE BASED UPON CITY OF RENTON RECORDS
AND SURVEY DATA. NO WARRANTY OR GUARANTEE OF ACCURACY OR COMPLETENESS
IS EITHER IMPLIED OR EXPRESSED. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS
HAVE BEEN SHOWN ON THESE DRAWINGS FOR THE PURPOSE OF ASSISTING THE CONTRACTOR
IN LOCATING SAID UTILITIES AND IMPROVEMENTS IN THE FIELD. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR CHECKING ACTUAL LOCATIONS IN THE FIELD AND CHECY'NG WITH
APPROPRIATE AGENCIES THAT MAY HAVE UNDERGROUND UTILITIES AND IMPROVVLMENTS
WITHIN THE PROJECT LIMITS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY
AND ALL DAMAGE TO UNDERGROUND UTILITIES AND IMPROVEMENTS RESULTING FROM HIS
OPERATION.
3. A COPY OF THE APPROVED PLANS AND SPECIFICATIONS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
4. DATUM - ELEVATIONS SHOWN ON CITY OF RENTON DATUM (NATIONAL GEODETIC VERTICAL
DATUM), AND ARE BASED ON CITY OF RENTON BENCHMARKS.
5. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
PERMITS AND OTHER RELATED OR REQUIRED PERMITS PRIOR TO ANY CONSTRUCTION
.k ACTIVITY.
6. ALL PAVEMENT, WALK AND CURB REMOVALS SHALL BE VERTICAL SAWCUT AT THE
BOUNDARIES OF REMOVAL AREA. REMOVALS BEYOND LIMITS SHOWN ARE AT THE
CONTRACTOR'S EXPENSE AND SHALL BE INCLUDED IN THE TOTAL CONTRACT PRICE.
CONTRACTOR SHALL RESTORE OR REPLACE ALL PAVEMENT, WALKS, CURBS, DRIVEWAYS,
WALLS, ROCKERIES, LANDSCAPING INCLUDING LAWN, FENCES, UTILITIES, METERS, VAULTS,
MAILBOXES AND SIGNS, OR RELATED ITEMS DAMAGED BY CONSTRUCTION TO ORIGINAL
OR BETTER CONDITION.
7. THE HOURS OF WORK IN STREET RIGHT -OF -WAY SHALL BE LIMITED TO 7 AM TO 5 PM
ON WEEKDAYS ONLY (UNLESS OTHERWISE APPROVED IN WRITING BY PUBLIC WORKS AT
235- 2635). SEE SPECIAL PROVISIONS FOR LANE CLOSURE REQUIREMENTS. ALL
STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND EMERGENCY 911
SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF WORK.
8. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE CONTRACTOR
A MINIMUM OF THREE (3) PIPE LENGTHS IN ADVANCE OF NEW FORCE MAIN. PROVIDE
ETHAFOAM PAD WHERE CLEARANCE BETWEEN NEW AND EXISTING UTILITY LINES AT
CROSSINGS IS LESS THAN 6 ".
EROSION CONTROL NOTES
1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION
AND EROSION CONTROL FACILITIES 1'O INSURE THAT SEDIMENT LADEN WATER DOES NOT
ENTER THE NATURAL OR PUBLIC DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES
AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES
MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE PROJECT.
THEREFORE, DURING THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND
RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES THAT MAY BE
NEEDED TO PROTECT ADJACENT PROPERTIES.
2. THE IMPLEMENTATION OF THE ESC FACILITIES NECESSARY TO COMPLETE THE WORK ON
THESE PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF
THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION
IS APPROVED.
3. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED
AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
4. ANY AREA NEEDING ESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN FIFTEEN (15) DAYS.
5. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM
OF ONCE A MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT.
6. AT NO TIME SHALL MORE THAN FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR
TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
7. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED
AREAS GREATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED FOR MORE
THAN 12 HOURS SHALL BE COVERED BY ONE OF THE FOLLOWING COVER MEASURES:
MULCH, SODDING OR PLASTIC COVERING.
8. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING
GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE (E.G. ANNUAL OR PERENNIAL RYE
APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE).
9. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE
APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
'G I -
N
SE 128TH ST -
PROJECT- -
SITE
MAPLE MgLLFY
RO
VICINITY MAP
NTS
RO L L'1 4 9 �062
PUMPING STATION PLOT PLAN
SCALE: 1' = 10'
CONSTRUCTION REQUIREMENTS
1. COORDINATE A PRE - CONSTRUCTION MEETING WITH THE CITY OF RENTON
AND KING COUNTY ENGINEERING INSPECTION DEPARTMENTS.
2. FIELD VERIFY ALL UTILITY CROSSINGS AND DIRECTION BORING AREAS.
3. CONDUIT AND WIRE FURNISHED AND INSTALLED BY THE GENERAL
CONTRACTOR.
4. PUMP CONTROLS FURNISHED BY THE FORCEMAIN CONTRACTOR AND
INSTALLED BY THE GENERAL CONTRACTOR.
5. FORCEMAIN TESTING WILL BE BETWEEN CLEANOUTS AND WITH WATER
AT 100 PSI. ALLOWABLE PRESSURE DROP WILL BE PER THE PIPE
MANUFACTURER'S RECOMMENDATIONS.
6. SAWCUT EXISTING ASPHALT AS INDICATED ON THE DRAWING DETAIL j/1,
SHEET 2.
7. TRENCH, INSTALL FORCE MAIN PIPE, BACKFILL AND COMPACT TO
SUBGRADE.
8. REMOVE ALL ASPHALT AND REPLACE AS INDICATED ON DETAIL //1.
SHEET 2.
N
FORGE MAIN
-
SEE SHEET 3/3
SCALE: 1" = 10'
w
�
o a
i
�- LB IM 00.1
6 OUT @E.
- -� - - -- - - --
��'
VALVE VAULT
F. H.
LJ
DNDERGRIXIND ELEL.
-_ -_ -- - - --
- -_ --
---
--
-_ (TYP.) (556 ELF6)
-�
--
DUPLEX
/
-- --- ;', - -7 - -- -
p
I C
_ _ _ _ _
- -- P05T MOUNTED
14LP 0 "55
1�-
_ _
yea WNTROL PANEL
@2° %MIN.
�-
' �I
51 LF 6,65 @ 270
r'
_4
1
L-
IJ
5EE SHEET L2.1 FOR LONTINUATIDN
I I
0 "L.O.
I-'
� �
�-I
IE 390.95
-.
PORTA8LE5 1
i. '
PORTA6LE5 �� BASKETBALL
- - '✓ n HOOP
5EPT16 LID\ I -
i
5EPT16 LID
� SEPT16 LID
I
I
L
r'
TETHER6ALL
POLE5
r
PORTADLE5
,J 45RIMF}. 3978
I
1
Ir
I
- J
N
SE 128TH ST -
PROJECT- -
SITE
MAPLE MgLLFY
RO
VICINITY MAP
NTS
RO L L'1 4 9 �062
PUMPING STATION PLOT PLAN
SCALE: 1' = 10'
CONSTRUCTION REQUIREMENTS
1. COORDINATE A PRE - CONSTRUCTION MEETING WITH THE CITY OF RENTON
AND KING COUNTY ENGINEERING INSPECTION DEPARTMENTS.
2. FIELD VERIFY ALL UTILITY CROSSINGS AND DIRECTION BORING AREAS.
3. CONDUIT AND WIRE FURNISHED AND INSTALLED BY THE GENERAL
CONTRACTOR.
4. PUMP CONTROLS FURNISHED BY THE FORCEMAIN CONTRACTOR AND
INSTALLED BY THE GENERAL CONTRACTOR.
5. FORCEMAIN TESTING WILL BE BETWEEN CLEANOUTS AND WITH WATER
AT 100 PSI. ALLOWABLE PRESSURE DROP WILL BE PER THE PIPE
MANUFACTURER'S RECOMMENDATIONS.
6. SAWCUT EXISTING ASPHALT AS INDICATED ON THE DRAWING DETAIL j/1,
SHEET 2.
7. TRENCH, INSTALL FORCE MAIN PIPE, BACKFILL AND COMPACT TO
SUBGRADE.
8. REMOVE ALL ASPHALT AND REPLACE AS INDICATED ON DETAIL //1.
SHEET 2.
N
10 0 5 10 20
-
SCALE: 1" = 10'
w
�
o a
- p- r - - } -- p7r - --
i
II
I
1
i
✓ice. ���� - �
--- y- -_ - - -� I.. - - - -__
._
Ld__-cL_j
5A. TEST PERIOD TO BE 30 MINUTES, OR AS IN SECTION
3.46 -SEWER WORKS DESIGN OF WASHINGTON STATE
DEPARTMENT OF ECOLOGY, WHICHEVER IS GREATER.
CALL 48 HOURS
BEFORE YOU DIG
1 -800- 424 -5555
0
'Ji3 �yy i;
yOr
- - k
N
a Q)
O b 4'
Q
U
c`3
� a
Z 0 N
c� rxl
W � �
x o
z w
0-, 4
zzN
W
^ W
Wi
W o
PROJECT NO.
PLAN REVIEW DATE 96 -492
T,_.
WASTEWATER UTILITY DATE CnD FIDE: a92SlD
SHEET N0.
TRANSPORTATION DATE
SANITARY SEWER 1
E MAIN INSTALLATION OF
3