HomeMy WebLinkAboutS-231402I °
z
O
Qo
� w
0
w O
� J
m
°
a
W o
a i
z �
w
a/
a w
� J X
U
/ m
0
X
°
X
m
V �
z �
N =
w �
� � w
z O X
m ° °
O � S
� ti c7
Z X
2 =
w
a
yJ O � lei
i
CLEANOUT CONNECT TO
MECH. IE 15.0
FF= 22.0
1OLF 6" SSS 0 2.0%
c �
�s
9
8
C1SA
STORAGE WELL
CONTROL PANEL
FLECTRICAI CO_ ND. n
— VENT TO DEDICATED
MECHANICAL RISER
IN BUILDING
—PUMP STATION.
/-45' BEND (MJxMJ)
CONCRETE BLOCKING
PER CITY OF RENTON
SIANDARD 085
OK (TYP.)
x--45' BEND (MJxMJ)
..... ___...
4" DIP FORCEMAIN
\ /-45' BEND (MJxMJ)
STORAGE WELL & PUMP STATION ELEVATION e
SCALE 1 " =2' Ci6A
WW - xy- 1 .1IT
SEE DRAWING C16
FOR CONTINUATION
6" CRUSHED SURFACING
BASE COURSE (TYP)
PUMP STATION NOTES:
1. DUPLEX PUMPS AND MOTORS AND RAIL ASSEMBLY SHALL BE
UL LISPED EXPLOSION PROOF AND LABELED FOR CLASS 1, DIVISION 1,
GROUP D SERVICE. PUMPS SHALL BE NON -CLOG SUBMERSIBLE TYPE
CAPABLE OF PASSING A 3" SOLID. EACH PUMP SHALL BE CAPABLE OF
80 GPM AT 19 FEET TDH. MOTOR VOLTAGE AND PHASE SHALL BE
COMPATIBLE WITH SERVICE FROM BUILDING. RAIL SYSTEM SHALL ALLOW
PUMP REMOVAL WITHOUT ENTERING PUMP STATION.
2. CONTROL PANEL SHALL BE DESIGNED BY THE MECHANICAL/
ELECTRICAL DESIGN BUILT CONTRACTOR FOR COMPATIBILITY WITH THE
PUMP STATION. THE PANEL SHALL MEET THE FOLLOWING MINIMUM
REQUIREMENTS:
• NEMA 3R ENCLOSURE.
• UL LISTED FOR ENCLOSED INDUSTRIAL CONTROL PANEL.
• HAND /OFF /AUTO SELECTOR SWITCHES, WITH PUMP INDICATING LIGHT.
• PUMP ELAPSED TIME METERS.
• DUPLEX PUMP SEQUENCING WITH ALTERNATOR.
• ALARM SHALL TRIGGER A PANEL MOUNTED ALARM LIGHT AND A
REMOTE RED ALARM LIGHT MOUNTED IN A VISIBLE LOCATION.
• ALARM SHALL BE MOUNTED TO A 24 HOUR TELEMETRY AUTO- DIALER.
• PLUG FOR EMERGENCY POWER GENERATOR
3. ALL MATERIALS OF CONSTRUCTION INSTALLED IN THE STORAGE
WELL AND PUMP STATION SHALL BE EXPLOSION PROOF AND
COMPATIBLE WITH THE HAZARDOUS LOCATION.
4. FINAL DESIGN (INCLUDING MATERIAL SUBMITTAL) SHALL BE SUBMITTED
TO AND REVIEWED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION.
SUBMITTAL SHALL BE BY LICENSED P. E. IN STATE OF WA.
PER CITY REVIEW COMMENTS
PER CITY REVIEW COMMENTS
NO, REVISION
I
44
f 1 1'li 114 U dl )I�i l
9�
7
MANHOLE (84 ")
S - 23/402
RECOMIAENDC.D
FOR APPROVAL
ALL 48 HOURS
RIM 21.0
[B!EFORE YOU DIG
- 800 - 424 -5555
.�.Y�.
HYDRORAIL WITH CHECK
HATCH TO BE
L101 Third AVerM Sulte 900
Q4 py wasfl� OF,
ELECTRICAL CONDUIT
PRECAST VALVE VAULT
& DISCONNECT OR EQUAL
COMPATIBLE WITH
CITY OF RENTON
Po, mFC24711 '� W4
�aSS'41sT
TO CONTROL PANEL
SIZE AS REQUIRED
SANITARY SEWER PUMP STATION
PUMP RAIL SYSTEM
HUNTER DOUGLAS, INC.
i
oesicN�u JBM— DATE, 30MAY97
DRAWN DKR EGR LFN
CNECK�D: JDE SCAI -L. AS NOTED
Pu.e NnraE: HOUT.DWG
JOE
MAV
30MAY97
N" r
AGC
MAV
5/12/97
BY
APPN
OA TL
APPROVI 11 -"
SH :C16A- C18
CHECK VALVE
VENT TO BUILDING
"'
SIZE BY MECHANICAL
%
GATE VALVE
IE 18.0
/
1
8" PVC TO STORAGE
r
/4DUCTILE
WELL
" 4 GALVANIZED
III
IRON FORCEMAIN
STEEL FORCEMAIN
ANCHORED AGAINST
THRUST
MERCURY FLOAT
SWITCHES
'-
IE 14.8
EL 14.2 ALARM
SIDE SEWER FROM BUILDING
7
EL 13.7 PUMP 2 ON
I
EL 12.2 PUMP 1 ON
(2) DUPLEX PUMPS
W /RAIL SYSTEM
-
EL 10.7 PUMP OFF
1
1
1
1
EL 8.7 BOTTOM SLAI1
°
84'
-
PUMP STATION ELEVATION
B
SCALE 1 " =2'
C16A
PUMP STATION NOTES:
1. DUPLEX PUMPS AND MOTORS AND RAIL ASSEMBLY SHALL BE
UL LISPED EXPLOSION PROOF AND LABELED FOR CLASS 1, DIVISION 1,
GROUP D SERVICE. PUMPS SHALL BE NON -CLOG SUBMERSIBLE TYPE
CAPABLE OF PASSING A 3" SOLID. EACH PUMP SHALL BE CAPABLE OF
80 GPM AT 19 FEET TDH. MOTOR VOLTAGE AND PHASE SHALL BE
COMPATIBLE WITH SERVICE FROM BUILDING. RAIL SYSTEM SHALL ALLOW
PUMP REMOVAL WITHOUT ENTERING PUMP STATION.
2. CONTROL PANEL SHALL BE DESIGNED BY THE MECHANICAL/
ELECTRICAL DESIGN BUILT CONTRACTOR FOR COMPATIBILITY WITH THE
PUMP STATION. THE PANEL SHALL MEET THE FOLLOWING MINIMUM
REQUIREMENTS:
• NEMA 3R ENCLOSURE.
• UL LISTED FOR ENCLOSED INDUSTRIAL CONTROL PANEL.
• HAND /OFF /AUTO SELECTOR SWITCHES, WITH PUMP INDICATING LIGHT.
• PUMP ELAPSED TIME METERS.
• DUPLEX PUMP SEQUENCING WITH ALTERNATOR.
• ALARM SHALL TRIGGER A PANEL MOUNTED ALARM LIGHT AND A
REMOTE RED ALARM LIGHT MOUNTED IN A VISIBLE LOCATION.
• ALARM SHALL BE MOUNTED TO A 24 HOUR TELEMETRY AUTO- DIALER.
• PLUG FOR EMERGENCY POWER GENERATOR
3. ALL MATERIALS OF CONSTRUCTION INSTALLED IN THE STORAGE
WELL AND PUMP STATION SHALL BE EXPLOSION PROOF AND
COMPATIBLE WITH THE HAZARDOUS LOCATION.
4. FINAL DESIGN (INCLUDING MATERIAL SUBMITTAL) SHALL BE SUBMITTED
TO AND REVIEWED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION.
SUBMITTAL SHALL BE BY LICENSED P. E. IN STATE OF WA.
PER CITY REVIEW COMMENTS
PER CITY REVIEW COMMENTS
NO, REVISION
I
44
f 1 1'li 114 U dl )I�i l
9�
7
CO , r- .2 Flao a
1I
1
I ti
24X
S - 23/402
RECOMIAENDC.D
FOR APPROVAL
ALL 48 HOURS
[B!EFORE YOU DIG
- 800 - 424 -5555
.�.Y�.
Carwiting Engln"s
A. VF,
L101 Third AVerM Sulte 900
Q4 py wasfl� OF,
;,aVttla Washing ton 98101
2061 622-5622 Fax G?061 622-8130
CITY OF RENTON
Po, mFC24711 '� W4
�aSS'41sT
I,1,A N11 I !�ILNT OF PU131 I< WORI S
SANITARY SEWER PUMP STATION
EXFIItNS „ /.a /bN
HUNTER DOUGLAS, INC.
RENTON WASHING 70N
oesicN�u JBM— DATE, 30MAY97
DRAWN DKR EGR LFN
CNECK�D: JDE SCAI -L. AS NOTED
Pu.e NnraE: HOUT.DWG
JOE
MAV
30MAY97
N" r
AGC
MAV
5/12/97
BY
APPN
OA TL
APPROVI 11 -"
SH :C16A- C18
CO , r- .2 Flao a
1I
1
I ti
24X