Loading...
HomeMy WebLinkAboutS-2314031� 1 IUI I Icni I �i �> of » � N L3 CV 4 )` rn a � o ° 1 z c� at sn rte-- o Q i S_ i m x 0 x n rL x n m CJ � Z x — o � J f Z O= X m'a o CLEANOUT CONNECT TO MECK IE 15.0 R= 220 101F 6' SSS M 2.0%� � A �s 9 8 C16A STORAGE WELL K (N If >�. SANITARY SEWER PUMP STATION - PARTIAL PLAN 1' =10' CONTROL PANEL VENT TO DEDICATED MECHANICAL RISER IN BUILDING PUMP STATION 45' BEND (MJxMJ) CONCRETE BLOCKING PER CITY OF RENTON STORAGE WELL & PUMP STATION ELEVATION I3 SCALE 1'=2' ► I 15: 111� - wwp - sue - X3 /4 PRI i 47 DIP FORCEMAIN `45' BEND (MJxMJ) SEE DRAWING C16 FOR CONTINUATION MANHOLE (84 -) RIM 21.0 HiDRORAIL WITH C -0aK HATCH TO BE ELECTRICAL CONDUIT � PNECAST VALVE VAULT & DISCONNECT C: E(QbA` COMPATIBLE -WITH TO CONTROL PANEL SIZE AS REQUIRED PUMP RAIL SYSTEM CHECK VALVE VENT IOBUIL&IttiO SIZE BY MECHANiCA_ /' GATE VALVE IE 18.0 i I e Pvc To W saRAC I I - - -- iI 4" GALVANIZED STEEL FORCEMAIN 4" DUCTILE IRON FORCEMAIN ANCHORED AGAINST I THRUST MERCURY FLOAT SWITCHES _ ,E J4U EL 14.2 ALARM SIDE SEWER PROM BiILDtNG EL 13.7 PUMP 2 ON EL 12.2 PUMP 1 ON I (2) DUPLEX PUMPS W /RAC. SYSTEM c� ;i EL 10.7 PUMP OFF 1 1 1 1 EL 8.7 BOTTOM SLAB E_ _- 84 PUMP STATION ELEVATION B SCALE 1 " =2' Ci6A C old °o °a 1� PUMP STATION NOTES: I. DUPLEX PUMPS AND MOTORS AND RAIL ASSEMBLY SHALL BE ®�® w UL LISTED EXPLOSION PROOF AND LABELED FOR CLASS 1, DIVISION 1, GROUP D SERVICE_ PUMPS SHALL BE NON—CLOG SUBMERSIBLE TYPE CAPABLE OF PA'_3gNG A 3' SCIJO_ EACH PUMP SHALL BE CAPABLE OF 80 GPM AT 19 FEET TDH_ MOTOR VOLTAGE AND PHASE SHALL BE COMPATIBLE WITH SERVICE FROM BUILDING. RAIL SYSTEM SHALL ALLOW PUMP REMOVAL WITHOUT ENTERING PUMP STATION. 2. CONTROL PANEL SHALL BE DESIGNED BY THE MECHANICAL/ ELECTiBCAL DESIGN BIALT CONTRACTOR FOR COMPATIBILITY WITH THE PUMP STATION. THE PANEL SHALL MEET THE FOLLOWING MINIMUM IREQU1REl1EPiTS: • NEMA 3R ENCLOSURE. • UL LISTED FOR ENCLOSED INDUSTRIAL CONTROL PANEL RECOMMENDED • HAND /0FF /AUT0 SELECTOR SWITCHES, WITH PUMP INDICATING LIGHT. FOR APPROVAL I" • PUMP ELAPSED TIME METERS eve , LALL HOURS DUPLEX PUMP SEQUENCING WITH ALTERNATOR. YOU DIG ALARM SHALL TRIGGER A PANEL MOUNTED ALARM LIGHT AND A BY 4 -5555 REMOTE RED ALARM LIGHT MOUNTED IN A VISIBLE LOCATION. BY-----,— � I . ALARM SHALL BE MOUNTED TO A 24 HOUR TELEMETRY AUTO— DIALER. 6' CRUSHED SURFACING • PLUG FOR EMBG04CY POWER GENERATOR ® — Calsulring Fsglnaevs BASE COURSE (TYP) 3. ALL MATERIALS OF CONSTRUCTION INSTALLED IN THE STORACF _ �y A I ' r01 Tntrd Avefwia Sure 900 WELL A ,1.�pF tidsy�a.GF, :iea[tla Washlrgtm 9811( ID! t'UW STATION MALL BE EXPLOSION PROOF AND � Q� °. -� - COMPATIBLE iATH THE HAZARDOUS LOCATION. �� ° " 2061 622 -5822 Fax (2061 622 -8190 4. FWAL DESIGN (INCLUDING MATERIAL SUBMITTAL) SHALL BE SUBMITTED CITY F REN N 24711 TO AND REVIEWED BY THE CITY OF RENTON PWOR TO CONSTRUCTION. ° °BPS -�rs,et `F' i ,-I " Cl vl NT of r UBLIC_Wo RKS SUBMITTAL SHALL BE BY LICENSED P.E. IN STATE OF WA SANITARY SEWER PUMP STATION - e� 9,1;66 HUNTER DOUGI S, INC. RENTON WASHINGTON A � LIJ AS BUILTS JEL JDE 24DEC97 DESwN= JBM oa e 30MAY97 aE as HJUT.DWG PER CITY REVIEW COM4IENTS JDE MAV 30MAY97 DRAWL. DKR /EGR /LFN - - -- - -- PER QTY REVIEW COL9IENTS AGC MAV 5 12 97 crtEClcEO JUE sca�E: AS NOTED FES ate;: PR B araR. DATE —al 1. � 1--. C16 -A o�: C18, n RIOLL 1:57 "k 24