Loading...
HomeMy WebLinkAboutS-234507wwp 17 -2'T*r l x; a WILLIAMS BERG CONDOMINIUMS II SANITARY SEWER LIFT STATION DESIGN O P 21143 0 ® r W - GENERAL NOTES -'- } _: " 1- F THE CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES WHILE PERFORMING CONSTRUCTION WORK ON THIS PROJECT. - +' - 2. '{.. ALL MATERINS, WORKMANSHIP, AND CONSTRUCTION SHALL CONFORM TO THE CONSIRUCTION DRAWINGS, TECHNICAL SPECIFICATIONS, U.B.C. (1994 EDITION), AND $ -- -- - - - _ - NEMA 4 NO4i1�/�A NE DUPLEX GpNfROt PANEL 3. THE CITY OF RENTON STANDARD PLANS AND SPECIFICATONS. A PRECONSIRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOnCE WILL BE _I - GENE CRETE—PAD 4. REQUIRED PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS PRIOR TO STARTING - -- v 80 PVC VENT I;ING Qj CONSTRUCTION, AND OBTAIN ALL BUILDING DEPARTMENT INSPECTIONS DURING _ HIGH VENT L�C�ITION J INSPECTION REPRESENTATIVE OF THE CITY OF RENTON, THE ONTRACTOR SHALLLY NOTIFY THE REPRESETATIVE 24 HOURS IN ADVANCE OF ANY BACKFIWNG OF CONSTRUCTION. Ir W - i ' I I LOW VENT ILOPATION,\ i' 5. _ _\ THE CONTRACTOR WILL BE RESPONSIBLE FOR THE LIFT STATION OPERATION UNTIL THE PROPOSED STATION IS ON -UNE AND ACCEPTED IN WRITING BY THE CITY OF RENTON. CITY OF RENTON ir { - - F>-PAT. ICAL /fT AS REQ'D. Q THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEWATERING SYSTEM NEEDED TO KEEP THE EXCAVATION SHE DEWATERND. THE DEWATERING SYSTEM WILL BE - {---- -}--r- - I J AC"CO-RrwAG TO THE GUIDELINES QF THE 1994 WSDOT STANDARD SPECIFCATIONS SECTION 1- 09.06. CONTRACTOR SHALL St- R-MP NSOLE FOR PROVIDING METHOD - 5'- 'Y VC ®; 6.0% cj� PIPE TO 150 PSI( .) OF STORMWATER REMOVAL AND CONTROL TO KEEP EXCAVATION PITS DRY. — BE RATED TO 50 P1 (MILTYP F- NAGS LIFT STS 0 ,,.. MANHLV4E� o rw. RIM 370.25± � i 8 PVC tf= I. 5 II ' o -- (— FORCE MAIN RELOCATED I IN FIELD TO THIS LOCATION -Fast -AS' II z O P 21143 0 ® r W -1 ROCKERY ., ___— .�__ _- _._ _\ -,.,\� •.., �y LINCOLN - - -- _ _DRIVE NE o - f Q2eiC8° - COIZPUNG 1 SEE DETAIL SRELT 10-8" SDR 35 PVC 0 27. MIN. / EXIST. SAN. SEWER MANHOLE J 0 10 20 40 78.57 RIM=7g 33 70.22 1 i8 B'PVC N) r — T`- ---{ 70.37 1 &a1 Er PVC S) SCALE 1 " =20' 74.62 TEy&6Q 8"PVC W NEW) - -- ALL JOINTS AND FITTINGS SHALL BE RATED TO 150 PSI (MIN -) TYP. 1 NEW MH SET IN FIELD RIM = 77,60 IE = 70.85 8" E IE = 70.95 8" W i f 1 48' OF 8" C7 0 d co 2 ® z� ®� () Z d 0 3 rr W :36 �W 4 J Z � O 3 Q U O J I bu s sump SCANNED OCT - 81999 �I v'o> Nn m o c o< n n C oz °z 0 O v•1 W VII Fi i(I II z O P 21143 0 ® W -1 THIS ENGINEERING DRAWING IS BASED UPON A SITE PLAN PREPARED BY - `Y'ORAI, Ems_ tM 3..- Z l° E)MIRES: 9 -24 -1998 C0 STOPS, BUILDINGS, PARKING LOT ENTRIES /EXITS, PARKING STALLS, J Ir W ARCHITECT'S FULLY DIMENSIONED SITE PLAN. W CITY OF RENTON ir { - - F>-PAT. TMEN-r OF PUBLIC WORKS AMD CUDING IiNDQ2GKUND C0 NES T'S U111.11Y Ii9RY. 1 y >J s� -41 Z NOTE- J F- EX!SRNG UDUIY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. T SHALL BE THE CONTRACTOR'S I 4- ONSERM TO DETERMINE THE U Z � � Q� ^ EXACT VERTICAL AND HORIZONTAL LOCATION. OF ALL E105RNG UNDER- GROUND. UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO � T � ADDED AS -BUILT INFORMATION _ - -. - -- Z W 0 <° 6 \;29 \99 Ld Z o v E DATE 316/98 U Ld m � � O N W REPRESENTATION IS. MME THAT ALL EXISTING UTILRTES ARE SHOWN J 0 O 0 JM zv�jj � m 3 bl �p A. tiG Y WASg� - - -- -- o J 1 �( O n &-Z5 -500 °464 -MCE � 'c t I bu s sump SCANNED OCT - 81999 �I v'o> Nn m o c o< n n C oz °z 0 O v•1 W VII Fi i(I NOTE' O P 21143 0 ® [L -1 THIS ENGINEERING DRAWING IS BASED UPON A SITE PLAN PREPARED BY - `Y'ORAI, Ems_ tM 3..- `� c o, KUSSMAN ASSOCIATES ARCHITECTS AND IS FOR SANITARY SEWER LIFT STATION DESIGN ONLY. FOR CONSTRUCTION OF SIDEWALKS, EXTRUDED CURBING, CURB E)MIRES: 9 -24 -1998 STOPS, BUILDINGS, PARKING LOT ENTRIES /EXITS, PARKING STALLS, WHEELCHAIR RAMPS, AND OTHER ARCHITECTURAL FEATURES, SEE THE ARCHITECT'S FULLY DIMENSIONED SITE PLAN. CITY OF RENTON { - - F>-PAT. TMEN-r OF PUBLIC WORKS AMD CUDING IiNDQ2GKUND C0 NES T'S U111.11Y Ii9RY. 1 y >J s� -41 Gall NOTE- before �/ ®u EX!SRNG UDUIY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. T SHALL BE THE CONTRACTOR'S I 4- ONSERM TO DETERMINE THE - Q� ^ EXACT VERTICAL AND HORIZONTAL LOCATION. OF ALL E105RNG UNDER- GROUND. UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO 3. ADDED AS -BUILT INFORMATION _ - -. - -- JB - - 6 \;29 \99 OE51G€O >__ - - UP DATE 316/98 ENO. 9.7- 14.4_ . iy REPRESENTATION IS. MME THAT ALL EXISTING UTILRTES ARE SHOWN 2 DELETE J -BOX 8 VALVE VAULT -_ _.__- _.__.. JM zv�jj 6 -8 -98 - - -- -- 1 �( O n &-Z5 -500 °464 -MCE HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITINRES NOT SHOWN OR URUOES NOT SHOWN IN THEIR PROPER LOGTDON. -424 1 REVISED PER CITY OF RENTON REVIEW ST Q 3/25/98 CHECKED sT _ - -_ scnLE UNDERGROUND SERNCE (USA) (I%J CALL BEFORE YOU DIQ 1- 800 -.5555 N0. fEY610N BY APPFi DATE 9f7EET OF 1 2. I bu s sump SCANNED OCT - 81999 �I v'o> Nn m o c o< n n C oz °z 0 O v•1 W VII Fi i(I