Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutS-2722214
N o
N
L
Ln
W 06
Ln
" O F- m
N Ln
ui � Lu Ln Lu 1 +70
W
LU
Q CI- L~L.I c Lu m
Ocr_l V) - MH ,fF20
af W� -
W Q
w _
cn Lu
Z —
co
a m o
d
y o — -- - - -. -_ - - -- - 24 °H20_
- z
0 0 0 —
�< -- b- - - - - -- -- -- _- -- ` i ; { 1130
WN as \
-,E
559.62' N01'20'03 "E P a 3, I?.ii
-- -�-- -- _ O p l
1
Conc. Walk
°LLO NOTE.• WORK ON BURNETT AVE S, BETWEEN
S 3rd ST AND S 4th ST MUST BE
s
COMPLETED PRIOR TO SEPTEMBER 15, 1999. tCKD .�, AS -BUILT CERTIFICATION
I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL
CONNECT EXIS77NG SIDE SEWERS TO NEW MAIN C� c� LOCATIONS OF THE SANITARY SEWERS SHOWN HEREON
NO SIDE SEWER REPLACEMENT REQUIRED /N r ARE THE RESULT OF OF A FIELD SURVEY MADE BY ME
OR UNDER MY DIRECTION-
BURNETT = BURNETT AVE S. a 722121 m�
a ci® �I �1 `Aaz LAO
_ > _ �,�,�,� F.D. RINGEL L.S. 23613 DATE:
u 66 +00 65 +00 64 +00 63 +00 62 +00 61+00
a
-------------------
- - -------- - - - 61 +61, 10.2RT --- -- ............
66 +22, 12.4RT - - - - -
-MH f2O STA '6E+78,- �9:J1BT c - MK 19 STA 64 -F26, 10.35 RT -_ - - - - - AD: 18 STA Sf�- 9:9y -R.L
REMOVE EXISTING MH AND o : : : : REMOVE EXIS77NG MH AND R/M FLEWS MH38.35 - - - - - -
¢ - REPLACE WITH NEW 54" MH REPLACE VATH NEW 54" MH - - - - - - -
0 o w RIM EL = 38,.5t 38.68 : ° : : : : : : RlAf EL = 38.34 38.51 - - - : - - - IE 8" (N) = 3298 33.15 - - -
° IE 8" (S) = 3289. 33.00 -
E 8" {N). _ .39.'48 34:73 ............. IE 8" iN) - 34.12 33.95
.- ......o ......... ... o /E 8° S = .34-62 33-8 5------------------------- ---'-----'--- -.........---..... .........................----. .......- .... ---.. _................. .....- ......
y IE 8" (5) _ -34.63 �) ° -
o EXSTING SURFACE ELEVATION 40.. .. .. - - - - - -- - -- - - - -- - - - - - --
.. .......... .........: a °
_
0
...... G.
- - - - - - - - - - - - - - 0
- - -
35 REMOVE EXISTING SEWER - - - - - - - _ - - _ w
- -- - - - -- -- - -- - -- -- ..... - ......... .....5
__
Z - - -- °
l%JQLFB° PVC ®�42 -- - -
REMOVE E %IS71NG SEWER 0
0.35%
3 O I EX.SSS 35.1± TA 66 +45.73.10.8 t2T - �7 R M ELM= 38 60 4 +25.66, 10.35 :RT - - - - 266 - '26% - - : .W LF OF 8" CURED -IN -PLACE LINER
LF B" PVC ®0.49
.......RIM = - ...... .. - ...... _ ...... .. __ _ _ _ 0
HORIZ {'IP£ EL 38. 8 .........:................ ........ ............................... ..........----------- . _ .. --- - - - -- --- ----------- --- - .- ......:..............- - - - -:- :.........:... B ND SEE D TA--- -T ....:.---.... .....3
-IE 5 =- 34.3 - - - -
SCALE - - IE N = 34.3 - - - - - - - - SSAMHOSTA 61+12, 19.85ERT - (�n
RIM EL = 38.04
Horiz. 1" _ .20' ° - "
Jo
Vert. 1" = :5' E (N & s) = 32s
a a
SHEET 12
wwp.� .a�at \—T27 \\ - 2
SCANNED JUL 2 7 2001
ROLL 173 098
T
I N
\ G
I I
im
I
I #340 BURNETT AVE S\ \\
I ABANDON
3P
Ln
0
114f°
®
I
N
1 +17
.29
1 +09
0 +47 Q 2 +41
-
2 +28 1 +94 1 +31 1 +26
0 +85.5 °
a
4 "H20
® Conc Walk
' "-
- .—
_ — —
MH #19
x
o
j
URNETT AVE
°
NOi'27'04 "E oo
560.32' - —'-}'" -
-------- I--
1 +02
_.___- -
q - — - —
MH X18
-
8" PVC
L_-0
y o — -- - - -. -_ - - -- - 24 °H20_
- z
0 0 0 —
�< -- b- - - - - -- -- -- _- -- ` i ; { 1130
WN as \
-,E
559.62' N01'20'03 "E P a 3, I?.ii
-- -�-- -- _ O p l
1
Conc. Walk
°LLO NOTE.• WORK ON BURNETT AVE S, BETWEEN
S 3rd ST AND S 4th ST MUST BE
s
COMPLETED PRIOR TO SEPTEMBER 15, 1999. tCKD .�, AS -BUILT CERTIFICATION
I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL
CONNECT EXIS77NG SIDE SEWERS TO NEW MAIN C� c� LOCATIONS OF THE SANITARY SEWERS SHOWN HEREON
NO SIDE SEWER REPLACEMENT REQUIRED /N r ARE THE RESULT OF OF A FIELD SURVEY MADE BY ME
OR UNDER MY DIRECTION-
BURNETT = BURNETT AVE S. a 722121 m�
a ci® �I �1 `Aaz LAO
_ > _ �,�,�,� F.D. RINGEL L.S. 23613 DATE:
u 66 +00 65 +00 64 +00 63 +00 62 +00 61+00
a
-------------------
- - -------- - - - 61 +61, 10.2RT --- -- ............
66 +22, 12.4RT - - - - -
-MH f2O STA '6E+78,- �9:J1BT c - MK 19 STA 64 -F26, 10.35 RT -_ - - - - - AD: 18 STA Sf�- 9:9y -R.L
REMOVE EXISTING MH AND o : : : : REMOVE EXIS77NG MH AND R/M FLEWS MH38.35 - - - - - -
¢ - REPLACE WITH NEW 54" MH REPLACE VATH NEW 54" MH - - - - - - -
0 o w RIM EL = 38,.5t 38.68 : ° : : : : : : RlAf EL = 38.34 38.51 - - - : - - - IE 8" (N) = 3298 33.15 - - -
° IE 8" (S) = 3289. 33.00 -
E 8" {N). _ .39.'48 34:73 ............. IE 8" iN) - 34.12 33.95
.- ......o ......... ... o /E 8° S = .34-62 33-8 5------------------------- ---'-----'--- -.........---..... .........................----. .......- .... ---.. _................. .....- ......
y IE 8" (5) _ -34.63 �) ° -
o EXSTING SURFACE ELEVATION 40.. .. .. - - - - - -- - -- - - - -- - - - - - --
.. .......... .........: a °
_
0
...... G.
- - - - - - - - - - - - - - 0
- - -
35 REMOVE EXISTING SEWER - - - - - - - _ - - _ w
- -- - - - -- -- - -- - -- -- ..... - ......... .....5
__
Z - - -- °
l%JQLFB° PVC ®�42 -- - -
REMOVE E %IS71NG SEWER 0
0.35%
3 O I EX.SSS 35.1± TA 66 +45.73.10.8 t2T - �7 R M ELM= 38 60 4 +25.66, 10.35 :RT - - - - 266 - '26% - - : .W LF OF 8" CURED -IN -PLACE LINER
LF B" PVC ®0.49
.......RIM = - ...... .. - ...... _ ...... .. __ _ _ _ 0
HORIZ {'IP£ EL 38. 8 .........:................ ........ ............................... ..........----------- . _ .. --- - - - -- --- ----------- --- - .- ......:..............- - - - -:- :.........:... B ND SEE D TA--- -T ....:.---.... .....3
-IE 5 =- 34.3 - - - -
SCALE - - IE N = 34.3 - - - - - - - - SSAMHOSTA 61+12, 19.85ERT - (�n
RIM EL = 38.04
Horiz. 1" _ .20' ° - "
Jo
Vert. 1" = :5' E (N & s) = 32s
a a
SHEET 12
wwp.� .a�at \—T27 \\ - 2
SCANNED JUL 2 7 2001
ROLL 173 098