HomeMy WebLinkAboutS-27230EC', U
Im
Y =
w W
W. _J
[if IY
W 2
U
Q W ry
J
a 0 W
y U)
i
LL- Z s:=_
00 34
F- a
a � a
U \c
�o
v�
E
-,E
o>. i I `c
o v
FL
f
O
x
z
Ln
Of0
Of
A PORTION OF SW 1/4 OF THE SE 1/4 OF SECTION 31, T 23 N, R 5 E, WM.
2
W
NORTH n n NORTH SEWER LINE B
p END PAVING
z SCALE- H- F- 20 120
V
- - - - PROPOSED GROUND (TYP.)
- -- - --
115 115
8" WATER , EXISTING.GROUND (TYR) Ld
f10 -- IE= nr97 - - 110
12" STORM - o IE - 1D8.80- - W
198 LF A& ------ - - - - -- - 92 STORM N
182 LF A.B. 8° -
44LF 8' 98 LF ° 0.0022 A.B.i9 -EF 8" PVC ®ff9B4 0.0059 A.B. -
iest�8_PVa._oaeg - -- _. _ - -- - -- - -- -- -- - - -- -- - - -- - -- - \ PVC _ - STA 4 +s1 2105
®0.004 A.B.
i0$ PVC-A.B.- -
STA 2 +85 106:01 A.B.
- - 105.57 A.B. IE 6" 106.06 RIM H #3 48-0 U
S= 0.0050 A.B
' 105.15 A.B. IE 6" 46§3 SSMH i�2 - 48 0 BLDG 17 1 }r:69� 112.52 A.B. �
104.50 A.B; STA 1 +06 6 "'� BLDG 18 RIM =+-3.��114.29 A.B. IE 8" IN (S,E) =#66- 44106.76 A.B. Q
IE 6` }A33�! SSMH; ipi - 441-0 BLDG 21 LIE A.S.
IE 8' IN (S)= 4B53fr 105.87 A.B. 8.75'W x 2.5'H ARCH PIPE IE 8" OUT '(N)- -19634 106.66 A.B.
+ IE =- 102:66 100 100 BLDG 22 _ RIM -115.34 A.B. - -- -- - 1E..8' 'OlJ1`tNJM�r}G 105.77 -fiB:
IE 8 "IN(E,S)= 464-74 104 59 A.B. 105.18 A.B. BLDG 20
104.51 iA.B. IE 8 "OUT(N) -49" "' IE 6 'fe5.e4
IE 6" 46464- BLDG 19:
BLDG 23
95 LSSM14A.B. - - - _ 95
-
RIM =11794 A.B.
INV. (8'1N.)= PO4.37 A.B.
INV. 8 °OUT)= 104.27 A.B.
NORTH EPS�
i
EXISTING GROUND (TYP.) ,
W
m AB
0.0500
W ---- - - - - -- - 135 LF 8' PVC ® r IE 611300 A.B.
- -- - '
W CO - - i - _ -!, - - - IEM'109.75 _ - -.. -- -_BLDG 7 --
Uj - - - 12 "' STORM a4 LF 8` PVC, ®� 664- 0.0044 A.B.
Z 157 LF 8" PVC 0 B.664 0.0052 A.B. 114.25' A.B.
J IE 6"+13.4+-
3: IE !6" r^i� ._. IE 6" BLDG 8
105 U IE -6 "_ _1.06.64 NOT FOUND' A.B.) BLDG 107.90 A.B. BLDG 19&95 109.35 A.B. SSM #6 - -48 °0 - 10Jr
LDG 14
ExFiRES: MAY 6, 2001
W
J
IL
it
W
09
3
W
0:
N
Q
N
Wr
It W }
U �a3
Ir
W-
U W
V
97 -18
Q
108.02 A.B RIM :IN (g 1214 6 A.B. UMG
IE 6" IN T (W) 114. 115.00 A.B.
IE 6' 19�� 10.700 A.B. NOT FOUND A.B. BLDG 12
& IE 8' OUT (W)= 114.57'114.90 A.B. DRAWN BY
BL
V0 03 -03 -98
� BLDG 15 BLDG 13 ISSUE DATE
SSMH #4 - 48 "0 TYPE "B' SSMH 48 °0 TYPE B"
BED" 106.62- 105.99 A.B. STA 7+23 >e
B G 11 STA 6 +39 RIM = X113.59 A.B. SEWER LINE B AS -BUILT 02 -15 -00
RIM 1+244 112.92 A.B. SHEET REVISION
IE 8" IN (S)�.W 10767 A.S. IE_8 "_IN T (N)={�% 10108. A.B. - _ - - -__ -_ -
IE 8" OUT (N) =46� 51 108.04 A;B.
IE 8" OUT (N)= #AABB• 10757 A.B. CW%i4LBHT On' As built information provided by.
VV w10 -a7- -Z 7-7 3
RMONS: A) C OF R MON BUILDING DMSION. B) P LOWERED FINISHED GRADES. 3/26/98 REVISIONS: A) AS-MILTS 2/4/00 DCW
LO
m
I
U<
O
I,
rn
I
M
a
0
0
z
O
0-
00
00
rn
3
QJ
in
(n
O
O
10
W
in
in
N
CL
w
U-1
0
0
z
a
0
V f- 5' ESM Cons South ultin En ineers
z4Bth Street
Federol Way, WA. 98003
(206) 623 -5911
- - - - - -
Centre Pointe Surveying
33639 9th Ave. South
Federal Way, WA. 98003
661 -1901
(25
(253)
o PACIF=IC E NIGINEERINO DESIGN i vC. o CIVIL ENOINEFRINO AND
PLANNNINO CONSULTANTS
/Ei(3 ; _ 2/ `'' e�
<CANNED MAR 3 0 2000
BALL 166 3 4 6