GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CITY OF RENTON ENGINEERING STANDARDS
AND THE PROJECT DOCUMENTS. CITY OF RENTON STANDARD PLAN DETAILS ARE
LOCATED WITHIN THE BOUND CONTRACT SPECIFICATIONS.
2, VERTICAL AND HORIZONTAL CONTROL IS CITY OF RENTON AS INDICATED ON THE PLANS.
1 UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ACTUAL LOCATIONS MAY VARY.
THE CONTRACTOR SHALL CALL THE "ONE CALL" CENTER AT 1- 800 - 424 -5555 FOR
UTILITY MARKING 48 HOURS IN ADVANCE OF ANY EXCAVATION.
4. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE
CONTRACTOR IN ADVANCE OF CONSTRUCTION.
5. FILTER FABRIC FENCE MUST BE CONSTRUCTED PER THE CITY OF RENTON STANDARD
PLAN B066.
6. INSTALL ORANGE BARRIER FENCE AROUND ALL TREES TO BE SAVED OR PROTECTED
WITHIN AND ADJACENT TO THE WORK AREA. REMOVE ALL BARRIER FENCING UPON
COMPLETION.
7. THE HOURS OF WORK SHALL BE LIMITED TO 8:00 AM TO 5:00 PM ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS
ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPT.
OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPT,
AND 911 SHALL BE NOTIFIED BY THE CONTRACTOR 24 HOURS IN ADVANCE.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
9. A COPY OF APPROVED PLANS AND SPECIFICATIONS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
10. ASSIGNMENT OF CONTRACTOR'S RESPONSIBILITIES AND OBLIGATION FOR LOCATING,
PROTECTING AND REPAIRING DAMAGE TO EXISTING UNDERGROUND UTILITIES IS
SHOWN IN THE SPECIAL PROVISIONS PORTION OF THE CONTRACT SPECIFICATIONS.
11. ALL WORK IS SHOWN SCHEMATICALLY (I.E. ENOUGH DETAIL ON DRAWINGS TO SHOW
INTENT). ALL ITEMS WILL BE FIELD FIT BY THE CONTRACTOR TO MATCH INTO
EXISTING CONDITIONS.
12. THE CONTRACTOR SHALL PLACE ANY WASTE MATERIALS INCLUDING LOGS OR
ROOTWADS AS DIRECTED BY THE ENGINEER.
13. ALL FINISH GRADE ELEVATIONS SHALL BE REVIEWED AND APPROVED BY THE
ENGINEER.
14. THE CONTRACTOR SHALL PROVIDE SMOOTH ROAD TRANSITIONS TO AND FROM ALL
AREAS DESIGNATED TO BE RECONSTRUCTED OR RAISED.
15. CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND
DEBRIS FROM PAVEMENT AREAS. FLUSHING OF STREETS SHALL NOT BE
PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY.
16. CONTRACTOR TO PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORK EXCEPT
FOR NEW PLANTINGS WHICH REQUIRE A TWO (2) YEAR WARRANTY. CONTRACTOR
TO COME BACK AFTER ONE YEAR AND REPLACE ALL ORIGINAL PLANTINGS THAT
DID NOT TAKE.
17. "THUNDER HILLS" STREAM IS ALSO KNOWN AS "ROLLING HILLS" STREAM.
"A",* - s%° ?71"
GENERAL WORK APPROACH
TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESL)
1. TEMPORARY EROSION AND SEDIMENTATION FACILITIES WILL BE CONTRUCTED AND
IMPLEMENTED PRIOR TO ANY EXCAVATION. THESE FACILITIES MUST BE SATISFACTORILY
MAINTAINED UNTIL THE CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ON -SITE EROSION HAS PASSED.
2. TEMPORARY SEDIMENTATION COLLECTION FACILITIES MUST BE PROVIDED AND
MAINTAINED TO ENSURE THAT SEDIMENTATION OR OTHER HAZARDOUS MATERIALS
DO NOT ENTER THE WATERS OF THE ADJACENT STREAM. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED SEASONAL CONDITIONALS DICTATE, MORE EROSION
CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROJECT. DURING THE COURSE OF CONSTRUCTION, IT SHALL
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND
TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS,
AS MAY BE NEEDED TO ENSURE COMPLIANCE.
ROAD REPAIR AND RESTORATION AREAS
1. INSTALL EROSION /SEDIMENTATION CONTROLS
2. CLEAR AND GRUB AREAS REQUIRING EXCAVATION. STOCKPILE ANY MATERIALS
DESIGNATED BY THE ENGINEER TO BE USED IN STREAM STABILIZATION WORK.
3. CONSTRUCT ROAD REPAIRS.
4. FINISH GRADE AND CLEANUP ALL CONSTRUCTED AREAS.
5. INSTALL PLANTINGS AND HYDROSEED ALL DISTURBED AREAS.
6. REMOVE SEDMENTATION CONTROLS.
STREAM RESTORATION AREAS
1. INSTALL AND MAINTAIN STREAM DIVERSION AROUND THE WORK AREA BY USING
SANDBAG DIKES WITH PUMPING, CULVERTS OR OTHER ACCEPTABLE MEANS
APPROVED BY THE ENGINEER. PUMPS AND DIVERSION PIPING TO BE SIZED TO
HANDLE NORMAL ANTICIPATED FLOWS.
2. CONSTRUCT STREAM ENHANCEMENTS AND NEW FACILITIES, MAINTAINING THE
SEPARATION OF THE WORK FROM THE STREAM FLOW.
3. REMOVE THE STREAM DIVERSIONS, AS APPROVED BY THE ENGINEER.
4. PLANT MATERIAL FOR LIVESTAKING WILL BE COLLECTED FROM THOSE AREAS
APPROVED BY THE ENGINEER.
5. INSTALL PLANTINGS AND JUTE MATTING AS SHOWN ON THE PLANS AND
AT DISTURBED AREAS
6. REMOVE SEDMENTATION CONTROLS.
1 :1 Miff f?rA
ak b
S-276603
SCNNNtu SEP 13 2UU1
s •
W.
t7pF WA 0
JtiF. 'yam
c
r ,1
0
18]00
/ F GIS�µF.p \�F.
SS /ONAL ENG
III E%PIRES 11/8/2002
I m
N
I � I, I M`1
N M
N
I
~
d
Z
� O
�Q N
O'j,
U z
h
o
w
W t___
^ S
2
1--� a
t
. �
I
Of 0
of
U)
O+ W
J
Z
a <
I
w
N z
Q
U) w
-JQ CD�
—0
�
m
�
a
a
�
C)
i
s
s
s
no
oN
O O EE
3Q
W 3a
H G_
c v
sE
_E
om
z >
3 Ywa
o
a �
GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CITY OF RENTON ENGINEERING STANDARDS
AND THE PROJECT DOCUMENTS. CITY OF RENTON STANDARD PLAN DETAILS ARE
LOCATED WITHIN THE BOUND CONTRACT SPECIFICATIONS.
2, VERTICAL AND HORIZONTAL CONTROL IS CITY OF RENTON AS INDICATED ON THE PLANS.
1 UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ACTUAL LOCATIONS MAY VARY.
THE CONTRACTOR SHALL CALL THE "ONE CALL" CENTER AT 1- 800 - 424 -5555 FOR
UTILITY MARKING 48 HOURS IN ADVANCE OF ANY EXCAVATION.
4. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE
CONTRACTOR IN ADVANCE OF CONSTRUCTION.
5. FILTER FABRIC FENCE MUST BE CONSTRUCTED PER THE CITY OF RENTON STANDARD
PLAN B066.
6. INSTALL ORANGE BARRIER FENCE AROUND ALL TREES TO BE SAVED OR PROTECTED
WITHIN AND ADJACENT TO THE WORK AREA. REMOVE ALL BARRIER FENCING UPON
COMPLETION.
7. THE HOURS OF WORK SHALL BE LIMITED TO 8:00 AM TO 5:00 PM ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS
ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPT.
OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPT,
AND 911 SHALL BE NOTIFIED BY THE CONTRACTOR 24 HOURS IN ADVANCE.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
9. A COPY OF APPROVED PLANS AND SPECIFICATIONS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
10. ASSIGNMENT OF CONTRACTOR'S RESPONSIBILITIES AND OBLIGATION FOR LOCATING,
PROTECTING AND REPAIRING DAMAGE TO EXISTING UNDERGROUND UTILITIES IS
SHOWN IN THE SPECIAL PROVISIONS PORTION OF THE CONTRACT SPECIFICATIONS.
11. ALL WORK IS SHOWN SCHEMATICALLY (I.E. ENOUGH DETAIL ON DRAWINGS TO SHOW
INTENT). ALL ITEMS WILL BE FIELD FIT BY THE CONTRACTOR TO MATCH INTO
EXISTING CONDITIONS.
12. THE CONTRACTOR SHALL PLACE ANY WASTE MATERIALS INCLUDING LOGS OR
ROOTWADS AS DIRECTED BY THE ENGINEER.
13. ALL FINISH GRADE ELEVATIONS SHALL BE REVIEWED AND APPROVED BY THE
ENGINEER.
14. THE CONTRACTOR SHALL PROVIDE SMOOTH ROAD TRANSITIONS TO AND FROM ALL
AREAS DESIGNATED TO BE RECONSTRUCTED OR RAISED.
15. CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND
DEBRIS FROM PAVEMENT AREAS. FLUSHING OF STREETS SHALL NOT BE
PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY.
16. CONTRACTOR TO PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORK EXCEPT
FOR NEW PLANTINGS WHICH REQUIRE A TWO (2) YEAR WARRANTY. CONTRACTOR
TO COME BACK AFTER ONE YEAR AND REPLACE ALL ORIGINAL PLANTINGS THAT
DID NOT TAKE.
17. "THUNDER HILLS" STREAM IS ALSO KNOWN AS "ROLLING HILLS" STREAM.
"A",* - s%° ?71"
GENERAL WORK APPROACH
TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESL)
1. TEMPORARY EROSION AND SEDIMENTATION FACILITIES WILL BE CONTRUCTED AND
IMPLEMENTED PRIOR TO ANY EXCAVATION. THESE FACILITIES MUST BE SATISFACTORILY
MAINTAINED UNTIL THE CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ON -SITE EROSION HAS PASSED.
2. TEMPORARY SEDIMENTATION COLLECTION FACILITIES MUST BE PROVIDED AND
MAINTAINED TO ENSURE THAT SEDIMENTATION OR OTHER HAZARDOUS MATERIALS
DO NOT ENTER THE WATERS OF THE ADJACENT STREAM. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED SEASONAL CONDITIONALS DICTATE, MORE EROSION
CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROJECT. DURING THE COURSE OF CONSTRUCTION, IT SHALL
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND
TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS,
AS MAY BE NEEDED TO ENSURE COMPLIANCE.
ROAD REPAIR AND RESTORATION AREAS
1. INSTALL EROSION /SEDIMENTATION CONTROLS
2. CLEAR AND GRUB AREAS REQUIRING EXCAVATION. STOCKPILE ANY MATERIALS
DESIGNATED BY THE ENGINEER TO BE USED IN STREAM STABILIZATION WORK.
3. CONSTRUCT ROAD REPAIRS.
4. FINISH GRADE AND CLEANUP ALL CONSTRUCTED AREAS.
5. INSTALL PLANTINGS AND HYDROSEED ALL DISTURBED AREAS.
6. REMOVE SEDMENTATION CONTROLS.
STREAM RESTORATION AREAS
1. INSTALL AND MAINTAIN STREAM DIVERSION AROUND THE WORK AREA BY USING
SANDBAG DIKES WITH PUMPING, CULVERTS OR OTHER ACCEPTABLE MEANS
APPROVED BY THE ENGINEER. PUMPS AND DIVERSION PIPING TO BE SIZED TO
HANDLE NORMAL ANTICIPATED FLOWS.
2. CONSTRUCT STREAM ENHANCEMENTS AND NEW FACILITIES, MAINTAINING THE
SEPARATION OF THE WORK FROM THE STREAM FLOW.
3. REMOVE THE STREAM DIVERSIONS, AS APPROVED BY THE ENGINEER.
4. PLANT MATERIAL FOR LIVESTAKING WILL BE COLLECTED FROM THOSE AREAS
APPROVED BY THE ENGINEER.
5. INSTALL PLANTINGS AND JUTE MATTING AS SHOWN ON THE PLANS AND
AT DISTURBED AREAS
6. REMOVE SEDMENTATION CONTROLS.