Loading...
HomeMy WebLinkAboutS-2785033 v r� m O 6 a 00 l N \� z l ° w N zo ° O t U W o ,r ,r y NS V� SEC. 31, TWP. 23 N., RGE. 5 E., W.M. SEE SHEET C20 FOR CONTINUA TION n, yy I3 h N 885653" g 98 x _..._ n q w i r' LU G% °r ii;°� Or J) 1 ° =400' Of CONTOUR INTERVAL: I % ----------------------- I I i / I I I j a`o yo r o.. O 3¢ H z �! J E t{ 1 L =' E E ? C F4 �. d � Planning a o Y Engineering Bellevue, Washington 98007 Surveying (425) 885 -7877 (425) 885 -7963 Fax OF 45TH PL. S. AND TALBOT ROAD CITY OF RENTON STATION NO. 1227 ELEV. 154.78 0 !E m J w i SEE SHEET C20 FOR CONTINUA TION n, yy I3 h N 885653" g 98 x _..._ i ". to i r' G% °r ii;°� 1 ° =400' Y CONTOUR INTERVAL: s.E�•��� / % ----------------------- N 885653° W 0.01 ; 27 / VERTICAL DATUM: I' s -z1.gq CITY OF RENTON VERTICAL DATUM (NGVD 1929) BENCHMARK: Planning 4205 148th Ave. N.E. Suite 200 TOP OF MONUMENT IN CASE, INTERSECTION Engineering Bellevue, Washington 98007 Surveying (425) 885 -7877 (425) 885 -7963 Fax OF 45TH PL. S. AND TALBOT ROAD CITY OF RENTON STATION NO. 1227 ELEV. 154.78 DEl Job No. 94172 i Q C21 i v 1210 0 = 8885238°W 52 0.02' ti"=131.8 r IL / / 7.5' CENZERt./NE I� J MEnANDy t W 6 I I /; �� I ry /$ I SEE SHEET C19 FOR CONTINUA TION h m W 3 z W Ln U W Q y APPROVED APPROVED SCALE: 1 " = 40' S 0 20 ao eo BYQyI.DATE 4 a L BY�DATE6 rq9 z ROLL #160 � # � 3'8 � 24 'r,'44 KEY MAID G% °r ii;°� 1 ° =400' CONTOUR INTERVAL: s.E�•��� / TWO FOOT CONTOUR INTERVAL ® cam 4 -7 VERTICAL DATUM: DowsENGI s,IHC: s -z1.gq CITY OF RENTON VERTICAL DATUM (NGVD 1929) BENCHMARK: Planning 4205 148th Ave. N.E. Suite 200 TOP OF MONUMENT IN CASE, INTERSECTION Engineering Bellevue, Washington 98007 Surveying (425) 885 -7877 (425) 885 -7963 Fax OF 45TH PL. S. AND TALBOT ROAD CITY OF RENTON STATION NO. 1227 ELEV. 154.78 DEl Job No. 94172 nQ' 2�fira.? SCANNED;7CT - 81999 C21 ROLL #160 � # � 3'8 � 24