HomeMy WebLinkAboutS-2785033
v
r� m
O
6
a
00
l
N
\� z
l ° w
N zo
° O
t U W
o
,r
,r
y
NS
V�
SEC. 31, TWP. 23 N., RGE. 5 E., W.M.
SEE SHEET C20 FOR CONTINUA TION
n,
yy
I3
h
N 885653" g 98
x _..._
n
q w
i
r'
LU
G%
°r ii;°�
Or J)
1 ° =400'
Of
CONTOUR INTERVAL:
I
%
-----------------------
I
I
i /
I
I
I j
a`o
yo
r o..
O
3¢
H
z
�!
J
E
t{ 1 L
='
E
E
?
C F4
�.
d �
Planning
a
o
Y
Engineering Bellevue, Washington 98007
Surveying (425) 885 -7877 (425) 885 -7963 Fax
OF 45TH PL. S. AND TALBOT ROAD
CITY OF RENTON STATION NO. 1227
ELEV. 154.78
0
!E
m
J w
i
SEE SHEET C20 FOR CONTINUA TION
n,
yy
I3
h
N 885653" g 98
x _..._
i ".
to
i
r'
G%
°r ii;°�
1 ° =400'
Y
CONTOUR INTERVAL:
s.E�•���
/
%
-----------------------
N 885653° W 0.01 ;
27
/
VERTICAL DATUM:
I'
s -z1.gq
CITY OF RENTON VERTICAL DATUM (NGVD 1929)
BENCHMARK:
Planning
4205 148th Ave. N.E. Suite 200
TOP OF MONUMENT IN CASE, INTERSECTION
Engineering Bellevue, Washington 98007
Surveying (425) 885 -7877 (425) 885 -7963 Fax
OF 45TH PL. S. AND TALBOT ROAD
CITY OF RENTON STATION NO. 1227
ELEV. 154.78
DEl Job No. 94172
i
Q
C21
i
v
1210
0
=
8885238°W
52
0.02'
ti"=131.8
r
IL
/
/
7.5'
CENZERt./NE
I�
J
MEnANDy
t
W
6 I
I
/; ��
I ry
/$
I
SEE SHEET C19 FOR CONTINUA TION
h m
W
3 z
W Ln
U
W
Q
y APPROVED APPROVED SCALE: 1 " = 40'
S
0 20 ao eo
BYQyI.DATE 4 a L BY�DATE6 rq9
z
ROLL #160 � # � 3'8 � 24
'r,'44
KEY MAID
G%
°r ii;°�
1 ° =400'
CONTOUR INTERVAL:
s.E�•���
/
TWO FOOT CONTOUR INTERVAL
®
cam 4 -7
VERTICAL DATUM:
DowsENGI s,IHC:
s -z1.gq
CITY OF RENTON VERTICAL DATUM (NGVD 1929)
BENCHMARK:
Planning
4205 148th Ave. N.E. Suite 200
TOP OF MONUMENT IN CASE, INTERSECTION
Engineering Bellevue, Washington 98007
Surveying (425) 885 -7877 (425) 885 -7963 Fax
OF 45TH PL. S. AND TALBOT ROAD
CITY OF RENTON STATION NO. 1227
ELEV. 154.78
DEl Job No. 94172
nQ' 2�fira.?
SCANNED;7CT - 81999
C21
ROLL #160 � # � 3'8 � 24