HomeMy WebLinkAboutS-278507Or O 0
I
m
LLJ
U)
i 11
Z
0
V)
�i
of
wwj*.
® %
21 "
SEE SHEET C21 FOR CONTINUA 77ON
SEC. 31, TWP. 23 N., RGE.
5 E., W.M.
C) o
E-<
NK
E-
L)
CAO' �E
<
Z 33
LZ-
71.2
r
01=71 2
Q-1
Lj
DOWSE.-, . MIN.
APPROVED
z Z��
Planning 4205148th Ave. N.E. Suite 200
Engineering Bellevue, Washihgtor 980-7
0
1
Su—eying (425) 885-7877 (425) 885-7963 Fax
Z
0
V)
�i
of
wwj*.
® %
21 "
SEE SHEET C21 FOR CONTINUA 77ON
SEC. 31, TWP. 23 N., RGE.
5 E., W.M.
N07E &L XPREVA206
7-7 DPA46,
ARE fffW 024W
a.FANOW 2W
SrA oi-24 Or
6
_ ., Sri
KEY MAP
Ko
I L
SCALE: 1" = 40'
71 0 21) 40 so
CONTOUR 1NTERVAL:
TWO FOOT CONTOUR INTERVAL
VERTICAL DATUM:
ER
CITY OF RENTON VERTICAL DATUM (NGVD 1929)
BENCHMARK:
TOP OF MONUMENT IN CASE. INTERSECTION
OF 45TH PL S- AND TALBOT ROAD
-21
CITY OF RENTON STATION NO. 1227
ELEV. 154-38
3t is
U, 11
5
T t
WN
176 07:9
r
ASBUILT
DOWSE.-, . MIN.
APPROVED
z Z��
Planning 4205148th Ave. N.E. Suite 200
Engineering Bellevue, Washihgtor 980-7
j��MTE ALLJ9
Su—eying (425) 885-7877 (425) 885-7963 Fax
L— - __
DEI Job No. 94172
[Tm
I
I
I
C19
SCWWDI 30,F -SCANNED SEP 13 202
176 07:9