Loading...
HomeMy WebLinkAboutS-278507Or O 0 I m LLJ U) i 11 Z 0 V) �i of wwj*. ® % 21 " SEE SHEET C21 FOR CONTINUA 77ON SEC. 31, TWP. 23 N., RGE. 5 E., W.M. C) o E-< NK E- L) CAO' �E < Z 33 LZ- 71.2 r 01=71 2 Q-1 Lj DOWSE.-, . MIN. APPROVED z Z�� Planning 4205148th Ave. N.E. Suite 200 Engineering Bellevue, Washihgtor 980-7 0 1 Su—eying (425) 885-7877 (425) 885-7963 Fax Z 0 V) �i of wwj*. ® % 21 " SEE SHEET C21 FOR CONTINUA 77ON SEC. 31, TWP. 23 N., RGE. 5 E., W.M. N07E &L XPREVA206 7-7 DPA46, ARE fffW 024W a.FANOW 2W SrA oi-24 Or 6 _ ., Sri KEY MAP Ko I L SCALE: 1" = 40' 71 0 21) 40 so CONTOUR 1NTERVAL: TWO FOOT CONTOUR INTERVAL VERTICAL DATUM: ER CITY OF RENTON VERTICAL DATUM (NGVD 1929) BENCHMARK: TOP OF MONUMENT IN CASE. INTERSECTION OF 45TH PL S- AND TALBOT ROAD -21 CITY OF RENTON STATION NO. 1227 ELEV. 154-38 3t is U, 11 5 T t WN 176 07:9 r ASBUILT DOWSE.-, . MIN. APPROVED z Z�� Planning 4205148th Ave. N.E. Suite 200 Engineering Bellevue, Washihgtor 980-7 j��MTE ALLJ9 Su—eying (425) 885-7877 (425) 885-7963 Fax L— - __ DEI Job No. 94172 [Tm I I I C19 SCWWDI 30,F -SCANNED SEP 13 202 176 07:9