Loading...
HomeMy WebLinkAboutS-282012180 140 120 ti cj� 00 Q_ 146 120 100.00' vc P V1 S TA P V1 ELE V = 752.35 A. D. = -3.51 2 &.4511 41 14.95% < �so I Lai LLj Ln 220 + ) Lr1l Q5 ti ccl LLJ Ld W C-N O Q� ck 0 YZ z 2-90 EXIS TING 180 140 120 ti cj� 00 Q_ 146 120 100.00' vc P V1 S TA P V1 ELE V = 752.35 A. D. = -3.51 2 &.4511 41 14.95% K = 28.45 STA 17+54.87-25.24LT 70+00 EXIST SSMH 48- RIM= 174.15- EX. IE=164.00"EX CORE DRILL AND 740 RECHANNEL TO NORTH 140 140 IF-i64.70 84Y 1E= 164.09 87N ADJUST EX RIM TO NEW STREET _F4_ —1.79- 4_'LL EL = 179.90 SCALE: N 26 TH ST P, 1 ° =20' Vl"--70 Sm282012 120 uld F—b Y 110.00 I 220 ) Lr1l Q5 ti 2-90 EXIS TING GROUND 180 14.95% 180 -780 700.00' VC - WO, PV1 STA = 9+20 PV1 ELEV = 763,75 A.D. = J.51 K = 28.45 STA 17+54.87-25.24LT 70+00 EXIST SSMH 48- RIM= 174.15- EX. IE=164.00"EX CORE DRILL AND 740 RECHANNEL TO NORTH 140 140 IF-i64.70 84Y 1E= 164.09 87N ADJUST EX RIM TO NEW STREET _F4_ —1.79- 4_'LL EL = 179.90 SCALE: N 26 TH ST P, 1 ° =20' Vl"--70 Sm282012 120 uld F—b Y 110.00 I as L6 P- ) Lr1l Q5 r1offspaj //-fuu "AS-BUILT" NOTE: V�_ H. T t,7 F,,7,—,,7,__ 77,777-