Loading...
HomeMy WebLinkAboutS-283903e- U) I Z_ a �a Wo 0 x 10 W Z Z a: Q x 3w CO co O r Z Z - �J LL z Z0 cr cr 0- Q0 mo o .. C o �E Ey 3:a U `—I W J P-I �E c o � a� 0 z I, z OD V) Ej ftf U 'o I SANITARY SEWER EXTENTION PROFILE, NOTES AND DETAILS SANITARY SEWER PROFILE STA. 60 +00 TO 65+10± SCALE: 1 " =40' HORIZ. 1 " =5' VERT. SANITARY SEWER NOTES AND SPECIRCATIONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SFWl BE LIMITED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBUC WORKS 24 HOURS IN ADVANCE. THE POUCE DEPARTMENT, FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE 5. A PRECONSTRUCTION CONFERENCE AND A 24 -HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPUSHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 'HOURS iN ADVANCE OF BACKAWNG ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBUC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER AU_ OTHER PLANS. 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A UCENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF '8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATUNE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILLAND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON PROPERLY - PREPARED - FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER. MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. MORTAR FILLET MANHOLE FRAME AND COVER SEE DRAWING BR29 (WITH LOCKING LTD AND COVER IN CITY R /W) ADJUSTMENT (4" MIN.) CONE RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C -443 STEPS - 3/4" DEFORMED BAR STEPS SHALL BE INCLUDED CONCRETE RISER BY PIPE INC_, OR APPROVED EQUAL MAX. PIPE SIZE - 21" LD LADDER -STD. ALUMINUM OR GALVANIZED STEEL CONCRETE SHELF PRECAST BASE SECTION OR CAST IN SHELF. NOTE: SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- CONSEAL OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. SANITARY MANHOLE TYPICAL DETAIL 1 REVISED PER CITY REVIEW NO' REVISION DOLL # 167 FIR 310' RECOMENDED FOR APPROVAL ' BYd BY BY Lu Q o° c W Q O rij (: Q W Z Z Q Cc z OU O � U z O J W J F- P z Q O U H ((I) Z W co _ m a - O Q z (n W W Q O S �U. F_ z� O zw N 5N Ld O X p ~ Z Q z w LJ N Ll S Z Qr N N O N W �� o z- o��� �z N Q Zw Ln N N w F' CD CO N Z O (D 'o O a x d a r u °c TV c� N S � s N > X W 2 , t W L T �V 0 CONS I , CITY OF RENTON DEPARTMENT OF PUBLIC WORKS SANITARY SEWER EXTENSION PROFILE, NOTES AND DETAILS DRAWN 5 7 DATE 2/14/00 FILE NO. � - - -- — CHECKED AS SCALE FIELDBOOK PAGE APPROVED -- SHEET Cems+. OF 10 _ SCANNED OCT 4 2000 Lo O 71 m O 7 LLI U m PROPOSED GRADE ®: Q PIPE - - -- - FDC LINE _ - - - - . - - EX. GRADE 0 CE PIPE - - 10" D.I. FIR €LINE - 20 15 dL 00 LF8 PCV SD -SS6 D 0% .. ... P SDR -35 SS ®0.50 %:NE1V. SSMH . 2 STA.' 61 +10.00 NEW SSMH 1 : -. IE 7303 (8 & 6 IN) - - - - - RIM 25 870.00 IE =75.73 (6° W) STA. 60 +00 00 IE 12 93 :(8 OUT) :.. - - - .. - - - [E=15-93 8 °- Ou RIM =23.60 I E= 12.55 38 (8 1N) N) - E= 12. 6 I ... IE-11.95 EX 12 " }::. .. .. .. :: .... .. !I 60+00 61+00 ! 62+00 63+00 64+00 65+00 SANITARY SEWER PROFILE STA. 60 +00 TO 65+10± SCALE: 1 " =40' HORIZ. 1 " =5' VERT. SANITARY SEWER NOTES AND SPECIRCATIONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SFWl BE LIMITED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBUC WORKS 24 HOURS IN ADVANCE. THE POUCE DEPARTMENT, FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE 5. A PRECONSTRUCTION CONFERENCE AND A 24 -HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPUSHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 'HOURS iN ADVANCE OF BACKAWNG ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBUC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER AU_ OTHER PLANS. 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A UCENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF '8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATUNE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILLAND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON PROPERLY - PREPARED - FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER. MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. MORTAR FILLET MANHOLE FRAME AND COVER SEE DRAWING BR29 (WITH LOCKING LTD AND COVER IN CITY R /W) ADJUSTMENT (4" MIN.) CONE RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C -443 STEPS - 3/4" DEFORMED BAR STEPS SHALL BE INCLUDED CONCRETE RISER BY PIPE INC_, OR APPROVED EQUAL MAX. PIPE SIZE - 21" LD LADDER -STD. ALUMINUM OR GALVANIZED STEEL CONCRETE SHELF PRECAST BASE SECTION OR CAST IN SHELF. NOTE: SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- CONSEAL OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. SANITARY MANHOLE TYPICAL DETAIL 1 REVISED PER CITY REVIEW NO' REVISION DOLL # 167 FIR 310' RECOMENDED FOR APPROVAL ' BYd BY BY Lu Q o° c W Q O rij (: Q W Z Z Q Cc z OU O � U z O J W J F- P z Q O U H ((I) Z W co _ m a - O Q z (n W W Q O S �U. F_ z� O zw N 5N Ld O X p ~ Z Q z w LJ N Ll S Z Qr N N O N W �� o z- o��� �z N Q Zw Ln N N w F' CD CO N Z O (D 'o O a x d a r u °c TV c� N S � s N > X W 2 , t W L T �V 0 CONS I , CITY OF RENTON DEPARTMENT OF PUBLIC WORKS SANITARY SEWER EXTENSION PROFILE, NOTES AND DETAILS DRAWN 5 7 DATE 2/14/00 FILE NO. � - - -- — CHECKED AS SCALE FIELDBOOK PAGE APPROVED -- SHEET Cems+. OF 10 _ SCANNED OCT 4 2000 Lo O 71 m O 7 LLI U m