PUBLIC SANITARY SEWER NOTES AND DETAILS
SMUMY SEWER KITES Aim SPECIRCA11M
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTLTY
DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APHA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE UMFOD TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES; PARTIAL
OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE THE POLICE DEPARTMENT,
FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 'STANDARD SPECIFICATIONS FOR MUNICIPAL PUBUC WORKS CONSTRUCTION"
PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF
RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHAWN ARE APPROXIMATE AND Ti SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRECONSTRUCRON CONFERENCE AND A 24 -HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILUNG ALL CONSTRUCTION.
6. CONTRACT O IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFEII' OF
WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
7. T SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY
OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHAT TAKE PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB STE WHENEVER CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH
HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
11. EACKILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES,
MAYIML;M DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED
LAYEka" MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH.
MATERIALS .0 COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED
ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATUNE CUT WITH SAW IN A
CONTINUOUS LINE A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT
HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT
FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LND ON A PROPERLY' PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1)
OF THE CURRENT STATE' OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS "SHALL INCLUDE
NECESSARY LEVELING OF THE TRENCH BOTTOM, OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION
OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY
DENSE UNYIELDING BASE PIPE BEDDING SHALL' BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM
D 3034, SDR 35, OR DUCTILE IRON CUSS 50.
17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA,
COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
4- 54-
x I,- (T1'P)
I
ICI,,
l l wwp -i? 448
i
24 "z 6" FRAME AND LIP
PER DRAWING BR29.
MORTAR
FILLET
6" MI
MANHOLE FRAME AND COVER
SEE DRAWING BR29
ADJUSTMENT (4" MIN.)
CONE
RUBBER GASKETED JOINTS
IN ACCORDANCE WITH ASTM C -443
STEPS - 3/4" DEFORMED BAR
STEPS SHALL BE INCLUDED
CONCRETE RISER BY PIPE INC.,
OR APPROVED EQUAL
MAX. PIPE SIZE -. 21" I.D.
LADDER -STD. ALUMINUM
OR GALVANIZED STEEL
CONCRETE SHELF
PRECAST BASE SECTION
OR CAST IN SHELF,
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR
GALVANIZED SAFETY STEPS OR EQUAL.
2. STEPS ARE TO BE IN�PLACE BEFORE MANHOLE
SECTIONS ARE INSTALLED.
3. CASTING TO BE PER DWG. BR29:
4. MANHOLE SECTIONS TO BE OF REINFORCED
PRECAST CONCRETE.
5. ALL JOINTS SHALL BE GROUTED
6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR
SURFACES, INCLUDING CHANNELING, COATED (SEALED)
WITH A HIGH SOLIDS URETHANE COATING;
WASSER MC- CONSEAL OR APPROVED EQUAL;
COLOR OF COATING SHALL BE WHITE..
7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE
WITH ASTM C-443.
8. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE
DIAMETER OF THE LARGEST PIPE.
9. CONNECTIONS. TO MANHOLE SHALL BE MADE USING GPK
ADAPTOR, KOR N -SEAL BOOTS OR APPROVED EQUAL
SANITARY MANHOLE TYPICAL DETAIL
NOT TO SCALE (CITY OF RENTON STD. PLAN NO. BR28)
4- MIN. TO 12- MAX.
NOTES:
- 1. STEPS TO BE 3/4" 4 DEFORMED BAR GALVANIZED SAFTEY
STEPS OR EQUAL.
2. STEPS 'ARE .TO BE IN PLACE BEFORE MANHOLE SECTIONS
ARE INSTALLED.
3. CASTING T0. BE PER DWG. BR29.
4r MIN. To 84- MAX. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST
CONCRETE.
ARTABLE 2• TO s 5. OPENING I SHOULD BE ON DOWNSTREAM SIDE.
6. ALL JOINTS SHALL BE GROUTED
7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR
SURFACES, INCLUDING CHANNELING, COATED (SEALED)
WITH A HIGH SOLIDS URETHANE COATING;
WASSER MC CONSEAL OR APPROVED EQUAL;
COLOR OF COATING SHALL BE WHITE.
8. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE
WITH ASTM C -443.
6- 9. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE
INSIDE DIAMETER OF THE LARGEST PIPE.
10. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK
ADAPTOR, KOR -N -SEAL BOOTS OR APPROVED EQUAL.
SANITARY SHALLOW MANHOLE TYPE B
NOT TO SCALE (CrrY OF RENTON STD. PLAN NO. BR37)
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY CENTER LINE
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY' CENTERLINE
NOT TO SCALE (CITY OF RENTON STD PLAN NO HR -23)
-,t'P'- 8" b 8
STRUCTURE
MIN MIN I MIN 1 MINj MIN
-FACE OF CURB OR
2° CLASS "B" -
NOTE: INSTALL 4 PIPE ANCHORS
Z" CLASS 'B'
ACP CLASS 'E' OR 'B'
6" CRUSHED
-
SURFACING TOP COURSE
2"
CRUSHED ROCK,
OF I" DIA. PIPE. -
CLASS 'E'
OR
AS REQUIRED BY ENGINEER
OR
CLASS B.
139 LF ® 209 +(PLUS)
6.5' MIN.
2" DEPTH OF
GRIND OR SAWCUT AND REMOVE
* SEE DWG# HR -05 FOR MINIMUM STANDARDS
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY CENTER LINE
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY' CENTERLINE
NOT TO SCALE (CITY OF RENTON STD PLAN NO HR -23)
-,t'P'- 8" b 8
STRUCTURE
6.5' MIN.
1' t' 2.5' 1' 1'
MIN IMIN r MIN MINIMIN
-FACE OF CURB OR
EDGE OF PAVEMENT
NOTE: INSTALL 4 PIPE ANCHORS
Z" CLASS 'B'
ACP CLASS 'E' OR 'B'
6" CRUSHED
SURFACING TOP COURSE
CENTER LINE OR
LANE LINE
CRUSHED ROCK,
OF I" DIA. PIPE. -
FLOWABLE FILL
OR
AS REQUIRED BY ENGINEER
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY CENTER LINE
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
WHEN PERPENDICULAR TO ROADWAY' CENTERLINE
NOT TO SCALE (CITY OF RENTON STD PLAN NO HR -23)
-,t'P'- 8" b 8
STRUCTURE
^
^I
2!:O-
1
NOTE: INSTALL 4 PIPE ANCHORS
EVENLY SPACED ALONG 139 LF
i'-
OF I" DIA. PIPE. -
I
139 LF ® 209 +(PLUS)
BOLTED STEEL
8" DIA. PIPE
ii� STRAP
NOTE: FOR HOPE PIPE, 1/2 C.Y. OF
=
TRENCH SIDES
CONCRETE SHALL ENCASE THE PIPE AT
ANCHOR BOLT
�I
VIII
EACH ANCHOR AND AN HOPE GRIP
COLLAR SHALL BE USED. THE TRENCH
EMBEDDED IN
-III
HE
FOR THE ANCHOR SHALL BE A MINIMUM
1 CUBIC FOOT
CONC. BLOCK.
-
-
- CONCRETE BLOCK
OF 1' WIDER THAN THE DITCH FOR THE
SANITARY SEWER MAIN.
II _
I
1111111 III I1' IHIII
POURED NEAT)
NOTE: TRENCHES 4 FEET OR
GREATER SHOULD BE SHORED.
SECTION A -A
ROLL # Ri
2!:O-
1
PIPE ANCHOR DETAIL
NOT TO SCALE
2 cl) N
w
m cli
O O L
Li w
QZQr 'TNo
s0� Nv n
CID W ir- OD
Z = 00 0
ui 60 Q
V J Q C_ w N
< 0 C-4 N
w w
H O Q� W a
E
ZWZ�QmQ .-
00m:w�wm
C-4 O co o
0 0 Q U G
Cl) Q
U w Z?r O o
0 CID
O U
W co
J
co t`
W
Q
Z Q
9co
m Z
D
a-
I Ih
o z�
Ed a¢
Z Q z w
Li N L` S z
O N oo
oO N r Z>
Z p1 cD oo w w
N a I Z
c- N N -
F- �
N LJ N N J¢
`j� O ONX S
y bb
- J i
Q z
z
V Z
S'
RESERVOIR SHORT PLAT
SANITARY SEWER
NOTES AND DETAILS
'REVISED PER CITY REVIEW DCS JJ 12 -1 -99 DESIGNED OTC DATE 7 22/99 TILE NO.
'.REVISED PER CITY REVIEW TICS JJ 9 -29 -99 DI3awN AB_ --
C D SOAI -E 1 20 RELD BOOK___
REVISED PER CITY.. REVIEW DCS JJ 8-10 -99 _ /�.L
REVISION BY APPR. DATE APPROVED - oinccrov or Puei c woaus SHEET Cio OF
CD , ') - .2 J'6 d Q .S SCILUMAI'D OCT 4 2000
A
ro�o
°�x N
w000
o >r '
v,
c� C�
T
t
I
V
z
7
J