Loading...
HomeMy WebLinkAboutS-290508G a y 0 fv iiog I n n 0 744 o° D N N N 10 0 u; o CONSTRUCRON SEQUENCE FOR SANITARY SEWER REROU77NG R1 -10 AND R7 -11- 1. THE CONTRACTOR AND HIS ENGINEER SHALL PROVIDE A FULL PLAN AND OPERATIONAL METHODOLOGY SHOWING 774E REROUTING OF THE EXIS77NG 24" FACILITY, INCLUDING PUMP SIZING AND TYPE 2 THE PLANS (REFERENCED IN N07E 1 ABOVE) SHOULD BE BASED ON N07ES 3 THROUGH 14 OF THIS CONS7RUC770N SEQUENCE. J. CONSTRUCT THE NEW SEWER FROM 5' NORTHWEST OF ER1 -10 TO NEW MANHOLE SSMH 1. 4. CONSTRUCT THE NEW SEWER FROM NEW MANHOLE SSMH 1 TO 5' OUTSIDE OF MANHOLE ERI -11. 5. EXCAVATE SUFFICIENT AREA AROUND MANHOLES ERI -70 AND ERI -11 TO ALLOW FOR THE SEWER CONNEC77ONS TO BE MADE 6. INSTALL A PUMP W77H/N MANHOLE ERI -12 OF SUFFCIENT CAPACITY TO PUMP 774E PEAK FLOW IN THE MAIN SEWER DURING THE NEW SEWER CONNEC77NN. 7. INSTALL A TEMPORARY PLUG IN THE 24" INLET INTO MANHOLE ERI -11 AND OPERA 7E THE PUMP TO BYPASS THE SEWER FLOW INTO MANHOLE ERI -9_ B. REMOVE 774E EXIS77NG 24' SEWER BETWEEN ERI -10 AND ERI -11. 9. CREATE OPENINGS IN MANHOLES ERI -10 AND ERI -11 TO ACCOMMODATE THE NEW SEWER CONNECTIONS. 10. MODIFY THE FLOW CHANNELS WITHIN MANHOLES ERl -10 AND ERI -11 TO ALIGN {NTH 7HE NEW SEWER CONNECTIONS 11. INSTALL 774E NEW SEWER CONNECTONS INTO MANHOLES ERI -10 AND ERI -11. 12. PATCH MANHOLES ERI -10 AND ERI -11 AND ENSURE A WATER77GHT JOINT AT EACH NEW CONNECTION. 13. REMOVE 774E TEMPORARY PLUG IN MANHOLE ERI -11. 14. REMOVE 774E PUMPING SYSTEM IN MANHOLE ERI -12 SSMH 1 TO EXISTING SSMH ERI -10 PORTIONS SEC. 16, TWP. 23 N., RGE. 5 E., W.M. R OLL 773 397 250 D 7 240 J E (9 TRIA Project Management Civil 8ngineering Land Surveying Land Use Planning Landscape Architecture Site Design 11814 115th Ire. NB KI&I d. NA 9@0.44 -8921 Tel 485A9IAM Fez 42 AIM81 'fall Flee 89@.480.8'F8 w 16.deeexeom �loll \ uj LL SCALE: 1" = 40' O 4 Y, � l NO7E• SANITARY SEWER MAINS THAT Z HAVE MORE THAN 15' OF COVER SHALL 2; NOTE.• ALL EXIS77NG TOPOGRAPHY BE E17HER C900, C905 OR D.I. PIPE. PROVIDED BY M.A. SEGALE, INC. Q mi AND R/NGEL AND ASSOC/A TES S 4' 260 E5 3 NOTE.• ALL EXIS77NG SSMH INFORMATION z t CW/� Z � i OVER P/P£R TYv) r J PROPOSED FlN/SH GRADE ° OVER PIPE (TYP) it 250 I� I� I� �I 127 =24" C905 5= 0.0075 IL w 0 M SSMH 1 - so" TOP 255.17 Z 8° lE 247.54 (IN) EX SSMH ERI -7C 60" %M 2¢" IE 233.20 (lN) RIM 259.71 0 - 2*-E- 33.'10' (OUTJ-.," , ' "7E "Z32. (I) V) W/ INSIDE DROP PER: - 7-0 BE REMOVED. of DETAIL, SHEET 38 24" IE 23281 (OUT) 6' IE 234.99 (IN) NEW 24" 1E 232,91 (IN) ADJUST RIM TO 257.Ot SSMH 1 TO EXISTING SSMH ERI -10 PORTIONS SEC. 16, TWP. 23 N., RGE. 5 E., W.M. R OLL 773 397 250 D 7 240 J E (9 TRIA Project Management Civil 8ngineering Land Surveying Land Use Planning Landscape Architecture Site Design 11814 115th Ire. NB KI&I d. NA 9@0.44 -8921 Tel 485A9IAM Fez 42 AIM81 'fall Flee 89@.480.8'F8 w 16.deeexeom �loll \ uj LL SCALE: 1" = 40' O 4 Y, v+ ASSOC /AYES � � l Z 2; NOTE.• ALL EXIS77NG TOPOGRAPHY PROVIDED BY M.A. SEGALE, INC. Q AND R/NGEL AND ASSOC/A TES O� E5 3 NOTE.• ALL EXIS77NG SSMH INFORMATION SHOWN WAS PROVIDED BY R/NGEL AND CW/� Z v+ ASSOC /AYES � � l c n A � n DONALD L HILL. PE PROJECT MANAGER BRADIEY T. fREVA4N, FYS PROJECT SURVEYOR WILLhW ( GOGGJN, FE PROJECT ENGINEER .EFFREY L CaV,,' ASLA PROJECT LANDSCAPE ARCHITECT DATE: JANUARY 19, 2001 SCALE: e9FL:1" =40' VW.0'�==4• N 00 V pF 97 Gn 3�vF loaf ee �o atza 'v V,01 T >iHL / 03 Checked for Compliance to City Standards -1016/10 I//,/. STAMP NOT VALID { UNLESS SIGNED AND DATED $$ JOB NW ER ® ® - ®ZZ S RBEET "'m 36OF 52 - II g ®2001 TRIAD ASSOCIATES v O O 11213 C C) , S- ? 0'- SCANNED JUL 2 7 2001 e � m ro zC) Nro o <; �b B N I�nn �d 1 ti ti m ro zC) Nro o <; �b B N I�nn �d 1 ti ti