Loading...
HomeMy WebLinkAboutS-290512� f-- f— ~ I (� � � � s a � c CONSTRUC7/ON N FOR SANITARY sc R R R ANO RI —JO AND Rl —Tf• �i��. � ��R® _ Project Civil Engineering Land 1. THE CONTRACTOR AND HlS ENGNEERSHALL PRONDE A FULL PLAN.ANO OPERATIONAL � O \ / Lend Use Landscape Site 11814 115W dve. N6 7701 426.RIA44B Toll Ftee 850.45&9155 Planning Architecture Design Hirlc1m41fE Y6W4 -80E9 Pax 4HSAEIS451 �xrtMde®nemm METHODOLOGY SHOWING THE REROUTING OF THE EXISTING 24' FAGDTY, INCLUDING PUMP SlZ/NG AND TYPf. 2. THE PLANS (REFERENCED /N NOTE 1 ABOVE) SHOULD BE BASED ON NOTES 3 THROUGH 14 aF Tws corasTRUCnDN SEOt/ENCE. ' 3. CONSTRUCT THE NEW SEWER FROM 5' NORTHWEST OF ER! -10 . ?NEW MANHOLE SSMH 1. 4. CONSTRUCT THE NEW SEWER FROM NEW MANHOLE SSMH 1 TO 5' OUTSIDE OF MANHOLE ER / -71. 5. EXCAVATE SUFF7GENT AREA AROUND MANHOLES £RI -f0 AND ERl -71 TO ALLOW FOR THE SEWER CONNEC710NS TO BE MADE. 6. INSTALL A PUMP WITHIN MANHOLE ERI -12 OF SUfTICIENT CAPAC /7?' 70 PUMP THE PEAK FLOW IN THE MAIN SEWER DURING THE NEW SEWER CONNECTION. 7. INSTALL A TEMPORARY PLUG IN THE 24 "INLET INTO MANHOLE ERl -11 AND OPERATE THE � .. NOTE.• ALL EX/S77NG TOPOGRAPHY PUMP TO BYPASS THE SEWER FLOW INTO MANHOLE ER/ -9. Q W 8. REMOVE THE EXISTING 24' SEWER BETWEaV ER / -10 AND ER / -11. •Q 4 9. CREATE OPENINGS 7N MANHOLES ERI-1G AND ER,' -il 7O ACCOMMODATE THE NEW SEWER CONNECTONS AND RINGEL AND ASSOCIATES O 70. MODIFY TH£ FLOW CHANNELS W17HlN MANHOLES ERI -10 AND £R / -11 TO ALIGN W1TH THE NEW SEWER CONNECRONS 11. INSTALL THE NEW SEWER CONNECTIONS INTO MANHOLES ERl -70 AND ER / -1f. NOTE.• ALL EX /STING SSMH /NFORMAT /ON 12 PATCH MANHOLES ERI -10 AND ER! -11 AND ENSURE A WATERTIGHT JOINT AT EACH SHOWN WAS PROI/IDED BY RINGEL AND NEW CONNECTION. 13 REMOVE THE TEMPORARY PLUG //V MANHOLE ER / -11. � ;t 14. REMOVE THE PUMPING SYSTEM IN MANHHOLE ERI -12. Q 2 � R/M ELE', HORIZONTAL DATUM: NAD 1983/1997 FINAL UN BASIS OF BEARINGS HELD BEARING OF N01 (75'10 E' BETWEEN THE IWN. 23N., RGE. Sf., W.M., (CITY OF g5pHi 0 V� s3 N O N 0 �o o� �W �� W LL I I I I Z I SSMH 1 TO EX /STING SSMH 'ER / -10 wwP- �'��t�or I 0 0 Y S ` , v 4' � �� � � �� � ��� ��� z O NOTE.• SANITARY SEWER MAINS THAT HA l/E MORE THAN 15' OF COVER SHALL' BE EITHER C900, C905 ''OR Da PIPE. S SEC. 16, TWP. 23 N., RGE. 5 E., e, r ,- • e(i �i� � � i DONALD .I H/IL,.PE PR016Cf YANAG6R 91PAOLEY T. f7PEE1IM; PLS PROD3CT SOHVHYOR MIL]/AM .A COCGIN. PE PROI&CT RNGIIiBBR JEFFREY L. CLW, ASLA PR0J8CT LANDHCAPR ARCHITECT DATE: JANUARY 19, 2001 SCALE: HOID8.: 1' =40' Yffi'.:1 a4' FPM �o ."Q °� y'M 3 e �. �O 8128 W SJONALaE�G�•c �Z 1CK D Checked for Compliance to City Standards �/i /� �IQ��oY � /�Ir� / l STdYC' NOT 4ALID # S� � � �"�'� � /��• ,� � DNI,�s scNHD AND neTaD �9 � r � ��ig��'fri 11G -'y�S�`- g IOH NU11BHi OO —OZZ �g 236 3 7 44/�YIY� � Dt N �>: LA�o .� HREBf RmmER 36oe52 ,o- EAPIRES 9/Il j O,'S ®2DOt TRIAD ASSOCIATES � U A 0 0 1 SCANNED FEB 15 2002 � � • � —'�o S/z C (� , �'- �U °- �` °+'� SCANNED JUL 2 7 2001 s y �. m �` � .v � � m �d �^ N b ar � m � � � N m `^ 0 �� �� c° �i��. � ��R® _ Project Civil Engineering Land �v� Management Surveying � O \ / Lend Use Landscape Site 11814 115W dve. N6 7701 426.RIA44B Toll Ftee 850.45&9155 Planning Architecture Design Hirlc1m41fE Y6W4 -80E9 Pax 4HSAEIS451 �xrtMde®nemm SCALE: 1" = 40' p� 1,. 0 20 40 80 re w v�l 2 2 � � .. NOTE.• ALL EX/S77NG TOPOGRAPHY Q W PROI/IDED BY M.A. SEGALE, INC. •Q 4 � b) AND RINGEL AND ASSOCIATES O .��� i NOTE.• ALL EX /STING SSMH /NFORMAT /ON y SHOWN WAS PROI/IDED BY RINGEL AND ASSOC /A TES y dLi � ;t .. � Q 2 HORIZONTAL DATUM: NAD 1983/1997 BASIS OF BEARINGS HELD BEARING OF N01 (75'10 E' BETWEEN THE IWN. 23N., RGE. Sf., W.M., (CITY (� NORTHWEST CORNER OF SECTION 16, OF RENRJN: MOH. j612) AND THE WEST WARIER CORNER MONUMENT 'A v+ � OF SAID SECTION '16. THE BEARING IS DERIVED FROM STALE PLANE COORDINATES FOUND IN THE CITY OFRENTON SURVEY CONTROL ` NETWORK ANDCORR080RA7ED BYVARIOUS RECORD. OF SURVEYS IN THE IMMEDIATE AREA VERTICAL DATUM: NAVD 1988 BENCHMARKS � � 9 ORIGINARNG BENCHMARK.• C/TY OF RENTON MONUMENT }872 -TOP OF MONUMENT IN CASE. ELEVATION 260.068.' BENCHMARK /1 - '.Y' IN SIDEWALK AT SE. QUADRANT OF INTERSECTION OF N.E. 3RD ST. AND EDMONOS AVE. N.E. ELEVATION 272.48.' �, BENCHMARK {2 -TOP OF MONUMENT AT THE WEST QUARTER CORNER OF SECTION 16, 7WN. 23N.. RGE. SE., W.M. ELEVATION 31280.' BE/JCHMARK {3 -TOP OF 1 -7/4' REBAR AT THE NORTHWEST SIDE OF A SET OF 6 POWER POLES BETWEEN 7W0 (2) RETENTION/ p B DETENTION PONDS APPROXIMATELY 950' EAST OF WEST QUARTER CORNER OF SECTION 16. ELEVATION 259.77' o � � � a�O, � �� /P _/ '! A h h i DONALD .I H/IL,.PE PR016Cf YANAG6R 91PAOLEY T. f7PEE1IM; PLS PROD3CT SOHVHYOR MIL]/AM .A COCGIN. PE PROI&CT RNGIIiBBR JEFFREY L. CLW, ASLA PR0J8CT LANDHCAPR ARCHITECT DATE: JANUARY 19, 2001 SCALE: HOID8.: 1' =40' Yffi'.:1 a4' FPM �o ."Q °� y'M 3 e �. �O 8128 W SJONALaE�G�•c �Z 1CK D Checked for Compliance to City Standards �/i /� �IQ��oY � /�Ir� / l STdYC' NOT 4ALID # S� � � �"�'� � /��• ,� � DNI,�s scNHD AND neTaD �9 � r � ��ig��'fri 11G -'y�S�`- g IOH NU11BHi OO —OZZ �g 236 3 7 44/�YIY� � Dt N �>: LA�o .� HREBf RmmER 36oe52 ,o- EAPIRES 9/Il j O,'S ®2DOt TRIAD ASSOCIATES � U A 0 0 1 SCANNED FEB 15 2002 � � • � —'�o S/z C (� , �'- �U °- �` °+'� SCANNED JUL 2 7 2001 s y �. m �` � .v � � m �d �^ N b ar � m � � � N m `^ 0 �� �� c°