CONSTRUC7/ON
N FOR SANITARY sc R R R ANO RI —JO AND Rl —Tf•
�i��.
� ��R® _
Project
Civil Engineering
Land
1. THE CONTRACTOR AND HlS ENGNEERSHALL PRONDE A FULL PLAN.ANO OPERATIONAL
�
O
\ /
Lend Use
Landscape
Site
11814 115W dve. N6
7701 426.RIA44B
Toll Ftee 850.45&9155
Planning
Architecture
Design
Hirlc1m41fE Y6W4 -80E9
Pax 4HSAEIS451
�xrtMde®nemm
METHODOLOGY SHOWING THE REROUTING OF THE EXISTING 24' FAGDTY, INCLUDING PUMP
SlZ/NG AND TYPf.
2.
THE PLANS (REFERENCED /N NOTE 1 ABOVE) SHOULD BE BASED ON NOTES 3 THROUGH 14
aF Tws corasTRUCnDN SEOt/ENCE.
'
3.
CONSTRUCT THE NEW SEWER FROM 5' NORTHWEST OF ER! -10 . ?NEW MANHOLE SSMH 1.
4.
CONSTRUCT THE NEW SEWER FROM NEW MANHOLE SSMH 1 TO 5' OUTSIDE OF MANHOLE ER / -71.
5.
EXCAVATE SUFF7GENT AREA AROUND MANHOLES £RI -f0 AND ERl -71 TO ALLOW FOR THE
SEWER CONNEC710NS TO BE MADE.
6.
INSTALL A PUMP WITHIN MANHOLE ERI -12 OF SUfTICIENT CAPAC /7?' 70 PUMP THE PEAK FLOW
IN THE MAIN SEWER DURING THE NEW SEWER CONNECTION.
7.
INSTALL A TEMPORARY PLUG IN THE 24 "INLET INTO MANHOLE ERl -11 AND OPERATE THE
� ..
NOTE.• ALL EX/S77NG TOPOGRAPHY
PUMP TO BYPASS THE SEWER FLOW INTO MANHOLE ER/ -9.
Q
W
8.
REMOVE THE EXISTING 24' SEWER BETWEaV ER / -10 AND ER / -11.
•Q
4
9.
CREATE OPENINGS 7N MANHOLES ERI-1G AND ER,' -il 7O ACCOMMODATE THE NEW SEWER
CONNECTONS
AND RINGEL AND ASSOCIATES
O
70.
MODIFY TH£ FLOW CHANNELS W17HlN MANHOLES ERI -10 AND £R / -11 TO ALIGN W1TH
THE NEW SEWER CONNECRONS
11.
INSTALL THE NEW SEWER CONNECTIONS INTO MANHOLES ERl -70 AND ER / -1f.
NOTE.• ALL EX /STING SSMH /NFORMAT /ON
12
PATCH MANHOLES ERI -10 AND ER! -11 AND ENSURE A WATERTIGHT JOINT AT EACH
SHOWN WAS PROI/IDED BY RINGEL AND
NEW CONNECTION.
13
REMOVE THE TEMPORARY PLUG //V MANHOLE ER / -11.
�
;t
14.
REMOVE THE PUMPING SYSTEM IN MANHHOLE ERI -12.
Q
2
� R/M ELE',
HORIZONTAL DATUM: NAD 1983/1997
FINAL UN
BASIS OF BEARINGS HELD BEARING OF N01 (75'10 E' BETWEEN THE
IWN. 23N., RGE. Sf., W.M., (CITY
OF g5pHi
0
V�
s3
N O
N
0
�o
o�
�W
��
W LL I I I I Z I SSMH 1 TO EX /STING SSMH 'ER / -10
wwP- �'��t�or
I
0
0
Y
S ` ,
v
4' �
�� �
� ��
� ���
���
z
O
NOTE.• SANITARY SEWER MAINS THAT
HA l/E MORE THAN 15' OF COVER SHALL'
BE EITHER C900, C905 ''OR Da PIPE.
S SEC. 16, TWP. 23 N., RGE. 5 E.,
e, r ,- •
e(i
�i� � �
i
DONALD .I H/IL,.PE
PR016Cf YANAG6R
91PAOLEY T. f7PEE1IM; PLS
PROD3CT SOHVHYOR
MIL]/AM .A COCGIN. PE
PROI&CT RNGIIiBBR
JEFFREY L. CLW, ASLA
PR0J8CT LANDHCAPR ARCHITECT
DATE: JANUARY 19, 2001
SCALE: HOID8.: 1' =40' Yffi'.:1 a4'
FPM �o
."Q °� y'M
3 e �.
�O 8128 W
SJONALaE�G�•c
�Z 1CK D Checked for Compliance to City Standards �/i /�
�IQ��oY � /�Ir� / l STdYC' NOT 4ALID #
S� � � �"�'� � /��• ,� � DNI,�s scNHD AND neTaD �9
� r � ��ig��'fri 11G -'y�S�`- g
IOH NU11BHi OO —OZZ �g
236 3
7 44/�YIY� � Dt
N �>: LA�o .� HREBf RmmER 36oe52
,o-
EAPIRES 9/Il j O,'S
®2DOt TRIAD ASSOCIATES � U A 0 0 1
SCANNED FEB 15 2002 � � • � —'�o S/z C (� , �'- �U °- �` °+'� SCANNED JUL 2 7 2001
s y
�.
m
�` �
.v � �
m �d
�^ N
b
ar
� m � �
� N
m `^
0
��
��
c°
�i��.
� ��R® _
Project
Civil Engineering
Land
�v�
Management
Surveying
�
O
\ /
Lend Use
Landscape
Site
11814 115W dve. N6
7701 426.RIA44B
Toll Ftee 850.45&9155
Planning
Architecture
Design
Hirlc1m41fE Y6W4 -80E9
Pax 4HSAEIS451
�xrtMde®nemm
SCALE: 1" = 40'
p� 1,.
0 20 40 80
re w
v�l
2
2 �
� ..
NOTE.• ALL EX/S77NG TOPOGRAPHY
Q
W
PROI/IDED BY M.A. SEGALE, INC.
•Q
4
� b)
AND RINGEL AND ASSOCIATES
O
.���
i
NOTE.• ALL EX /STING SSMH /NFORMAT /ON
y
SHOWN WAS PROI/IDED BY RINGEL AND
ASSOC /A TES
y dLi
�
;t
..
�
Q
2
HORIZONTAL DATUM: NAD 1983/1997
BASIS OF BEARINGS HELD BEARING OF N01 (75'10 E' BETWEEN THE
IWN. 23N., RGE. Sf., W.M., (CITY
(�
NORTHWEST CORNER OF SECTION 16,
OF RENRJN: MOH. j612) AND THE WEST WARIER CORNER MONUMENT
'A
v+
�
OF SAID SECTION '16. THE BEARING IS DERIVED FROM STALE PLANE
COORDINATES FOUND IN THE CITY OFRENTON SURVEY CONTROL
`
NETWORK ANDCORR080RA7ED BYVARIOUS RECORD. OF SURVEYS IN
THE IMMEDIATE AREA
VERTICAL DATUM: NAVD 1988
BENCHMARKS
� � 9
ORIGINARNG BENCHMARK.• C/TY OF RENTON MONUMENT }872 -TOP
OF MONUMENT IN CASE. ELEVATION 260.068.'
BENCHMARK /1 - '.Y' IN SIDEWALK AT SE. QUADRANT OF
INTERSECTION OF N.E. 3RD ST. AND EDMONOS AVE. N.E. ELEVATION
272.48.'
�,
BENCHMARK {2 -TOP OF MONUMENT AT THE WEST QUARTER CORNER
OF SECTION 16, 7WN. 23N.. RGE. SE., W.M. ELEVATION 31280.'
BE/JCHMARK {3 -TOP OF 1 -7/4' REBAR AT THE NORTHWEST SIDE
OF A SET OF 6 POWER POLES BETWEEN 7W0 (2) RETENTION/
p B
DETENTION PONDS APPROXIMATELY 950' EAST OF WEST QUARTER
CORNER OF SECTION 16. ELEVATION 259.77'
o
� � � a�O,
� ��
/P
_/ '!
A h h
i
DONALD .I H/IL,.PE
PR016Cf YANAG6R
91PAOLEY T. f7PEE1IM; PLS
PROD3CT SOHVHYOR
MIL]/AM .A COCGIN. PE
PROI&CT RNGIIiBBR
JEFFREY L. CLW, ASLA
PR0J8CT LANDHCAPR ARCHITECT
DATE: JANUARY 19, 2001
SCALE: HOID8.: 1' =40' Yffi'.:1 a4'
FPM �o
."Q °� y'M
3 e �.
�O 8128 W
SJONALaE�G�•c
�Z 1CK D Checked for Compliance to City Standards �/i /�
�IQ��oY � /�Ir� / l STdYC' NOT 4ALID #
S� � � �"�'� � /��• ,� � DNI,�s scNHD AND neTaD �9
� r � ��ig��'fri 11G -'y�S�`- g
IOH NU11BHi OO —OZZ �g
236 3
7 44/�YIY� � Dt
N �>: LA�o .� HREBf RmmER 36oe52
,o-
EAPIRES 9/Il j O,'S
®2DOt TRIAD ASSOCIATES � U A 0 0 1
SCANNED FEB 15 2002 � � • � —'�o S/z C (� , �'- �U °- �` °+'� SCANNED JUL 2 7 2001
s y
�.
m
�` �
.v � �
m �d
�^ N
b
ar
� m � �
� N
m `^
0
��
��
c°