HomeMy WebLinkAboutS-2939153
s
�a
V
N
N I L
n
� d
a m
N
, I
I
W
z
o J I i
a _ i
FILTER FABRIC FENCE
- -Z
—
uO. / Jar\, x ,eve y3y
n ems?
HED
ywM
\ O
6° Cl OVERFLOW PIPE -/ k
/ PP W/ PM \&
ELEC CBNT
/ PP W/
XFMR
NOTES:
1. SANDBAG SEDIMENT DAMS SHALL BE
PLACED IN DRAINAGE DITCHES 4 FEET
UPSTREAM OF THE DOWNSTREAM
CULVERTS THAT ARE ADJACENT TO
CURRENT CONSTRUCTION OR AS DIRECTED
BY THE ENGINEER /INSPECTOR.
2. SEDIMENT TRAPS SHALL BE INSPECTED
WEEKLY DURING DRY WEATHER AND DAILY
DURING WET WEATHER. SEDIMENT SHALL
BE REMOVED WEEKLY OR AT THE DIRECTION
OF THE ENGINEER /INSPECTOR.
3. SEDIMENT TRAPS SHALL BE REMOVED FROM
A DITCH ONCE THE ADJACENT CONSTRUCTION
HAS BEEN COMPLETED.
4. FILTER FABRIC FENCE SHALL BE PLACE ALONG
DRAINAGE DITCHES WHILE CONSTRUCTION IS
TAKING PLACE ADJACENT TO THEM. THESE
FENCES SHALL BE REMOVED ONCE CONSTRUCTION
ADJACENT TO THEM HAS BEEN COMPLETED.
5. FILTER FABRIC FENCE SHALL BE PLACED IN ALONG
THE EDGE OF TEMPORARY CONSTRUCTION EASEMENTS
(AS SHOWN ON THIS PLAN) THAT AREDOWN -SLOPE
FROM THE CONSTRUCTION AREAS OR AS DIRECTED
BY THE ENGINEER.
b�
0
1
I
' 30 I 30
, I ,
I , i
i
5 4 3 2
jc-) -
I
Z i STORY ` \ _ \ \ \ \ \\
FRAME
FF =226
_ Mu /�� /`'
I%wpy(T \� \�� \Oa�q \NpI�oN'O /��_�f I
N
m
I
FILTER FABRIC FENCE
FILTER FABRIC -\
SAND BAGS FILLED \
WITH PEA GRAVEL
OR WASHED DRAIN ROCK.
1RIC
SANDBAG SEDIMENT DAM
SANDBAGS SHALL BE FILLED
WITH PEA GRAVEL OR WASHED
DRAIN ROCK.
SANDBAG SEDIMENT DAM
SHALL BE THE GREATER
OF } THE DEPTH OF
DITCH OR 1' DEEP (MIN.).
m
I
\\ �\�- Igo
Imo_ �C28�
27 I I zi IILTE ABR /C PENCE
SANDBAG SEDIMENT DAM �.
�I I i1 \\
\ BLDG 3 I
FF= 21;3'
SHOP \ `/\
I \ 2 J
I -- i° SHED GARAGE _.r X� III
\ —
- DRAIN
OHP—
I GA PPS..
b
;NO I4
BSOLUTELY TRESPASSING I
/STAKE
a 801
I
SANDBAG SEDIMENT DAM -
3
W
` ``I .Sj E 683 w I I p
o•
�EEpPE w` a�
W W`°
91
4
(
i
/-12" HIGH PRESSURE —
OLYMPIC GAS LINE
INDICATOR POST
a DRIVEWAY A
0
v
.....t.... GA
x-
P OHP- -OHP --
XMFR — —. — — —
FILTER FABRIC FENCE
V
ry^
_f
V wo
mm
o
I
myI I I I
I
I
m0
F
zm❑ ( ti
0
\
1
GARA GE
OAT DO
z
LL
�d
=
I
D
I
rco4!
°o<
oa
FILTER FABRIC FENCE
CONC WAA
3' DRD
h
ORE
I m
\W/
\
NOTES:
1. SANDBAG SEDIMENT DAMS SHALL BE
PLACED IN DRAINAGE DITCHES 4 FEET
UPSTREAM OF THE DOWNSTREAM
CULVERTS THAT ARE ADJACENT TO
CURRENT CONSTRUCTION OR AS DIRECTED
BY THE ENGINEER /INSPECTOR.
2. SEDIMENT TRAPS SHALL BE INSPECTED
WEEKLY DURING DRY WEATHER AND DAILY
DURING WET WEATHER. SEDIMENT SHALL
BE REMOVED WEEKLY OR AT THE DIRECTION
OF THE ENGINEER /INSPECTOR.
3. SEDIMENT TRAPS SHALL BE REMOVED FROM
A DITCH ONCE THE ADJACENT CONSTRUCTION
HAS BEEN COMPLETED.
4. FILTER FABRIC FENCE SHALL BE PLACE ALONG
DRAINAGE DITCHES WHILE CONSTRUCTION IS
TAKING PLACE ADJACENT TO THEM. THESE
FENCES SHALL BE REMOVED ONCE CONSTRUCTION
ADJACENT TO THEM HAS BEEN COMPLETED.
5. FILTER FABRIC FENCE SHALL BE PLACED IN ALONG
THE EDGE OF TEMPORARY CONSTRUCTION EASEMENTS
(AS SHOWN ON THIS PLAN) THAT AREDOWN -SLOPE
FROM THE CONSTRUCTION AREAS OR AS DIRECTED
BY THE ENGINEER.
b�
0
1
I
' 30 I 30
, I ,
I , i
i
5 4 3 2
jc-) -
I
Z i STORY ` \ _ \ \ \ \ \\
FRAME
FF =226
_ Mu /�� /`'
I%wpy(T \� \�� \Oa�q \NpI�oN'O /��_�f I
N
m
I
FILTER FABRIC FENCE
FILTER FABRIC -\
SAND BAGS FILLED \
WITH PEA GRAVEL
OR WASHED DRAIN ROCK.
1RIC
SANDBAG SEDIMENT DAM
SANDBAGS SHALL BE FILLED
WITH PEA GRAVEL OR WASHED
DRAIN ROCK.
SANDBAG SEDIMENT DAM
SHALL BE THE GREATER
OF } THE DEPTH OF
DITCH OR 1' DEEP (MIN.).
m
I
\\ �\�- Igo
Imo_ �C28�
27 I I zi IILTE ABR /C PENCE
SANDBAG SEDIMENT DAM �.
�I I i1 \\
\ BLDG 3 I
FF= 21;3'
SHOP \ `/\
I \ 2 J
I -- i° SHED GARAGE _.r X� III
\ —
- DRAIN
OHP—
I GA PPS..
b
;NO I4
BSOLUTELY TRESPASSING I
/STAKE
a 801
I
SANDBAG SEDIMENT DAM -
3
W
` ``I .Sj E 683 w I I p
o•
�EEpPE w` a�
W W`°
91
4
(
i
/-12" HIGH PRESSURE —
OLYMPIC GAS LINE
INDICATOR POST
a DRIVEWAY A
0
v
.....t.... GA
x-
P OHP- -OHP --
XMFR — —. — — —
FILTER FABRIC FENCE
V
I ,
I
I I
I
I � I
v W
W I I
ry^
_f
V wo
mm
o
I
myI I I I
I
I
m0
F
zm❑ ( ti
0
OAT DO
=
I
D
I
m
FILTER FABRIC FENCE
4
I ,
I
I I
I
I � I
v W
W I I