PAY LIMIT
TRENCH BACKFILL
6' -0" FOR 8 " -6" SEWER LINES
3' -0 FOR ALL WATER MAINS
SEE DETAIL FOR STREET
RESTORATION REQUIREMENTS
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF APPROVED BY ENGINEER)
OR IMPORT PER SECTION 9- 03.12(1)C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS.
PROPOSED 8" SEWER PIPE
PROPOSED 8" WATER PIPE
FOR SEWER PIPE: PIPE ZONE MATERIAL PER SECTION
9 -03.16 BEDDING MATERIAL FOR
FLEXIBLE PIPE.
FOR WATER PIPE: PIPE ZONE MATERIAL SHALL BE
NATIVE MATERIAL UNLESS DEAMED
UNSUITABLE BY THE ENGINEER,
THEN PIPE ZONE MATERIAL PER
SECTION 9- 06.13(3).
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL
(IF NECESSARY) DEPTH AS APPROVED
BY ENGINEER. MATERIAL SHALL MEET
SECTION 9- 03.9(1) BALLAST
8 " -6" C900 PVC & SDR 35 PVC SEWER PIPES
TYPICAL TRENCH BEDDING AND BACKFILL
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED.
5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS
BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM.
CONSTRUCTION SEQUENCING
1. ALL CONSTRUCTION, INCLUDING FINAL RESTORATION,
IN NE 16TH ST SHALL BE COMPLETED PRIOR TO
JULY 1, 2002.
2. ALL CONSTRUCTION AND FINAL RESTORATION OF EACH
STREET SEGMENT SHALL BE COMPLETED PRIOR TO
BEGINNING CONSTRUCTION ON THE NEXT STREET SEGMENT.
AN EXCEPTION WILL BE MADE IF THE CONTRACTOR USES
MORE THAN ONE CONSTRUCTION CREW. THE CONTRACTOR
MAY THEN BEGIN CONSTRUCTION ON A SECOND STREET
SEGMENT HOWEVER, ALL CONSTRUCTION ON THE FIRST
STREET SEGMENT SHALL BE COMPLETED PRIOR TO BEGINNING
C-NSTRUCTION ON A THIRD STREET SEGMENT.
� taiw�p- y�_ =9m
12"
TYP
TRENCH
(SEE DETAILS)
PAY LIMIT OF TRENCH
PATCH PAYMENT
ASPHALT CONCRETE PAVEMENT
RESTORATION DETAIL
NTS
SAWCUT FINAL JOINT
TYP. EACH SIDE
EXIST. ASPH. CONC. PAVEMENT, TYP.
3" CL 'B' ASPHALT CONCRETE PATCH
6" CRUSHED SURFACING TOP COURSE
BACKFILL
(SEE BEDDING /BACKFILL DETAIL)
NOTES:
1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED
PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY.
THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK.
2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND
THE UNDISTURBED EDGE OF THE TRENCH.
3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL
BE CONSIDERED INCIDENTIAL TO OTHER ITEMS OF WORK.
4. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED
WITHIN (2) WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA
UNLESS APPROVED BY THE ENGINEER.
ROADWAY RESTORATION STANDARDS
ROADWAY REBUILD: BLAINE AVE NE (1800 BLOCK TO NE 20TH ST), CAMAS AVE NE,
DAYTON AVE NE, MONTEREY CT NE AND MONTEREY AVE NE (2400 BLOCK)
REMOVE ALL EXISTING ASPHALT AND SUBSTANDARD SUBGRADE MATERIAL
AND REPLACE WITH 6" CRUSHED SURFACING TOP COURSE AND 4" OF
CLASS B ASPHALT CONCRETE PAVEMENT (TO BE DONE IN 2 -2" LIFTS).
ALL ROADWAYS SHALL HAVE A 2% CROWN WITH THE CENTERLINE
ELEVATIONS GOVERNED BY THE EXISTING GUTTER ELEVATIONS.
DAYTON AVE NE (NO EXISTING CURBS & GUTTERS) SHALL MATCH
PRECONSTRUCTION ELEVATIONS.
ASPHALT PATCH & OVERLAY: MONTEREY AVE NE (1600 BLOCK) AND EDMONDS AVE NE
PATCH UTILITY TRENCHES PER ASPHALT CONCRETE PAVEMENT
RESTORATION DETAIL AS SHOWN ON THIS SHEET.
THE CONTRACTOR SHALL PROVIDE CURB TO CURB ASPHALT
GRINDING WHERE THE NEW OVERLAY TRANSITIONS TO THE EXISTING
ASPHALT.
THE ASPHALT GRINDING DEPTH SHALL TRANSITON FROM 0 INCHES
TO 1 Y2 INCHES WITHIN 20 FEET.
MONTEREY AVE NE SHALL HAVE A 20 FOOT LONG, CURB TO CURB
GRIND AT THE SOUTH AND NORTH ENDS OF THE PROJECT AREA
AND AT THE TRANSITION TO NE 17TH PL.
EDMONDS AVE NE SHALL HAVE A 20 FOOT LONG, CURB TO CURB
GRIND AT THE SOUTH AND NORTH ENDS OF THE PROJECT AREA
AND A MINIMUM 6 FOOT LONG GRIND AT THE TRANSITION TO NE 25TH ST.
ASPHALT OVERLAY SHALL BE 1 -Y2" OF CL B ASPHALT AND BE FULL
STREET WIDTH TAPERING TO -Y4'• AT THE GUTTER.
ASPHALT PATCH: NE 16TH ST AND BLAINE AVE NE (NE 16TH ST TO 1800 BLOCK)
PATCH UTILITY TRENCHES PER ASPHALT CONCRETE PAVEMENT
RESTORATION DETAIL AS SHOWN ON THIS SHEET.
REVISION
..__PACE
AS SHOWN
JDH
o� JDH f�
DATUM
DlAC
CONSTRUCTION NOTES
1. CENTERLINE STATIONING IS BASED ON EXISTING CITY MONUMENTS
FOR ALL STREETS IN THIS PROJECT.
2. VERTICAL CONTROL DATUM BASED ON NAVD 1988 (IN FEET)
CITY BENCH MARK # 250: ELEV. = 307.11 FEET (93.606 METERS) TOP OF 1/4"
BRASS PLUG SET IN CONCRETE MONUMENT 4' EAST
OF CENTERLINE INTERSECTION OF ABERDEEN AVE NE.
AND NE 16TH ST.
CITY BENCH MARK If 71: ELEV. = 284.63 FEET (86.756 METERS) TOP OF ROUND
MONUMENT IN MONUMENT CASE 4' EAST OF AS -BUILT
INTERSECTION OF ABERDEEN AVE NE AND NE 12TH ST_
3. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE
CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES.
4. EXISTING PRIVATE IMPRO BddENTS S.':"..LL BE TEMPORARILY RELOCATED AND
PERMANENTLY REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION.
5. STATIONING SHOWN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES
AS DEFINED BY THE CONTROL POINTS.
6. ALL MANHOLES SHALL HAVE LOCKING LIDS.
7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS.
8. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS
OF MANHOLE AND SIDE SEWER VERTICAL AND HORIZONTAL LOCATIONS.
9. INSTALL SEWER MAIN AND SERVICES A MINIMUM 2' FROM PARALLEL GAS LINES
WHERE CONFLICT OCCURS.
10. ALL CEMENT CONCRETE DRIVEWAYS AND ALLEY APPROACHES SHALL BE 6"
THICK. (IN ACCORDANCE WITH STANDARD PLAN X006, DRAWING #FRO1N)_
11. REPLACE ALL DISTURBED CURB & GUTTERS IN ACCORDANCE WITH STANDARD
PLAN # F008, DRAWING # FRO5 AND STANDARD PLAN # F001 "CEMENT CONCRETE
CURB AND GUTTER_-
12. REPLACE ALL DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN
# F007, DRAWING # FRO2_
13_ WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT.
INSERT ETHAFOAM HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE
SEPARATION.
14. SIDE SEWERS SHALL HAVE A MINIMUM SLOPE OF 2% FROM THE SEWER MAIN
TO THE ADJACENT PROPERTY LINE. SIDE SEWERS SHALL BE 6' -8' DEEP AT
THE PROPERTY LINE UNLESS OTHERWISE NOTED ON THE CONSTRUCTION PLANS.
s
6 #
NORM
- \S�EOFWASH,H is
�P
Ep9 9 23169 Q
EOl, FGISTEPE
SS�ONAL E�1G
EXPIRES -7 _n
CITY OF
EAST KENNYDALE SANT ARY
JAN 2002
RENTON
SEWER INFILL PHASE 1
Planning /Building /Public Woks Deft.
S_9
c
X18
10
SCANNED SEP 13 2002
6 #