Loading...
HomeMy WebLinkAboutS-296301REVISIONS :REVISED PER C l i N OF RENTON COMMENTS :REVISED PER CITY OF RENTON COMMENTS :REVISED LOT GRADING PER CLEINT'S :REVISED LOT GRADING PER CLEINT'S AND REDLINES. 06 -04 -01 DJW AND REDLINES. 02 -22 -02 DJW REQUEST. 04 -24 -02 DJW REQUEST. 05 -20 -02 DJW 0 N U ' �w w65 O 1 / � Cn V J Q ~ _ W aw (1) W � 0 mo IL Z OOs � o �Z Q V W .P4! c vE -o ® crn c O� a� M 0 O CV -_ OIrn cl <1Mk S.E. 1/4, S.E. 1/4, SEC. 31, T. 23 N., R. 5 E., W.M. SSMH . #' ..... ..... .... RIM= 143.33 INV. 8 "(E)= 133.43(IN) INV. 8 "(w)= 133.33(ou r) 25.0' WIDE, ' SSMH f2 V RIM= 165.83 INV. 8 "(E)= 157.93(TN) INV. 8 "(w)= 157.83 (our) UIE I SCALE: 1" =20' 20 10 0 20 GRAPHIC SCALE VERTICAL DATUM: rl NAVD 88 (CITY OF RENTON) CONTOUR INTERVAL = 2' BENCHMARK= BASE: KING COUNTY SURVEY CONTROL POINT #F-10- FOUND BRASS DISC FLUSH WITH SIDEWALK 1.0' t WEST OF SIGNAL LIGHT POLE IN THE NORTHWEST QUADRANT OF STREET INTERSECTION OF TALBOT ROAD AND SOUTHWEST 43RD STREET- ELEVATION. 12126 FEET. NOTES: 1. CONTRACTOR TO MAINTAIN 5' MINIMUM CLEARANCE FROM GAS MAIN TO ALL OTHER MAINLINE UTILITIES- 2 ALL PRIVATE STORM PIPE SHALL BE ADS -N12 (OR EQUAL) UNLESS OTHERWISE NOTED ON THE PLANS 3 -ALL STORM INLETS SHALL BE PROTECTED DURING CONSTRUCTION PER THE TEMPORARY EROSION CONTROL PLAN. 4_ EXTS71NG UNDERGROUND UTILITIES IN TALBOT ROAD HAVE BEEN SHOWN FROM THE MOST CURRENT INFORMATION AVAILABLE IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL EXISTING UTILITIES, SHOWN OR NOT, PRIOR TO BEGINNING CONSTRUCTION. 5. SEE SHEET C2 FOR HORIZONTAL CONTROL. 6. MAINTAIN 5' CLEARANCE FROM DRIVEWAY APPROACHES TO ANY STREET LIGHT 7. SEE SHEET C14 FOR STANDARD NOTES. 8. SEE SHEET C6 FOR ROAD AND STORM DRAINAGE PROFILES 9. SEE SHEET C13 FOR OFF -SITE IMPROVEMENTS 70. ALL NEW ELECTRICAL, PHONE & CABLE SERVICES & LINES TO THE PLAT MUST BE UNDERGROUND. CONSTRUCTION OF THESE FRANCHISE UTILITIES MUST z BE INSPECTED & APPROVED BY A CITY OF RENTON PUBLIC WORKS INSPECTOR PRIOR TO RECORDING OF 0 THE FINAL PLAT Q 11 LOCATIONS FOR THESE UTILITIES WILL BE DESIGNED 0 BY THEIR RESPECTIVE PURVEYORS. IN GENERAL z REQUIRED UNDERGROUND CONDUIT AND PIPE, METERS F TRANSFORMERS, JUNCTION BOXES, ETC_, WILL BE z LOCATED IN LANDSCAPE AREAS, UNDER SIDEWALK OR IN PAVEMENT CORRIDORS WHICH WILL NOT O CONFLICT WITH PROPOSED WATER, SANITARY SEWER, U OR STORM DRAIN UTILITIES- ¢ OD 0 ALL WORK PERFORMED AND MATERIALS USED SHALL BE IN ACCORDANCE WITH CITY OF RENTON - STANDARD PLANS -, 1I.I w DATED 01127197. .w Sm-296301 am SANITARY SEWER MANHOLE E' NYC 8- .N -LINE CLEANOUT, u' au. 12' TEE W,/ CONCRETE BLOCKING 12' GATE VALVE 2' "-IP. — 12- CAP W/ CONCRETE BLOCKING WATER METER W/ SERVICE LINE EIRE HYDRANT. (12'x12 "x6" TEE, W/ CONC. BLKG., 6- GATE VALVE AND FIRE HYDRANT ASSEMBLY. P o�,`ur.►��GwT 6-�3 -�oz KAY 66 2003 Ln (Ij O OD IIi0) — > < OD O O Q 00 _.. 7✓ t IF STA. 0 +19.16, 23.9' RT. U)F0 cm Z ozoC115 (S. 53rd PLACE) STA. 1 +27.29, 18.9' LT. I (TALBOT ROAD S.) tou CONNECT TO _ - IN 8 (NE)'= 126- 08(7N) (N L _ ' 6 i^ � V�j UZI C4 O �v •r•! •r4 oaf ry� !� I I 2 -00 S.E. 1/4, S.E. 1/4, SEC. 31, T. 23 N., R. 5 E., W.M. SSMH . #' ..... ..... .... RIM= 143.33 INV. 8 "(E)= 133.43(IN) INV. 8 "(w)= 133.33(ou r) 25.0' WIDE, ' SSMH f2 V RIM= 165.83 INV. 8 "(E)= 157.93(TN) INV. 8 "(w)= 157.83 (our) UIE I SCALE: 1" =20' 20 10 0 20 GRAPHIC SCALE VERTICAL DATUM: rl NAVD 88 (CITY OF RENTON) CONTOUR INTERVAL = 2' BENCHMARK= BASE: KING COUNTY SURVEY CONTROL POINT #F-10- FOUND BRASS DISC FLUSH WITH SIDEWALK 1.0' t WEST OF SIGNAL LIGHT POLE IN THE NORTHWEST QUADRANT OF STREET INTERSECTION OF TALBOT ROAD AND SOUTHWEST 43RD STREET- ELEVATION. 12126 FEET. NOTES: 1. CONTRACTOR TO MAINTAIN 5' MINIMUM CLEARANCE FROM GAS MAIN TO ALL OTHER MAINLINE UTILITIES- 2 ALL PRIVATE STORM PIPE SHALL BE ADS -N12 (OR EQUAL) UNLESS OTHERWISE NOTED ON THE PLANS 3 -ALL STORM INLETS SHALL BE PROTECTED DURING CONSTRUCTION PER THE TEMPORARY EROSION CONTROL PLAN. 4_ EXTS71NG UNDERGROUND UTILITIES IN TALBOT ROAD HAVE BEEN SHOWN FROM THE MOST CURRENT INFORMATION AVAILABLE IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL EXISTING UTILITIES, SHOWN OR NOT, PRIOR TO BEGINNING CONSTRUCTION. 5. SEE SHEET C2 FOR HORIZONTAL CONTROL. 6. MAINTAIN 5' CLEARANCE FROM DRIVEWAY APPROACHES TO ANY STREET LIGHT 7. SEE SHEET C14 FOR STANDARD NOTES. 8. SEE SHEET C6 FOR ROAD AND STORM DRAINAGE PROFILES 9. SEE SHEET C13 FOR OFF -SITE IMPROVEMENTS 70. ALL NEW ELECTRICAL, PHONE & CABLE SERVICES & LINES TO THE PLAT MUST BE UNDERGROUND. CONSTRUCTION OF THESE FRANCHISE UTILITIES MUST z BE INSPECTED & APPROVED BY A CITY OF RENTON PUBLIC WORKS INSPECTOR PRIOR TO RECORDING OF 0 THE FINAL PLAT Q 11 LOCATIONS FOR THESE UTILITIES WILL BE DESIGNED 0 BY THEIR RESPECTIVE PURVEYORS. IN GENERAL z REQUIRED UNDERGROUND CONDUIT AND PIPE, METERS F TRANSFORMERS, JUNCTION BOXES, ETC_, WILL BE z LOCATED IN LANDSCAPE AREAS, UNDER SIDEWALK OR IN PAVEMENT CORRIDORS WHICH WILL NOT O CONFLICT WITH PROPOSED WATER, SANITARY SEWER, U OR STORM DRAIN UTILITIES- ¢ OD 0 ALL WORK PERFORMED AND MATERIALS USED SHALL BE IN ACCORDANCE WITH CITY OF RENTON - STANDARD PLANS -, 1I.I w DATED 01127197. .w Sm-296301 am SANITARY SEWER MANHOLE E' NYC 8- .N -LINE CLEANOUT, u' au. 12' TEE W,/ CONCRETE BLOCKING 12' GATE VALVE 2' "-IP. — 12- CAP W/ CONCRETE BLOCKING WATER METER W/ SERVICE LINE EIRE HYDRANT. (12'x12 "x6" TEE, W/ CONC. BLKG., 6- GATE VALVE AND FIRE HYDRANT ASSEMBLY. P o�,`ur.►��GwT 6-�3 -�oz KAY 66 2003 Ln (Ij O OD IIi0) — > < OD O O Q 00 D 1w zZto J0thC'l U)F0 cm Z ozoC115 m0 tou Y V • � to UZI C4 O �v •r•! •r4 z: bo ry� !� > r. U r. 3 0 LUUJ Q I O 1 D I N a: D U O -1 X _J E �o V €L N rO Q W W HA W w (3) Mmom mul ' d - W WW <@ -J>3:0 Z p�K ul 2 Oc0v Q0� �f IL 3�ca,��. PROJECT NO.: 98-48 ISSUEV DATE: 04 -02-01 SHEET REV.: 05-20-OZ SANITARY SEWER (WES"T HALF OF SITE) SHEET 7 OF 20 9B 4a� SCANNED $FD ^ I"? _e 1! t' V 1