HomeMy WebLinkAboutS-296706�a
I U)
n r) z
v
w
o0
z
Fy Q CD
Qf z
mw
d
-j V) °
G = S
D- Tr
O
Q
O
ry
wz
E O C
o
r �Y
z
S
1- H O
B
i 5 - SUILT 1-20'63
4CK D.
� WAS1IiyrY � L�
�XO�a�s 9-lf-o3 k
O
o
d
o
Pte.
Z
O
a
� �
a
�
�
3
NT 75 +65.36 SE ST
= 1 +00-0p HARRIN ON AVE SE
� N
'o
203
°
B
.
No
NU
W
2�0
4_
=220 1
�
1
zW
- Z
ww�- ja -:qs7
_.. - -
II
i
W�
ROLL 178
PORTIONS SEC. 16, TWP. 23 N., RGE. 5 E., W.M.
FR 334
30� C f
TRIAD
aZ m
nssoclATSS
I11814 1ftA—NE
IQM-d, WA 980345 3
425.821.8448
_ 425.521 -3481 fbx - -
800 - 488.0756 tol free .
— t -dessae mm
!
ZI
SCALE: 1" = 40' O
0 20 40 80 ('$
Z f
UJ
2 j
NO7E? REFER TO LIBERTY RIDGE '$ o D
PHASE III AND POR77ONS OF ® o
PHASE 1VA CONS7RUC77ON PLAN
SET FOR EXIS77NG SANITARY SEWER Lu �' -Q Z
cc 47
INFORMA770N. W Z 3
y = m
N07E' ALL EXIS77NG INFORMATION a z m
FOR ER! SSMH s WAS PRONDED
BY RINGEL AND ASSOCIATES cc cc v
~ y
uj
NO7E.- ALL EXIS77NG TOPOGRAPHY °� y -cc 1
PROVIDED BY M.A. SEGAL& INC.
AND RINGEL AND ASSOC/A7FS y
W
INOM ALL PROPOSED SSMH S SHALL
BE 4810 UNLESS 0774ERMSE INDICATED Q
HORIZONTAL DATUM: NAD 7983/1991 V
BASIS OF BEARINGS HELD BEARING OF N0105'10 E BETWEEN THE
NORTHWEST CORNER OF SEC77ON 16, TWN. 23N., RGE. 5E., W.M., (CITY
OF RENTON MON. 012) AND THE WEST QUARTER CORNER MONUMENT
OF SAID SEC77ON 16. THE BEARING IS DERIVED FROM STATE PLANE
COORDINATES FOUND IN THE CITY OF RENTON SURVEY CONTROL g g
NETWORK AND CORROBORATED BY VARIOUS RECORD OF SURVEYS IN
THE IMMEDIATE AREA.
VERTICAL DATUM.- NAVD 1988 Z
BENCHMARKS p.
ORIGINA77NG BENCHMARK, GTY OF RENTON AONUME. °.? x`612 - TOP
OF MONUMENT IN CASE. ELEVA77ON 260.068.' a
..m
BENCHMARK ¢7 - X- IN SIDEWALK AT SE. QUADRANT OF O
INTERSECTION OF N.E. 3RD ST AND EDMONDS AVE. N.E. ELEVATON
27248.'
BENCHMARK 42 - TOP OF MONUMENT AT THE WEST QUARTER CORNER
OF SEC7701V 16 7WN. 23N., RGEE, 5E, W.M. ELEVATION 312.80.' y, Z 5
q D>
BENCHMARK 13 - TOP OF 1 -7/4" REBAR AT THE NORTHWEST SIDE _
OF A SET OF 6 POWER POLES BETWEEN TWO (2) RETENRONI
DE7EN710N PONDS APPROXIMATELY 950' EAST OF WEST QUARTER y N
CORNER OF SEC77ON 16. ELEVA770M 259.77' z
i td �o
DONALD d HILL PE r
PROJECT MANAGER
2 BRADLEY T. FREE79MMAN, PLS
' -F PROJECT SURVEYOR
aAY A. LOWX PE
I dY
PROJECT ENGINEER
�f I C
o
PROJECT LANDSCAPE ARCHITECT
FUN SUBMITTAL DATE: 1129102
SCALE: eoFn.:I =40' vw.:?• -4•
I
A. L00
o�w °� waeyryrm
z
w IJ
d, BCISTS6�G�
BTONAI,
EXPIRES: 10/22/04
S�Z��OZ Z
Checked for Compliance to City Standards STAMP NOT VALID z G1
UNLESS SIGNED AND DATED
S
JOB NO.
00-02211
SHEET N0.
17OF 30 �
8
02002 TRIAD ASSOCIATES L U A 0 10,112, 3
r: - %%617 06 SCANNED MAR 2 8 2003
i
Pte.
,t
EX. SS MH 402 204
NT 75 +65.36 SE ST
= 1 +00-0p HARRIN ON AVE SE
203
.
2�0
4_
=220 1
�
1
TRACT X
N. &P. A.
FR 334
30� C f
TRIAD
aZ m
nssoclATSS
I11814 1ftA—NE
IQM-d, WA 980345 3
425.821.8448
_ 425.521 -3481 fbx - -
800 - 488.0756 tol free .
— t -dessae mm
!
ZI
SCALE: 1" = 40' O
0 20 40 80 ('$
Z f
UJ
2 j
NO7E? REFER TO LIBERTY RIDGE '$ o D
PHASE III AND POR77ONS OF ® o
PHASE 1VA CONS7RUC77ON PLAN
SET FOR EXIS77NG SANITARY SEWER Lu �' -Q Z
cc 47
INFORMA770N. W Z 3
y = m
N07E' ALL EXIS77NG INFORMATION a z m
FOR ER! SSMH s WAS PRONDED
BY RINGEL AND ASSOCIATES cc cc v
~ y
uj
NO7E.- ALL EXIS77NG TOPOGRAPHY °� y -cc 1
PROVIDED BY M.A. SEGAL& INC.
AND RINGEL AND ASSOC/A7FS y
W
INOM ALL PROPOSED SSMH S SHALL
BE 4810 UNLESS 0774ERMSE INDICATED Q
HORIZONTAL DATUM: NAD 7983/1991 V
BASIS OF BEARINGS HELD BEARING OF N0105'10 E BETWEEN THE
NORTHWEST CORNER OF SEC77ON 16, TWN. 23N., RGE. 5E., W.M., (CITY
OF RENTON MON. 012) AND THE WEST QUARTER CORNER MONUMENT
OF SAID SEC77ON 16. THE BEARING IS DERIVED FROM STATE PLANE
COORDINATES FOUND IN THE CITY OF RENTON SURVEY CONTROL g g
NETWORK AND CORROBORATED BY VARIOUS RECORD OF SURVEYS IN
THE IMMEDIATE AREA.
VERTICAL DATUM.- NAVD 1988 Z
BENCHMARKS p.
ORIGINA77NG BENCHMARK, GTY OF RENTON AONUME. °.? x`612 - TOP
OF MONUMENT IN CASE. ELEVA77ON 260.068.' a
..m
BENCHMARK ¢7 - X- IN SIDEWALK AT SE. QUADRANT OF O
INTERSECTION OF N.E. 3RD ST AND EDMONDS AVE. N.E. ELEVATON
27248.'
BENCHMARK 42 - TOP OF MONUMENT AT THE WEST QUARTER CORNER
OF SEC7701V 16 7WN. 23N., RGEE, 5E, W.M. ELEVATION 312.80.' y, Z 5
q D>
BENCHMARK 13 - TOP OF 1 -7/4" REBAR AT THE NORTHWEST SIDE _
OF A SET OF 6 POWER POLES BETWEEN TWO (2) RETENRONI
DE7EN710N PONDS APPROXIMATELY 950' EAST OF WEST QUARTER y N
CORNER OF SEC77ON 16. ELEVA770M 259.77' z
i td �o
DONALD d HILL PE r
PROJECT MANAGER
2 BRADLEY T. FREE79MMAN, PLS
' -F PROJECT SURVEYOR
aAY A. LOWX PE
I dY
PROJECT ENGINEER
�f I C
o
PROJECT LANDSCAPE ARCHITECT
FUN SUBMITTAL DATE: 1129102
SCALE: eoFn.:I =40' vw.:?• -4•
I
A. L00
o�w °� waeyryrm
z
w IJ
d, BCISTS6�G�
BTONAI,
EXPIRES: 10/22/04
S�Z��OZ Z
Checked for Compliance to City Standards STAMP NOT VALID z G1
UNLESS SIGNED AND DATED
S
JOB NO.
00-02211
SHEET N0.
17OF 30 �
8
02002 TRIAD ASSOCIATES L U A 0 10,112, 3
r: - %%617 06 SCANNED MAR 2 8 2003
i