Loading...
HomeMy WebLinkAboutS-298603CURVE DATA IL 34 °48'45" R 355.000 L 215.696 T 111.293 PI STATION 1 +469.67 PI COORD. N. 401788.945 E. 53013.120 I�Ix FIELD BOOK: SURVEYED: SURVEY BASE MAP_ DESIGN ENTERED:_ DESIGNED VAND CHECKED: GOTZ O (V 2 H-� Q N fn W Z J T U H Q 40 39 38 37 0 In N 36 2 e} 35 Q 34 to w Z J 33 = — U t— Q 32 Q Q �JJ U 100 YR. FLOOD Eli. 31.9 31 I 30 I � ! I .ORDINARY HIGH WATER EL. 29 SEC.23, T.23 N., R.5 E., W.M. cq i Rxo so 1 \ o \ � I / ( a °l \ RAW PL. S.E. (/ ( R W � CKS !—CO•NC ` LO % gt _ -� _ / SSM �4 Y I I PROPOSED STORM STA 1 X336 \ II� DRAIN (TYP) 1.1 �2T SSMH #3 ! 00 — IiIl4' STA. 1 +316.0 1.1m RT 50 SSMH s — toi z 1'f ET 148 SHEETS B HAROLD TANIG DIRECTOR f 2002 Penhallegon Associates K NC. PROJECT No. 401288 s ®UCHI, �+ ELLIOTT BRIDGE # 3166 TES IURG 2002 Consulting Engineers, Inc. E„9 P. su ey 800 FIFTH AVENUE SUITE 3800 SURVEY No. 23- 23 -5 -23 $ aola �13T88� BRIDGE REPLACEMENT PROJECT ee <rg y ieoi za .E.,e s�« iaoa SEATTLE, WASHINGTONslOAI<1L' 2003 cH- 4a' ass 1-300 945 -8aoe 98104 -3122 TEL: 206.340.2255 �,.. CC`A /Cp PLAN SEWER (zos; ...... FAX: 206.340.2266 MAINTENANCE DIVISION No. 4 EXPIRES 4/4/ %1 DATE REVISION BY DATE Kirkland- Seatfle- Federal Way- POrl /antl A3:5 20L.0o6 SI s � �_p .ty 7777, w ra J 5 y ET 148 SHEETS