Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutS-299322s
I
II
i
I
I
I
CJ
I
r
sI
1
m'
a
o'
c�n
h1
l01
I
QI
0,1
nl
I
I
UI
W�
O
a
n
�a
Q
o
C'7
J C"J
v
z
N C
W �
Q
of
N
WATER MAIN
W
Ln
''
M
W
a s
J
J
`,.c
PLUG (M,I)
W;'2" TAP &
BLOW-OFF ASSY.
c°
=o
m E
U
CL
o�
V
W
-
zio
-- r
© w
(�
►-
'c-a -r--
+ -
J
Q
o W --__
WATER CROSSING
o z
P
�'�. PROPOSED GROUND
I.E. - 199.16
z
z........
r
200
1
-204 - -�-- r-
I
. . . . . . ...... ........... lz
i
SS CROSSING
!
r
I.E. = 196.21
.
- - -
I
X11
WATER CROSSING
I.E. - 198.99
s �- - _..._ _
;
SS CROSSING I I
-_. 191.90 .
►6''1
.
O O
N NI
dl
cl
N
C„�1
N
N• NI I
s
I
II
i
I
I
I
CJ
I
r
sI
1
m'
a
o'
c�n
h1
l01
I
QI
0,1
nl
I
I
UI
W�
O
a
n
�a
Q
1w 0.4
L.
CL
v
z
N C
12" D.I.
Q
of
N
WATER MAIN
N
W
a s
J
J
`,.c
PLUG (M,I)
W;'2" TAP &
BLOW-OFF ASSY.
c°
=o
m E
c
c
•c cp
c
o�
V
s
I
II
i
I
I
I
CJ
I
r
sI
1
m'
a
o'
c�n
h1
l01
I
QI
0,1
nl
I
I
UI
W�
O
a
n
�a
Q
1w 0.4
TO ALLOW FOR
FINISHED CONNECTION TO EXISTIN(= MAIN
EXISTING
12" D.I.
Cl
w
WATER MAIN
TEMPORARY 12"
J
J
�
PLUG (M,I)
W;'2" TAP &
BLOW-OFF ASSY.
J �
Z
Q _ z
L-21s P
LE
L)
w`
NONE
qr� + 00 41 + r10 42+00 43 +00
PROFILE - ALIGNMENT 'E'
SCALE: 1 " = 20' (H.), 1 " = 5' (V.)
230
o Z Fx1'_,TING GROUND
Z PROPOSED GROUND
r�l
r-
�z
d. w
ri Z
to Q
Z
I � 1
220 220
- -
____- = ? •� i - -f__
WATER CROSSING ! O
I. E. = 212.83 WATER CROSSING
I.E. = 216.99
,
SS CROSSING
. E. = 213.12
X10-------- -- -..__. _.__.. . _ _..__. _ _ 10
SS CROSSING
N�
N�
50 +00
EXISTING 12" D.I. WA_
CONCRETE BLOCKING
�i
I.E. - 212.36
rn.
6
CV;
rn
N N CJ N
51+00 52+00 53 +00
PROFILE - ALIGNMENT 'F'
SCALE: 1 " = 20' (H.), 1 " = 5' (V.)
f-- 12 "02" TAPPING TEF (MJxFL)
le)" nnrr ',iwi %ir- /ri .. 1\
� • s.. � �v V J `Ir, v 1
PLUG W/2" TAP 8c 2" PLUG (M,I)
WATER MAIN TAP
NTS
it D.I. MAIN
RIDLL.2 01,2
I
l ..
I
SANITARY SEWER NOTES
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE TO THE CITY OF
RENTON STANDARDS FOR MUNICIPAL CONSTRUCTION AND THE LATEST
EDITION OF THE WSDOTXAPWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT -OF --WAY SHALL BE
LIMITED TO 8:30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC
WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE
DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL CONSTRUCTION SHALL BE ACCORDANCE WITH "STANDARD
SPECIFICA-
TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY
WASH-
INGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION,
LATEST EDITION (APWA) AND CITY OF RENTON STANDARD
SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE
AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR
DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL
BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY
PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE
ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS
AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS
AND OTHERS ON THE CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS
DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER
CON-
STRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN
AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN
STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR
LICENSED PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE
PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES,
MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO
95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST
EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO
THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER
PIPE SHALL BE THE SAME AS DESCRIBED.
12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING
TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND
ME-
CHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL
BE NEAT LINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY
MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND
COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN
10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR
OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT
FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION
OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PREPARED
FOUN-
DATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT
STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CON-
STRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE
TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL
AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC)
RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS
50.
17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND TO MINiMUM 6
INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED
AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
NEW 12" D.I. MAIN 18. ALL PIPES (MAIN AND SIDE SEWER) WITH MORE THAN 15 FEET OF
COVER SHALL BE C900 OR DUCTILE IRON, CLASS 50.
RECOMMENDED
FOR APPROVAL
BY
BY
� BY
12" VERTICAL CROSS (MA AS -BUILT SET
2 12" PLUGS (M,J) -J
TOP PLUG W;'2" TAP & 2" PLUG (M,1) UNDERGROUND PIPE LOCATION BASED ON SURFACE FEATURES.
ACTUAL LOCATION MAY VARY.
I CONFIRM THAT THE LOCATIONS, ELEVATIONS, DEPTHS, AND AS -BUILT
COMMENTS REFLECTING MATERIALS ACTUALLLY USED DURING
TESTING DETAIL CONSTRUCTION, ACCURATELY REFLECTS EXISTING FIELD CONDITIONS AS
P.
NTS DETERMIN � jo_� � OR UNDER MY DIRECT SUPERVISION ON THIS
DATE:_
FR 19 7.,
�v \ N L . p�
A 5► ' _ �ti�
x
132 4 J
F o�
ss -
NA L 1����
ExPIRES 9 JAN 2006
StAW NOT wino wwESS SIGNED & ()ATM
DALEY- MORROW- POBLETE, INC.
r 726 AUBURN AA' N.
AUBURN, WASHINGTON 98002
HONE: (253) 333 -2200; FAX: (253) 333 -2206
l
ENGINEERING - SURVEYING
LAND PLANNING
i►'1COr•�prtat�d
oQa• 4✓- 299323 <!S z t 9 .32 Z) SCANNED MAY 0 12006
I*
r
2
4
SUFFICIENT DISTANCE
TO ALLOW FOR
FINISHED CONNECTION TO EXISTIN(= MAIN
EXISTING
12" D.I.
WATER MAIN
TEMPORARY 12"
TEMPORARY
CONCRETE
BLOCKING
I
�
PLUG (M,I)
W;'2" TAP &
BLOW-OFF ASSY.
I
SANITARY SEWER NOTES
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE TO THE CITY OF
RENTON STANDARDS FOR MUNICIPAL CONSTRUCTION AND THE LATEST
EDITION OF THE WSDOTXAPWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT -OF --WAY SHALL BE
LIMITED TO 8:30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC
WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE
DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL CONSTRUCTION SHALL BE ACCORDANCE WITH "STANDARD
SPECIFICA-
TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY
WASH-
INGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION,
LATEST EDITION (APWA) AND CITY OF RENTON STANDARD
SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE
AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR
DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL
BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY
PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE
ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS
AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS
AND OTHERS ON THE CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS
DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER
CON-
STRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN
AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN
STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR
LICENSED PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE
PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES,
MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO
95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST
EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO
THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER
PIPE SHALL BE THE SAME AS DESCRIBED.
12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING
TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND
ME-
CHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL
BE NEAT LINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY
MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND
COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN
10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR
OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT
FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION
OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PREPARED
FOUN-
DATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT
STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CON-
STRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE
TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL
AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC)
RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS
50.
17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND TO MINiMUM 6
INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED
AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
NEW 12" D.I. MAIN 18. ALL PIPES (MAIN AND SIDE SEWER) WITH MORE THAN 15 FEET OF
COVER SHALL BE C900 OR DUCTILE IRON, CLASS 50.
RECOMMENDED
FOR APPROVAL
BY
BY
� BY
12" VERTICAL CROSS (MA AS -BUILT SET
2 12" PLUGS (M,J) -J
TOP PLUG W;'2" TAP & 2" PLUG (M,1) UNDERGROUND PIPE LOCATION BASED ON SURFACE FEATURES.
ACTUAL LOCATION MAY VARY.
I CONFIRM THAT THE LOCATIONS, ELEVATIONS, DEPTHS, AND AS -BUILT
COMMENTS REFLECTING MATERIALS ACTUALLLY USED DURING
TESTING DETAIL CONSTRUCTION, ACCURATELY REFLECTS EXISTING FIELD CONDITIONS AS
P.
NTS DETERMIN � jo_� � OR UNDER MY DIRECT SUPERVISION ON THIS
DATE:_
FR 19 7.,
�v \ N L . p�
A 5► ' _ �ti�
x
132 4 J
F o�
ss -
NA L 1����
ExPIRES 9 JAN 2006
StAW NOT wino wwESS SIGNED & ()ATM
DALEY- MORROW- POBLETE, INC.
r 726 AUBURN AA' N.
AUBURN, WASHINGTON 98002
HONE: (253) 333 -2200; FAX: (253) 333 -2206
l
ENGINEERING - SURVEYING
LAND PLANNING
i►'1COr•�prtat�d
oQa• 4✓- 299323 <!S z t 9 .32 Z) SCANNED MAY 0 12006
I*
r
2
4