Loading...
HomeMy WebLinkAboutS-2997044 I �a Q LL U a� or w z L E­ a �z °- a I+l W E at �E \°5.Ei E om FL AS -BUILT SANITARY SEWER PROFILES AND COSNTRUCTI ®N DETAILS e 1 24" x 6" FRAME AND LOCKING LID PER DRAWING BR29. = I O PRECAST VALVE CHAMBER CONE ADAPTOR COLLAR R.C.P. OR EQUAL ` RUBBER GASKET PIPER 12" i• � D • •b �! AS INDICATED - HT. 1/8" E N El Cl POURED IN PLACE BASE fIATE REVISION _ BY PR .0 p 1/2" p 13 p L TRE3K* O AND E(CAVATION; ALL TRENCHM AND 800AWA MON WORK IN .m.._cw_ arm CLEAN CAP GE VIFN CONTA NATED SOILS) SHALL BE N STRICT CONFORMANCE WTIH PART 2 OF THE PROJECT MANLIAL ENTFFLED IWARONMENTAL COlIDTITONJS' AND WITH THE OEOTECHNCAL REPORT BY HART CROIASM DATED VS /0?, NO EXCEFnoL WLa BE _lONffX O Z BACKFLL' N ALL BACKFLL WORK AND MATERIALS ASSOCIATED WrrH ALL ai TRENCH M AND EXCAVATION WORK SHALL BE IN STRICT CONFORMANCE WITH PART 2 OF THE PROJECT 1AAIdUAL ENTITLED 'ENWIRON ENTAL CONDITDNB AND WITH THE GEOTECHNIC& REPORT BY HART CROWe DATE-- WwnL ALL BACK FILLED TF 34CHYO AND LARGE EXCAVATION AREAS WILL BE LNED WITH( A PEiVKX13 OEOTEXTL.E FABRIC (Y MM TO DELIF.ATE CLEAN BAC139LL MATER& FROM EXIS M CONTANINATED SOUL .j7_ 4000 16 A­ _ SANITARY MANHOLE EXTRA SHALLOW TYPE C ® ADOPTED L4f Mi$12/l5/91 DWG. NAME BR38 SP PAGE B073 3/4" SQUARES SPACED - 3/4•' �! AS INDICATED - HT. 1/8" E N El Cl .0 p 1/2" p 13 p V CONCRETE p. p p 1q M CLASS 3000 i N RAISE- 1 /2 "— •_a /•_ WIDE BORDER 12" 9 °o t^ 0 a LZ FIBER JOINT urn 9" PACKING z -�/e" i•• 4T (1/8) BEND EY• rl CAST IRON RING AND COVER o� PIPE MATERIAL AS SPECIFIED BY THE ENGINEER PLUG TO BE SEALED 6 INCH OR B INCH CLEAN -OUF IN SAME MANNER AS MAIN SEVER JOINTS. ADOPTED 9hodW piw LRL )11$ 12/15/91 GATE REVISION i BY IAPPR DWG- NAME BW18B SP PAGE 8076 pm F t: - OL L 9 F LL o Zo zo F Q � co 0 d Ir a0 � Rr 14 r ,-N U� LL, 8 U�3n g aIL ai D o N <Zm W Z r I ® Yc O O o c N Y N N yp `s g P 3 v v g N yz °a fA N Dd z N S ca U V) sN W d o w l W Z ¢.O N ONO Z¢ _ �WtNO OD �� hI I Z (7 r� LL7 CTZ u') N N �- NZNN ° Y�tv )N N °.3N/ �6 Z W O ?��Ot• WASy /yc�� � ff GO 'AB' O0NffI M1C1® CERIIFICAMM H 4 1- HERESY CEffn Y THAT THE HORIZONTAL AND VERTICAL LOrAMONS OF SANITARY SEWER AWA. 9O'`f PfsI STER4��`"�" E N S -STORM DRAINAGE SYSTF]6 HORIZONTAL `TS G� z N LOCATION OF WATER SYSTEW APPLIRTENANCE5 SHOWN /ORAL E� '. O rn - HEREON ISTHE RESULT rOFSLRVEY EXPIRES 8 23 O5. PERFORMED. BY M RECTION. NIS J. L %q ° St SCANNED , OR $ 9 2 �! E N V a M i 0 °o 0 a LZ %q ° St SCANNED , OR $ 9 2