Loading...
HomeMy WebLinkAboutR-269267N 0) to A EXISTING ^4 `,ON -HAVEN COCONUT MATTING GROUND TRACK WALKFSUR ACE EXCAVATE AND — DISPOSE OF EMBANKMENT PER SOIL MATERIALS PLAN PREPARED BY OTHERS APPLY UPLAND SHRUB MIX SEE SHT DL l—.; NOW CONFIRM UM11 VJRH ROADWAY SECTION APPROX NB405, 1224+00 TO 1227+00, 80-300' RIGHT CIVIC DUMP SLOPE DETAIL NTB - NO SLOPE ROUNDING OUTCROPPING (TYP.) APPROX E405, 1214+00 TO 1224+00, 100-220' RIGHT ROCK OUTCROPPING NTS 1405 Ow' F uldem '0 to RELEASED FOR CON8TRUCTION cnNRTPIIDTIMJ NOTER I, EXPOSE EXCAVATED ROCK OUTCROPPINGS FOR VISUAL INTEREST AND SLOPE STABILIZATION. 2. LIMIT ROCK OUTCROPPINGS TO LESS THAN 60% OF CUT SLOPE AREA 0. NO ROCK OUTCROPPINGS IN THE CLEAR ZONE. 4, ARRANGE ROCK OUTCROPPINGS IN AN IRREGULAR DIAMOND PATTERN, EMPHASIANG LOWER SLOPE POSITIONS WHERE ROCK IS LIKELY TO BE COMPETENT 5. REMOVE ROCK OUTCROPPINGS THAT POSE A RISK TO FAILING. 6, FINAL SHAPE OF ROCK OUTCROPPINGS TO BE FIELD -DETERMINED AND ACCOUNT FOR VISUAL AND GEOTECHNICAL CONSIDERATIONS. 7, PROVIDE PLANTING POCKETS ABOVE OUTCROPPINGS,AS POSSIBLE. i o o o NO. ISSUE DATE ISSUE RECORD -DESCRIPTION I DESIGNED BY ENTERED BY CHECKED BY ID£BIGN MANAf J. U.. . i/\ l( I,II-5 fI Illllv7ANIF \, sxnec c tl,o. mR I. �. I I I. .. Washington State Department of Transportation 1105 TO SR 169 STAGE 2 - WIDENING AND SR 516 INTERCHANGE DLS-Q-O: to wnml TASK LEAo: xeuvER l.�'!.M�G W ,Zj7 m xfl y 6 G24 1 ONFM RELEASED FOR COP41MUQN -3L B. IMCEA PACKAGE: - 31. 0 GBIi!!09 NEt£ASEO FOR CON9TROCibN � M B OEflOBA ROADSIDE RESTORATION DETAILS �RFC