HomeMy WebLinkAboutR-295303A I e I ID 1 E
co
M
N
CONCRETE CLEAN —OUT
N (DISPOSE OF OFF —SITE)
C
� r
9
I
A
cto 5
2" SCHEDULE 40
a —2 3
I
2% SLOPE 5:1 SLOPE 5:1 SLOPE 2% SLOPE
1:1 SLOPE
8 A
cto
ENTRY ENTRY
TRANSITION 1 10' 1 20' 1 10' I TRANSITION
7
ELEVATION VIEW
WATER LEVEL
PUMP TO HOLDING 18'
TANK FOR TREATMENT
AND RECYCLE
6 2'
12' \_1: 1 SLOPE
4" QUARRY
SPALL, 12" DEEP
SECTION A 0
5 N "T.S. —
NOTES:
1. ASPHALT CONSTRUCTION ENTRANCE 6 ". ASPHALT TREATED BASE
(ATB).
4 2. 3" TRASH PUMP WITH FLOATS ON THE SUCTION HOSE.
3. MIDPOINT SPRAY NOZZLES, IF NEEDED.
4. 6" SEWER PIPE WITH BUTTERFLY VALVES. BOTTOM ONE IS A DRAIN.
LOCATE TOP PIPE'S INVERT 1 FOOT ABOVE BOTTOM OF WHEEL WASH.
5. 8' X 8' SUMP WITH 5' OF CATCH. BUILT SO CAN BE CLEANED WITH
TRACKHOE.
3 6° ASPHALT CURB ON THE LOW ROAD SIDE TO DIRECT WATER BACK TO
POND.
7. 6" SLEEVE UNDER ROAD.
8• BALL VALVES.
9. 15' ATB APRON TO PROTECT GROUND FROM SPLASHING WATER.
2 10. REMOVE ACCUMULATED SEDIMENT ON A REGULAR BASIS
2 RECORD DRAWINGS
1 CHANGE PER ADDENDA
1 ISSUED FOR CONSTRUCTION
N0. REVISION
A I B
TRUCK WASH DOWN AREA
DETAIL
NTS C8
F I
G I
H I I
REVISION No.
3'— 4'
/P
���� •.
ADJACENT
STRAW ROLLS MUST
C10-
ROLLS SHALL
BE PLACED ALONG
SLOPE CONTOURS
\
\ ` TIGHTLY ABUT
IF NOT ONE INCH
5' -10'
SPACING \ 4
DEPENDS ON 1
SOIL TYPE \ SEDIMENT, ORGANIC MATTER,
AND SLOPE % AND NATIVE SEEDS ARE
STEEPNESS CAPTURED BEHIND THE
ROLLS.
GRADE CATCH
CART PATH —SLOPE VARIES
�O
3 " -5" (75- 125mm)
8 " -10"
(200- 250mm)
1" X 1" STAKE
(25 x 25mm)
NOTE:
1• STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND
SECURE STAKING OF THE ROLL IN A TRENCH, 3 " -5"
(75- 125mm) DEEP, DUG ON CONTOUR. RUNOFF MUST NOT BE
ALLUWLU TO RUN UNDER OR AROUND ROLL.
2O RESTORE IMMEDIATLY UPON COMPLETION OF GRADING ACTIVITIES.
STRAP WATTLES
DETAIL z
NITS TYP.
8" CHAIN LINK FENCE
W /VIEW SCREEN SLATS SET
SILT FENCE IN CONCRETE.
W/ ORANGE
BARRIER
STORM COLLECTION
SUMP 24"0 CMP 2"0
HOLES W /FILTER SOCK
AND GRAVEL.
PUMP TO
VAULT #2
2% SLOPE
2% SLOPE
0 2" ATB.
6" CSTC.
4" ATB. 2' SHOULDER
6" CSTC.
8" BASE
EXISTING IRRIGATION LINES ASPHALT TREATED BASE A
DEPTH AND LOCATION VARIES SECT. 4 -06, 9.03.6 STD SPEC.
— CONTRACTOR SHALL CSTC= J4 "MINUS, 9.03.6(3) STD SPEC.
VERIFY REF. IRRIGATION AND BASE= 14 MINUS, 9.03.6(3)STD SPEC.
DEMOLITION DRAWINGS.
TEMPORARY ROAD AND CART PATH
DETAIL B
SCALE: t° = 5' C7
21' -0"
20 MIL PVC LIN
SURVEYED: —
SCALE: AS SHOWN
DESIGNED: J.E.
REVISION No.
DRAWN: R.B.
/P
ONE�
CHECKED: G.P.
CONTRACTOR MAY PROPOSE 50MIL. PVC
C10-
APPROVED: —
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
BY I DATE I APPR
C I D E
J
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
K I L M I N G I P —
12„ \ \ \
6" 6" (150mm)
(150mm) TERMINAL SLOPE AND CHANNEL
LONGITUDINAL ANCHOR TRENCV ANCHOR TRENCH
V NOTES:
x � �
�y CHECK SLOTS TO BE CONSTRUCTED PER
y� STAKE AT 3' -5' 1. MANUFACTURERS SPECIFICATIONS.
STAKING OR STAPLING LAYOUT PER
CHECK SLOT AT 25' (7.6m) INTERVALS
ISOMETRIC VIEW
P P
6" (150mm)
I G'
12"
0
0
7
6„ (150mm) 6
INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT
EROSION BLANKETS &
TURF REINFORCEMENT MATS R=2'95-303 SLOPE INSTALLATION
DETAIL 3 5
NITS TYP. _..
EXISTING HILLSIDE
DEWATERING
P P P
SUMP I I I 4
SITE STORM
WATER
18 STORM EXISTING POND 3
OUTFALL .±
SUMP VAULT #2 TEMPORARY 24" TEMP
CONSTRUCTION COLLECTION CMP RISER
SETTLING POND POINT
CONSTRUCTION RECORD DRAWING NOTICE
* ALL COMPONENTS TO BE SUPPLIED, INSTALLED AND These record drawings have been prepared based upon 2
MAINTAINED BY CONTRACTOR AS REQUIRED BY SITE information contained in addenda, change orders, or
CONDITIONS. re. 02270 other available construction information, and information
provided by the Contractor, and by others. HDR has not
CONSTRUCTION STORM WATER CONTROL SCHEMATIC verified the accuracy s completeness the information
provided to it and does not warrant the accuracy or
completeness of these record drawings. Users of this
DETAILK4 information shall be solely responsible to verify any and
NTS C8 all information represented. herein prior to any such use
of the information.
CITY OF RENTON
ECONOMIC AND ENGINEERING u Planning /Building /Public works Dept
Kennedy /Jenks SERVICES, INC.
Consultants 10900 10900 NE 4TH STREET, SUITE 1110 WATER TREATMENT AND GOLF COURSE IMPROVEMENTS
32001 32nd Ave. S., Suite 100 BELLEVUE, WASHINGTON 98004
Federal Way, Washington 98001 PORTLAND, OR / BELLEVUE, WA / KENNEWICK, WA / OLYMPIA, WA EROSION CONTROL DETAILS 1 OF 2
F I G I H
DATE: OCTOBER, 2003
2. MANUFACTURERS SPECIFICATIONS.
3 -0.1 -358
REVISION No.
APPLY B10 —MAT TO PRELOAD AND ALL
/P
3. SIDE SLOPE GREATER THAN 10 %.
CONTRACTOR MAY PROPOSE 50MIL. PVC
C10-
4. PLASTIC SHEETING ALTERNATE WITH
HOLDOWN.
CHECK SLOT AT 25' (7.6m) INTERVALS
ISOMETRIC VIEW
P P
6" (150mm)
I G'
12"
0
0
7
6„ (150mm) 6
INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT
EROSION BLANKETS &
TURF REINFORCEMENT MATS R=2'95-303 SLOPE INSTALLATION
DETAIL 3 5
NITS TYP. _..
EXISTING HILLSIDE
DEWATERING
P P P
SUMP I I I 4
SITE STORM
WATER
18 STORM EXISTING POND 3
OUTFALL .±
SUMP VAULT #2 TEMPORARY 24" TEMP
CONSTRUCTION COLLECTION CMP RISER
SETTLING POND POINT
CONSTRUCTION RECORD DRAWING NOTICE
* ALL COMPONENTS TO BE SUPPLIED, INSTALLED AND These record drawings have been prepared based upon 2
MAINTAINED BY CONTRACTOR AS REQUIRED BY SITE information contained in addenda, change orders, or
CONDITIONS. re. 02270 other available construction information, and information
provided by the Contractor, and by others. HDR has not
CONSTRUCTION STORM WATER CONTROL SCHEMATIC verified the accuracy s completeness the information
provided to it and does not warrant the accuracy or
completeness of these record drawings. Users of this
DETAILK4 information shall be solely responsible to verify any and
NTS C8 all information represented. herein prior to any such use
of the information.
CITY OF RENTON
ECONOMIC AND ENGINEERING u Planning /Building /Public works Dept
Kennedy /Jenks SERVICES, INC.
Consultants 10900 10900 NE 4TH STREET, SUITE 1110 WATER TREATMENT AND GOLF COURSE IMPROVEMENTS
32001 32nd Ave. S., Suite 100 BELLEVUE, WASHINGTON 98004
Federal Way, Washington 98001 PORTLAND, OR / BELLEVUE, WA / KENNEWICK, WA / OLYMPIA, WA EROSION CONTROL DETAILS 1 OF 2
F I G I H
DATE: OCTOBER, 2003
PROJECT NO.
3 -0.1 -358
REVISION No.
2
SHT NO.
DWG NO.
C10-