Loading...
HomeMy WebLinkAboutD-314601M N CL �G w x EX 12 °PVC IE -394 EX. ROCKERY WALL WOOD RAIL FENCE - WETLAND TRACT NO MACHINERY ALLOWED ALL MACHINERY SHALL WORK FROM TOP OF BANK -396 INSTALL NEW CB TYPE 11 REBUILD SLOPE, SEE DETAIL- EX 24" CMP — WOOD RAIL _298 IE -392.6 FENCE APPX TOP OF SLOPE l- =� FIBERXOPTIES, LpC-Agpx- �I POWER POLE EX 12 "CI WM RESTORE CURB, GUTTER, SIDEWALK, g INSTALL NEW SID ALK RAMP TYPE 2 ADJUST T FIT EX SIDEWALK -- EX 6" GAS REMOVE EX 24" CMP SD -- - -- -- -- INSTALL NEW 24° SD EX 24 "CMP SD EX 36" WM EX CB RIM EL S 12 "1 N 12'1 RIED PW� �.c III WOOD FE CE REMOVE NEEDED, GV\ � GV -REMOVE NEIGHBORHOOD SIGN AND UWDS ING RESTORE CONSTRUCTION EX CB RIM EL =396.9 N 12 "IE= 395.75 RRESTORE STOP BAR \ EX 8 "PVC SS, ° EX FIBER "OPH —SSMH RIM EL =39265 IN IE= 389.12 OUT IE= 389.02 4,oGv LOC APPX a --- •elm— N —mumm 0' 10' SCALE: 1 "= 10' NOTE: EX FIBER OPTICS APPROX. 2' DEEP ENCASED IN CONCRETE EX 12 "CI WM �-- TRAFFIC /PARKING LANE EX AS ` T a TRAFFIC LANE UNION AVE NE �JC EX 24 "CMP SD TRAFFIC LANE —► EX SDMH _ RIM EL =399.1 TRAFFICU'ARKKING LANE --i►. 1 EOP _ - \ �1,j CAUTION: POSSIBLE BURIED CABLE AIyD _ FIBER OPTICS IN WEST HALF OF STR PORN I w z RECOMMENDED FOR APPROVAL By DANIEL CAREY 6/29/10 BY — _D DWC c� RJS, DWC NO. REVISION BY DATE tAPPR 'PPflO`*R�S CALL 48 HOURS BEFORE YOU DIG 1 -800- 424 -5555 EXISTING UTILITY LOCATIONS ARE APPROXIMATE, NOT ALL UTILTIES MAY BE SHOWN. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. GENERAL NOTES: A. THIS PLAN DEVELOPED FROM PLANS AND ELEVATIONS IN CITY FILES. NOT SURVEYED. LOCATIONS MAY VARY. REF: TED -40 -2956 THE VINEYARDS SUBDIVISION TED -40 -1600 UNION AVE PLANS B. CONTRACTOR SHALL INSTALL EROSION CONTROL, INCLUDING FILTER FABRIC PROTECTION FOR DOWNSTREAM CATCHBASINS. C. TRENCH PATCH SHALL BE PER CITY STD PLAN 110 TYPICAL TRANSVERSE PATCH FOR FLEXIBLE PAVEMENT. D. SEE TRAFFIC CONTROL BID ITEM FOR WORK HOURS AND CONDITIONS. CONSTRUCTION NOTES: 1O REMOVE EX SD PIPE, ENLARGE OPENING AS NEEDED FOR NEW PIPE. Q POTHOLE TO IDENTIFY UTILITY DEPTH, POTENTIAL CONFLICTS. O3 RESTORE CURB, GUTTER, SIDEWALK PER CITY DETAIL DRAWINGS. ADJUST SIDEWALK AND TYPE 2A RAMP AS NEEDED TO MATCH EXISTING. ® TESC PROTECTION: CATCH BASIN PROTECTION, FILTER FABRIC FENCING, ETC. SEE STD DETAILS 214, 216.2, 216.3. INSTALL FILTER FABRIC FENCE IN FRONT OF CONSTRUCTION AREA. PUMP WATER AROUND FILTER FABRIC AND CULVERT AS NEEDED. O5 PROVIDE TEMP STORM WATER BYPASS FOR EX 24" PIPE DURING CONSTRUCTION. TRENCH EXCAVATION PAY LIMIT 5' -0' MAXIMUM ° ° 00 Lid 00 X 4 W W W ° z RIED PW� �.c III WOOD FE CE REMOVE NEEDED, GV\ � GV -REMOVE NEIGHBORHOOD SIGN AND UWDS ING RESTORE CONSTRUCTION EX CB RIM EL =396.9 N 12 "IE= 395.75 RRESTORE STOP BAR \ EX 8 "PVC SS, ° EX FIBER "OPH —SSMH RIM EL =39265 IN IE= 389.12 OUT IE= 389.02 4,oGv LOC APPX a --- •elm— N —mumm 0' 10' SCALE: 1 "= 10' NOTE: EX FIBER OPTICS APPROX. 2' DEEP ENCASED IN CONCRETE EX 12 "CI WM �-- TRAFFIC /PARKING LANE EX AS ` T a TRAFFIC LANE UNION AVE NE �JC EX 24 "CMP SD TRAFFIC LANE —► EX SDMH _ RIM EL =399.1 TRAFFICU'ARKKING LANE --i►. 1 EOP _ - \ �1,j CAUTION: POSSIBLE BURIED CABLE AIyD _ FIBER OPTICS IN WEST HALF OF STR PORN I w z RECOMMENDED FOR APPROVAL By DANIEL CAREY 6/29/10 BY — _D DWC c� RJS, DWC NO. REVISION BY DATE tAPPR 'PPflO`*R�S CALL 48 HOURS BEFORE YOU DIG 1 -800- 424 -5555 EXISTING UTILITY LOCATIONS ARE APPROXIMATE, NOT ALL UTILTIES MAY BE SHOWN. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. GENERAL NOTES: A. THIS PLAN DEVELOPED FROM PLANS AND ELEVATIONS IN CITY FILES. NOT SURVEYED. LOCATIONS MAY VARY. REF: TED -40 -2956 THE VINEYARDS SUBDIVISION TED -40 -1600 UNION AVE PLANS B. CONTRACTOR SHALL INSTALL EROSION CONTROL, INCLUDING FILTER FABRIC PROTECTION FOR DOWNSTREAM CATCHBASINS. C. TRENCH PATCH SHALL BE PER CITY STD PLAN 110 TYPICAL TRANSVERSE PATCH FOR FLEXIBLE PAVEMENT. D. SEE TRAFFIC CONTROL BID ITEM FOR WORK HOURS AND CONDITIONS. CONSTRUCTION NOTES: 1O REMOVE EX SD PIPE, ENLARGE OPENING AS NEEDED FOR NEW PIPE. Q POTHOLE TO IDENTIFY UTILITY DEPTH, POTENTIAL CONFLICTS. O3 RESTORE CURB, GUTTER, SIDEWALK PER CITY DETAIL DRAWINGS. ADJUST SIDEWALK AND TYPE 2A RAMP AS NEEDED TO MATCH EXISTING. ® TESC PROTECTION: CATCH BASIN PROTECTION, FILTER FABRIC FENCING, ETC. SEE STD DETAILS 214, 216.2, 216.3. INSTALL FILTER FABRIC FENCE IN FRONT OF CONSTRUCTION AREA. PUMP WATER AROUND FILTER FABRIC AND CULVERT AS NEEDED. O5 PROVIDE TEMP STORM WATER BYPASS FOR EX 24" PIPE DURING CONSTRUCTION. TRENCH EXCAVATION PAY LIMIT 5' -0' MAXIMUM SEE DETAIL FOR PAVEMENT PATCH BACKFILL MATERIAL WSDOT SECTION 9 -03.19 BANK RUN GRAVEL, OR NATIVE MATERIAL IF IT MEETS SPECS. /—PIPE ZONE MATERIAL WSDOT 2006 SECTION 9- 03.12(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING —NEW UTILITY PIPE EXCAVATION OF UNSUITABLE SOIL (IF NEEDED) DEPTH AS APPROVED BY ENGINEER BACKFILL WITH FOUNDATION MATERIAL MEETING WSDOT SECTION 9 -13.6 QUARRY SPALLS NOTES 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 95% MAXIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. C PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE THAT THE FLOW LINE IS MAINTAINED. . -. CITY OF RENTON '®IRanning/Building/Public Works Dept. D- 314601 UNION AVE NE / NE 5th CT STORM SYSTEM REPAIR IDI- FINAL 6/18/10 _3 4 ° a 2" MIN. 6 " }TMIN a ° SEE DETAIL FOR PAVEMENT PATCH BACKFILL MATERIAL WSDOT SECTION 9 -03.19 BANK RUN GRAVEL, OR NATIVE MATERIAL IF IT MEETS SPECS. /—PIPE ZONE MATERIAL WSDOT 2006 SECTION 9- 03.12(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING —NEW UTILITY PIPE EXCAVATION OF UNSUITABLE SOIL (IF NEEDED) DEPTH AS APPROVED BY ENGINEER BACKFILL WITH FOUNDATION MATERIAL MEETING WSDOT SECTION 9 -13.6 QUARRY SPALLS NOTES 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 95% MAXIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. C PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE THAT THE FLOW LINE IS MAINTAINED. . -. CITY OF RENTON '®IRanning/Building/Public Works Dept. D- 314601 UNION AVE NE / NE 5th CT STORM SYSTEM REPAIR IDI- FINAL 6/18/10 _3 4