Loading...
HomeMy WebLinkAboutD-337508L0 ti M co ti N a ri T a ~ z V W L) 00 a a H W W a W H N2 w 0 H Z Lu Z } W J a� h 1231 FRYAR AVENUE SUMNER, WASHINGTON 90380 T. 253.8835128 F. 253,063.0996 wwx.pereme9ie.wm ,O: TAX LOT 2924059015 CHAINLINK CONST FENCE SEE DWG C5 FOR LIMITS AND NOTE 5 I SEAHAWK lFOR DRIVEWAY CONSTRUCTION ISEE DET DT5 TE BY IE =18.09 (TYP) N 198066.70 E 1303401.42 J 7'x 8' PLUNGE EX 60 "SD I I Ix O 1 i A I REMOVE & REPLACE 145' -12 "SS 3�EEE NOTE 6 �-- 517�9�9YZJ N 198090.95 E 1303404.73 1 EX 6 "SS =A X 60" IE -18.01 REMOVE -,EX 84" MH, CUT'36'-'SD_ & CUT 60 "SD-PIPE AS NECESSARY FOR 10'x-2.8' OUTLET STRUCTURE CONSTRUCTION CB TO BE REMOVED BY I2 "(N)1� =18.40 6 "(W)IE o 18,71 so 60`4> PIPE NO'i�: T0 Go. co u eR EpP (TOP OF esu - TD FLOL,1- 1.1Nre = (v7. S ") TOP sLev- 23,62' INV B1. ®V = 18.00 13Ecp1Es6NDE 1D FOR < ,OPR vAi BY'....___ __ Date! -------- -- - -__ - Date i__. - -__ D` ----- --- - - - -- Datr-:-- -- ---- w fi= M A9 -13 ILT EX 48" MH CSSP40 12" [E=24.58 21,8;:' (IM) AS -SwVT 12" IE =21.72 (ovT) As- su1Cr / I / III i 2 "ARV I i I 0 �1 JUTLET- SIRUCTURE REMOVE & 'REFLAGE DWG �T1 \ 5 I \12 "W (DI) I i ST, 1 +01, 5,RT \ I I 1 SEE DWG C4 N (198061.64 \ I 1 1 a'I , E 1303399.73 NEW SSMH 6A- 48" PLAN oP W /OUTSIDE DROP CONN O SCALE IN FEET IUej2' (N) IE= 2-1-86 21.39(A BuI�T (h12 - va92" (S) ]E=48.94 18.30 -dul t (Ovt) 0 10 20 m EX 60 "SD (LOWER) BQT EL STREAM GRAVEL MOT eL I' 10----J tbP OF STREAM GRAVEL ,uPPBR) 6 R, 1 a,. an -1DP OF No. 1 - to 3 NORT1 CASINGS =21.38 2 "SS TO BE ELOCATED EE DWG C3 F BERM,- - ELOC 12 "W DWG C4 7.31 4 4 EACH, 725-48" DIA STL CASING W/36" NOM DIA HDPE, (DR21) CARRIER PIPE. 3 NORTHERN PIPE AND CASING @ S= 0.50 %, SOUTHERN PIPE @ S =0 %. PIPE AND CASING INSTALLED BY JACK AND BORE METHOD ' I I 1 1 1L 1 1 1 1 I 1 1 ,1 � N Z I- m W 1= co 1 W IW i c �+ 1 N I1co Iw Iz --1 v= III 3 NORTHERN -i 36'1 BO. EL 18.47;- 1 I 1- 36" HDPE j BOT EL 17.95 ' M EX 84 "S EX HDPE 'PIPE I - FOR UNDERCROSSING OF 84 "SS SEE DET AND I . DA RIPE PILE 25' or HNSr I 47.5' PROFILE _ HORIZ: 1"=10' VERT: 1 " =10' 4=:-48 "DIA z STL CASINGS 1 36" BOT EL t; 3 NORTHERN PIPET 36' BOT EL 18.47 1 -150 3 w -z 40 m 30 TOP OF GotSCR. rTS eL =26,22 <AS- (AS -BU16T suaVEY) I �20 -1 1- 48" CASING IE =17.49 3 NORTHERN PIPES- 48" CASINGS IE =18.03 w,sae CITY OF NOPoZDNIIL N,➢ ,991/1991 ' .GE R.H. 4, 08 D59,6NED: 1 " =10' ., CRETE REVISION R.H. 4, 08 R. HERMES RENTON - DM N: J. BETNGG oNl l IUPA ,F X11 ME Ml G'lar�;�y; ?wilding /Public Woks Dept, RE \'S'ON BY A`E APP^ .ronwm: sc.'c �cc6DnNC�r GENERAL: 1. THE CONTRACTOR SHALL PROTECT ALL PRIVATE AND PUBLIC UTILITIES FROM DAMAGE WHEN TRENCHING ACROSS OR BESIDE THESE UTILITIES. 2. PIPE TRENCH SHALL BE IN ACCORDANCE WITH SECTIONSeANDe. DT5 DT5 3. EXCAVATION ON SEAHAWK SITE (WEST OF BNSF R /W) WILL ENCOUNTER EITHER A SOIL CAP INDICATOR FABRIC OR A 30 MIL MEMBRANE CAP AS SHOWN ON SECTIONS1 A7 D5 DT5 DT5 CONTRACTOR SHALL EXPOSE CAP MATERIAL(S), AND CUT BEFORE CONTINUING EXCAVATION FOR PIPELINES OR STRUCTURES. 4. FOR STORMWATER DIVERSION THROUGH SITE SEE SPECS, SECT 7 -04, AND DWG C. 5. CONSTRUCTION FENCE LOCATION IS SUBJECT TO 'CHANGE DURING CONSTRUCTION AND TC BE COORDINATED' WITH FNW AND IT'S CONTRACTORS. 6. PERMANENT FENCE LOCATION. TO BE CONSTRUCTED BY FNW AND LOCATION OF PERMANENT FENCE WILL BE LEFT OrEN UNTIL THIS PROJECT IS CONSTRUCTED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH FNW'S PERMANENT FENCE CONTRACTORS ON WHEN AND WHERE FINAL FENCE LOCATION IS TO BE. CONSTRUCTED ALONG THE SOUTH ACCESS ROAD ADJACENT TO THE RAMP. SW 29 -24 -05 AS - Bulyr DAiE: RIPLEY LANE N. STORM SYSTEM IMPROVEMENT PROJECT 3/21/08 itE1D6WN: 4- 36" DIA STORM SEWER PLAN DPA W ND: c SHFE': 7 OF:2O J I V Ley= IIB,G� [c!50 IrJV LeV =IS.OS - NOTE: FO VER?ICALrLOCATION HORIZONTAL AND IS Y �IQ STA 1 +61 ESTIMATED (DO NOT DAMAGE) o w _ N o- CL - - - - -- FO S A56', /. (Ag) -36 A� 191' NOM D HD E - - -_ -_ -- �__- - - - --- PROFILE _ HORIZ: 1"=10' VERT: 1 " =10' 4=:-48 "DIA z STL CASINGS 1 36" BOT EL t; 3 NORTHERN PIPET 36' BOT EL 18.47 1 -150 3 w -z 40 m 30 TOP OF GotSCR. rTS eL =26,22 <AS- (AS -BU16T suaVEY) I �20 -1 1- 48" CASING IE =17.49 3 NORTHERN PIPES- 48" CASINGS IE =18.03 w,sae CITY OF NOPoZDNIIL N,➢ ,991/1991 ' .GE R.H. 4, 08 D59,6NED: 1 " =10' ., CRETE REVISION R.H. 4, 08 R. HERMES RENTON - DM N: J. BETNGG oNl l IUPA ,F X11 ME Ml G'lar�;�y; ?wilding /Public Woks Dept, RE \'S'ON BY A`E APP^ .ronwm: sc.'c �cc6DnNC�r GENERAL: 1. THE CONTRACTOR SHALL PROTECT ALL PRIVATE AND PUBLIC UTILITIES FROM DAMAGE WHEN TRENCHING ACROSS OR BESIDE THESE UTILITIES. 2. PIPE TRENCH SHALL BE IN ACCORDANCE WITH SECTIONSeANDe. DT5 DT5 3. EXCAVATION ON SEAHAWK SITE (WEST OF BNSF R /W) WILL ENCOUNTER EITHER A SOIL CAP INDICATOR FABRIC OR A 30 MIL MEMBRANE CAP AS SHOWN ON SECTIONS1 A7 D5 DT5 DT5 CONTRACTOR SHALL EXPOSE CAP MATERIAL(S), AND CUT BEFORE CONTINUING EXCAVATION FOR PIPELINES OR STRUCTURES. 4. FOR STORMWATER DIVERSION THROUGH SITE SEE SPECS, SECT 7 -04, AND DWG C. 5. CONSTRUCTION FENCE LOCATION IS SUBJECT TO 'CHANGE DURING CONSTRUCTION AND TC BE COORDINATED' WITH FNW AND IT'S CONTRACTORS. 6. PERMANENT FENCE LOCATION. TO BE CONSTRUCTED BY FNW AND LOCATION OF PERMANENT FENCE WILL BE LEFT OrEN UNTIL THIS PROJECT IS CONSTRUCTED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH FNW'S PERMANENT FENCE CONTRACTORS ON WHEN AND WHERE FINAL FENCE LOCATION IS TO BE. CONSTRUCTED ALONG THE SOUTH ACCESS ROAD ADJACENT TO THE RAMP. SW 29 -24 -05 AS - Bulyr DAiE: RIPLEY LANE N. STORM SYSTEM IMPROVEMENT PROJECT 3/21/08 itE1D6WN: 4- 36" DIA STORM SEWER PLAN DPA W ND: c SHFE': 7 OF:2O