HomeMy WebLinkAboutD-337807I
I
r)
I
SURVEYED:
"It Tr-\U "
3 --4
30'
2
Sco/e-- None
Mp
Scale: None
BASE MAP PLOT:
DESIGN PLOT: AH 12/2006
CHECKED:
FIELD BOOK:
ISSUED FOR PERMITS
REVISION
Scale: None
45'
1 (BEHIND)
ELEVA TION
Scale: None
I" A _r/11 Ir- r
-)
POST SPACING 14'-1" C/C
15'
Q
C IJ/10/07
BY I DATE
S.co/e: None
K-4 1� FA-
8 (BELOW)
- I
00
SECTION
Scale: None
ENLARGED SECTION
Scale: None
1�
PROJECT No.
SURVEY No.
MAINTENANCE DIVISION No. —
CA's
O �
22498
/S_r &
'y8/ONA\-
2" COMPACT
ASPHALT CO
4"
AS I=
AF)F)ITinNIA
Ivif I L-) I
REQUIRED DEPENDING ON SOIL
CONDITIONS
0.02 FT./FT.
PAVEMENT DETAL
SCALE- NONE
I�ING COUNTY DEPT. OF TRANSPORTATION
HAROLD TANIGUCHI, DIRECTOR
RENTON POLE YARD RELOCATION
155 MONROE AVE NE
RENTON, WA 98056
FENCING AND PAVEMENT DETAILS
TYP �
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
SHEET