Loading...
HomeMy WebLinkAboutD-353105C0 L0 ce) r\ C\l CL J. / CONSTRUCTION NOTES: _RIGHT -OF-WAY -- - --- -- - GRAVEL ACCESS PAD. SEE DETAIL 2, SHEET 8. - - - -- - - - - --- - - - - z 11 -_ SPECIFICATIONS. -. DEBRIS BARRIER. SEE STD. PLAN 223.00 IN G -7 "105 REMOVE AND WASTEHAUL 20 LF OF EXISTING 12" DRAIN PIPE, G G REM G w VJ - - - - - - - - ---- G DAYLIGHT EXISTING 12 MAIN INTO NEW BIOSWALE. G 7-- —7- G _�L/— G ---- G C. CONTRACTOR TO VERIFY INVERT OF NEW ENTRANCE INTO THE 3 y- w i. - - --- - - - - - G < I __ G WASHINGTON BLVD N.- BIOSWALE. W_ G __' LAKE W)" 7 � I � w C G ------ PROPOSED BIOSWALE. SEE DETAIL 3, SHEET 9. C :f G ANGLE POINT STA 18+75 E— _OFFSE­T­16'-RT_�_'��7-� TING HEADWALL AND 60 LF OF REMOVE AND WASTEHAUL EXISTING G "�.7 7: LU EXISTING 24" ADS CULVERT. G _7) w 7 0 CEI 2L co N REMOVE AND WASTEHAUL EXISTING CULVERT (APPROXIMATELY B� _w 35 LF) CD W w —,/, w - 7 , . 11 1 ---- ( -_ - i - yy w 70 11141-1,13 CURB LINE. SEE DETAIL 4, SHEET 9. 5 ------ - W ------- CONTRACTOR TO POTHOLE FIBER OPTIC AND OTHER UTILITIES Z__ 88 LF 2e _CPEP1 ------ 7 - - - - - - - - - RIQH - _�Y_A y PRIOR TO CONSTRUCTION FOR UTILITY CONFLICTS. < FI-Ow- F— . ig> OPEN CURB FACE. SEE STD. PLAN 203.00 IN SPECIFICATIONS 1�7 LF 24 CPEP, DEDICATED RIGHT-OF-WAY U) FUTURE RIGHT-OF-WAY W UTILITY POLE TO BE RELOCATED BY PSE. CONTRACTOR TO — — — — — — — — z COORDINATE WITH PSE DURING CONSTRUCTION. A CB 3 -TYPE 2 CB 5 TYPE 2 CPE v o3 6 t - ROUTE 18- CPEP STORM STUB TO EXISTING LOW ELEVATION 13 LF± 18' P _17 OF DITCH. INSTALL CAP. ANGLE POINT STA 20+40 C 1-TYPE 2 LF 12" V�4c OFFSET-22' RT 0 MATCH EXISTING ('0 �g REMOVE AND WASTEHAUL EXISTING CB AND PLUG EXISTING CURB AND SIDEWALK I PIPE TO EAST. REMOVE PIPE BETWEEN CB AND R.O.W. LINE. (DIMENSIONS AND TYPE 21�� < GRADE). 2 3 CONSTRUCTION CEMENT CONCRETE DRIVEWAY ENTRANCE, SEE DETAIL 2, O.o0lFT/FT ..IS U U, EASEMENT SHEET 9. 27 ____,�_�,BIOSWALE EASEMENT LINE PIN PILES AS NEEDED 08 SOLID LID (AS-80) 8 __�TEMPORARY (INSTALL BEFORE S/W FILL) 41 9 Rim 20-86 CONSTRUCTION PERVIOUS CONCRETE SIDEWALK. SEE DETAIL 1, SHEET 9. EASEMENT FLOW SPUTTER MANHOLE, 72" DIAMETER W/SOLID LID. SEE IE-26.64 (V4 16' PVC - - -------- UffE t 3 - - - -- - - - - - - - - 4 STA. 18+3"0' RT DETAIL 1, SHEET 8. STA. 17+39 61' R 1.E.-26.29 TEMPORARY ECOLOGY BLOCK WALL (OR EQUIVALENT AS 26.119 iE=2r-.73 A,�-sLT ��XISYJ, - -P 81 IL VG W-26.19 AS -BET N �_7 M L r U APPROVED BY THE OWNER) W/BIKE PATH HANDRAIL, TWO STA. 17+22, 72' RTi BLOCKS HIGH OR AS NECESSARY TO MATCH GRADE (WALL 3224059043 I.E.=q � MUST NOT EXCEED 4' HIGH). SEE SPECIFICATIONS. 7. -7 3224059043 ASSUMED LOCATION OF UNDERLYING CONCRETE PANELS. _j CONTRACTOR TO POTHOLE/VERIFY ANY CONCRETE PANEL DISTURBANCE PRIOR TO CONSTRUCTION WITHOUT DAMAGING PANELS. RIM 29.9.9 ex it 10.30: (E) vr 04C. 0 0 In 'r, IEgr26_49 (S) JeP pvc REMOVE AND WASTEHAUL EXISTING CURB AND PAVEMENT (AS REQUIRED) FROM STA. 20+40 TO 24+38. .......... _C8 Soap a p o C, + I FINISHED CURB LINE ON BRIDGE. SEE DETAIL 5, SHEET 9. F 0 N w _ ....... ...... LOW POINT. ELEV;ni3l.98 X CS :RIM 31.03 LOW POINT STA=19436.18 + NON-PERVIOUS CEMENT CONCRETE SIDEWALK. SEE PVI STA=19-HOEiO > SPECIFICATIONS. < JE- (Lem A$ -!5 ) P.VI ELEV=zZIL86 ................. ................ ...... ...... ............ iLl .... ROVIDE 12" STU13 TO PROPERTY LINE. INSTALL CAP. A.9.�1.27%: K= 79.24. V) m < VIBRATIONS MAY CAUSE SETTLEMENT AT EDGE OF EXISTING m -'XiS I N G GPADE BUILDING'S FOOTINGS (SEE SPECIFICATIONS FOR STRUCTURAL < ... REINFORCEMENT ALONG 58 LF OF BUILDING). x is-aw.cniom ED 5 GRADE AT� NEW � ...... ................ . ......... ...... ..... ... . ......... . ................... ................... ....... .:.:Cl X.5 . .... . 'CURB FLOW 'LINE:.; SAWCUT AND REMOVE/WASTEHAUL EXISTING ASPHALT TO THE -1,289 EASEMENT LINE. REPLACE PER LANDSCAPING PLANS, 0.31% \qm ISTING FENCE. RESTORE AREA PER RE OVE/WASTEHAUL EX A A IN PLANS. 0 30 -AIL ......... ............. ............... . .... .. ....... ..... ... 2 D_ A I C' 52 �L OL 1 CREP :71 LF± 24" �CPEP 84 LF± 24' CP INSTALL CAP AT THE END OF 18" STORM STUB. 27-LF±-24-CPEP - - - -- - - - - 88 LF± 24" 00: .. LF± 24- CPEP EP s-a.aeei m TION OF NEW CONDUITS. -- - - - - - - - - - - _-O.000T - - - - - - - - - - - - �g SEE LANDSCAPING PLANS FOR LOCA ''.CL , 5 A .... 25 XISTIN" :r Fv' i_,ON CONSTRUCTIONk CLN ILZt NP 0 ELEVATION: AT NEW ;, jj.CURB:FL 20 . .. . ...... .. ............ 4 co C' �<,:C� :m jj An, 0, m�N. In, �In, 1�� ":00 1�1�OO ��m .10 �0 T,).t ujtL) �6 I n ;1) C� N 01 cNi CV N.,V �N.6 ... 9*n :n � :n IA lc\ll I I n ') n 9:n K) 5 vo 15 7+00 ___18+_00 tz 19+00 om, __21 +00 In 0 In 0 0 L< < UTILITY NOTE-. z w z THE CONTRACTOR SHALL CALL THE UTILITY LOCATION D 2 55 (A b w Z) 0 ED w 3 -, vi-j-h _1 w 01 < a- ;;S 1z -Z 00 0 0 REQUEST CENTER 00_,www co 0 w C3 0 K z COLO eb I to I 0or (ONE CALL CENTER; 1-800-424-5555) FOR FIELD 3: W ILI (A Cq 3r w LOCATION OF UTILITIES. THE CONTRACTOR SHALL BE t < dc < C40 V) Z W L<q ri L_ � N 3' w w 00 0 �V) Z Z My MnwV) L<.,IQ w I Z z mm z <q RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, �,3 2� < AND DEPTH OF ALL EXISTING UTILITIES WITHIN THE 0 0 w 0 1- CL 1 -eX 12L EL D_ EL m C_ Q- M M M '00 (L 0- a, PROJECT. WHETHER SHOWN ON THESE PLANS OR NOT, , 1w Ld 00 wwwz '072 i w 4- Oo oc > Of CL O_ EL BY POTHOLING THE UTILITIES AND SURVEYING THE w ILI W w in Z I< 16 M (L D. EL OL CL &Q. 0 (L D. EL I GO D VERTICAL AND HORIZONTAL LOCATION PRIOR TO CONSTRUCTION. ALL POTENTIAL UTILITY CONFLICTS SHALL BE POTHOLED A MINIMUM OF FIVE WORKING DAYS IN P. ADVANCE OF ANY PIPELINE TRENCH EXCAVATION. THE ANN m4 4 w C4 4 - d X) 06 CL w wn I - W_ 04114 P) CL M + UTILITIES SHOWN ON THE PLANS ARE BASED UPON (1) 0- + + + + OD _C4 AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. r r uJ "m IF CONFLICTS OCCUR THE CONTRACTOR SHALL CONSULT A 114 11) 7 0j (4 C4 0 THE PROJECT ENGINEER TO RESOLVE THE PROBLEM 4 4 1 C C14 C -4 4 1 1 11 1 1 11 11 Q it It 4 11 < I I I ED it !I it m� Lj it . . M i it It 0 It K PRIOR To PROCEEDING WITH CONSTRUCTION. 03 Li L DO an I- �ml , VO I W LU Ul ; . I _�. sg Lu! , . i, VO 0 (f) W-1 Q In 0 uwff S3rONALO SSrONALG -----T ---- T AS-BUILTS [D]-T3T513� 11 0�5 AS-BUILT SURVEY BY: EVAN 1"=20' IM. w 2/14/11 WAHLSTROM, PLS#44651 IMMMOk B.P.B. CITY OF LAKE WASHINGTON BLVD NORTH (INFORMED LAND SURVEY) REN TON STORM WATER & WATER MAIN %_Am"0x%%e7 C.J.K. (!DATUM [MWHGm CONSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED I­7T_z_7.____1 Public Works Dept. IMPROVEMENTS 5 S.A.C. 701 DEXTER AVENUE NORTH SUITE 200 STORM PLAN AND PROFILE SEATTLE, WASHINGTON 98109 (206) R84-N60 BY SC AND BB ON 2/14/2011 & 2/15/2011 NO. REVISION BY DATE APPIR ANmRINGIN B.P.B. SHEET G"' i