Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutD-353112w
O
m
a
w
w
a)
0
0
a
w
Z
J
U
F
a
—_C �i!r r• C `14+00
_ I
—
4
LO
12 +00
TPI F _ 1-_ l' 2
— ------_'—� Vi
LU
2 - - -- -- -- -- -- --
J
Q
a
j�
A:
73 � We4�m
37338 0 ,� o. 9. 36311 _
CONSTRUCTION NOTES:
tO CONTRACTOR SHALL SAWCUT EXISTING ASPHALT
PAVEMENT AND CONCRETE PANEL, AS REQUIRED.
O2 CONTRACTOR SHALL COLD PLANE /GRIND EXISTING
PAVEMENT SURFACE, 2" DEPTH. ALL MATERIAL
SHALL BE REMOVED AND WASTE HAULED BY THE
CONTRACTOR.
3O CONTRACTOR SHALL FURNISH AND INSTALL HMA
OVERLAY. SEE TYPICAL CROSS SECTIONS ON
SHEET 16.
O4 CONTRACTOR SHALL FURNISH AND INSTALL NEW
PAVEMENT SECTION, SEE TYPICAL CROSS
SECTIONS ON SHEET 16.
5O CONTRACTOR SHALL REPAIR EXISTING CONCRETE
PANEL PER STANDARD DETAIL H033 IN THE
SPECIFICATIONS.
O6 CONTRACTOR SHALL FURNISH AND INSTALL
GRAVEL SHOULDER, SEE TYPICAL CROSS SECTIONS
ON SHEET 16. REMOVE AND WASTEHAUL EXISTING
ASPHALT AS REQUIRED.
11�
J©©©©©l
AS -BUILT SURVEY BY: EVAN" �". NeGLL NWD,
WAHLSTROM, PLS#44651 emeao "� 2/14/LAKE OF LAKE WASHINGTON BLVD NORTH
B.P.B.
4c; y 8r ®sbosne' Imo. (INFORMED LAND SURVEY) owe C.J.K. REN TON STORM WATER & WATER MAIN
DATUM ICI
CONSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED c�¢unxuSA,C, sN Public works Dept: IMPROVEMENTS 21
]Ol DEXTER AVENUE NORTH SUITE 200 PAVEMENT RESTORATION SHEETS
SEATTLE, WASHINGTON 98109 <zos, 284-0e60 BY SC AND BB ON 2/14/2011 & 2/15/2011 N0. REVISION BY DATE APPR �AP1i B.P.B. �0°�"r* 21 °' 27