HomeMy WebLinkAboutD-353113T
lM'/
LO
M
N
U)
N
N
W
W
W
W
Coll
CollO
O
O
N
a
w
Z
J
2
L)
H
a
SECTION 32, TWP 24 N, R 5 E. W.M.
P. A
pI— WA-S-;-
�m
37338 .
CONSTRUCTION NOTES:
O CONTRACTOR SHALL SAWCUT EXISTING ASPHALT
PAVEMENT AND CONCRETE PANEL, AS REQUIRED.
O2 CONTRACTOR SHALL COLD PLANE /GRIND EXISTING
PAVEMENT SURFACE, 2" DEPTH. ALL MATERIAL
SHALL BE REMOVED AND WASTE HAULED BY THE
CONTRACTOR.
O3 CONTRACTOR SHALL FURNISH AND INSTALL HMA
OVERLAY. SEE TYPICAL CROSS SECTIONS ON
SHEET 16.
O4 CONTRACTOR SHALL FURNISH AND INSTALL NEW
PAVEMENT SECTION, SEE TYPICAL CROSS
SECTIONS ON SHEET 16.
SO CONTRACTOR SHALL REPAIR EXISTING CONCRETE
PANEL PER STANDARD DETAIL H033 IN THE
SPECIFICATIONS.
O6 CONTRACTOR SHALL FURNISH AND INSTALL
GRAVEL SHOULDER, SEE TYPICAL CROSS SECTIONS
ON SHEET 16. REMOVE AND WASTEHAUL EXISTING
ASPHALT AS REQUIRED.
1 �
AO -6UIL1 OURVCT 6T: CVAPA -- - -- VFFBVI: NAA)11
WAHLSTROM, PLS#44651 DES MO�NpL µm IN 10' s4 2/14/11
CITY OF LAKE WASHINGTON BLVD NORTH
B.P.B. "u REN TON STORM WATER & WATER MAIN
� �08�> Imo. (INFORMED LAND SURVEY) puxs C.J.K. 1
yCONSULTING ENGINEERS ' THE - ORIGINAL PLANS WERE STAMPED `"s.n.c.�. DATUM Y Public Works Dept. IMPROVEMENTS o0 22 FwaREIRCH
701 DEXTER AVENUE NORTH SUITE 200 gY SC AND BB ON 2/14/2011 & 2/15/2011 ten: � y PAVEMENT RESTORATION SHEETS
SEATTLE, WASHINGTON "` 27
ON 98109 206) 284 -0860 NO. REVISION BY DATE APPR 22
B.P.B.
35-3"