Loading...
HomeMy WebLinkAboutD-353113T lM'/ LO M N U) N N W W W W Coll CollO O O N a w Z J 2 L) H a SECTION 32, TWP 24 N, R 5 E. W.M. P. A pI— WA-S-;- �m 37338 . CONSTRUCTION NOTES: O CONTRACTOR SHALL SAWCUT EXISTING ASPHALT PAVEMENT AND CONCRETE PANEL, AS REQUIRED. O2 CONTRACTOR SHALL COLD PLANE /GRIND EXISTING PAVEMENT SURFACE, 2" DEPTH. ALL MATERIAL SHALL BE REMOVED AND WASTE HAULED BY THE CONTRACTOR. O3 CONTRACTOR SHALL FURNISH AND INSTALL HMA OVERLAY. SEE TYPICAL CROSS SECTIONS ON SHEET 16. O4 CONTRACTOR SHALL FURNISH AND INSTALL NEW PAVEMENT SECTION, SEE TYPICAL CROSS SECTIONS ON SHEET 16. SO CONTRACTOR SHALL REPAIR EXISTING CONCRETE PANEL PER STANDARD DETAIL H033 IN THE SPECIFICATIONS. O6 CONTRACTOR SHALL FURNISH AND INSTALL GRAVEL SHOULDER, SEE TYPICAL CROSS SECTIONS ON SHEET 16. REMOVE AND WASTEHAUL EXISTING ASPHALT AS REQUIRED. 1 � AO -6UIL1 OURVCT 6T: CVAPA -- - -- VFFBVI: NAA)11 WAHLSTROM, PLS#44651 DES MO�NpL µm IN 10' s4 2/14/11 CITY OF LAKE WASHINGTON BLVD NORTH B.P.B. "u REN TON STORM WATER & WATER MAIN � �08�> Imo. (INFORMED LAND SURVEY) puxs C.J.K. 1 yCONSULTING ENGINEERS ' THE - ORIGINAL PLANS WERE STAMPED `"s.n.c.�. DATUM Y Public Works Dept. IMPROVEMENTS o0 22 FwaREIRCH 701 DEXTER AVENUE NORTH SUITE 200 gY SC AND BB ON 2/14/2011 & 2/15/2011 ten: � y PAVEMENT RESTORATION SHEETS SEATTLE, WASHINGTON "` 27 ON 98109 206) 284 -0860 NO. REVISION BY DATE APPR 22 B.P.B. 35-3"