HomeMy WebLinkAboutS-301003N88 °49'09,*p w
09 "W
,TAN
76.89
LOT A
L AKE WVASHING TON
WA TER EL EVA TION
21.85 = O.H.W.L. —CORPS OF ENGINEERS
NGVD 1983
18.50 = 0. N. W.L. — CITY OF REN TON
LOT B
438.37'
LOT C
475.92'
PORTION OF GOVT LOT 2 OF
SECTION 32, TOWNSHIP 24 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON. S TA.TF OF WA Sr- riniGrnni
� o ��
0000,
Ar
0.040"
01
ko, �-�O 00000'
00000'
�P I 0� I / P
0 �' ''0 _ G / PROPOSED 1
13 / -- G
- � ' / �' le
,' FROM BAR
p 000010 _A�
I —' �^� 0� P y,
dI
rU rIC ►r (IIAVUUI / J
AIL THIS SHEET , jO
:X. SEWER
LOCKING
'.J. (VERTICAL) A\O
12 ` �X�
rx
J
V`
P
4 (V
.3 -PHASE POKFR
TO LIFT STA.
17=20 '
)ZRAPHIC SCALE
10 20 40
( IN EMT
I inch = 20 it.
INSTALL 8" THICK CONCRETE PAD
OVER POWER AND SEWER CONDUITS
WHERE COVER UNDER NEW ROADWAY
WILL BE LESS THAN 3'. '
r �•
'i
EX. 6" FORCE
MAIN FOR SEWER •%
W/3 PHASE POWER
TO BE RELOCA TED AND
REMOVED FROM THIS TRENCH
DEADMAN SEE
SH T. 9 T51
N
DETAILS rr%
IIL
•�
EXIS71NG
<!7
LIFT STA 710N
CONNECT TO EX. SEWER
MAIN.
1- DEADMAN BLOCKING
NO TE• 1 -30• BEND -R.J.
EXISTING 6" FORCE MAIN IN LOT "D" MA Y NOT BE
REMO VED OR FOUNDA PONS EXCA VA TED UN TIL THE
SEWER FORCE MAIN HAS BEEN RELOCA TED.
SEWER FORCE MAIN TO BE RELOCA TED USING 6" DI CLASS 52.
JOINTS SHALL BE RESTRAINED USING UNIFLANGE
UNIFLANGE SERIES 1300 ON DI PIPE.
ALL FITTINGS SHALL BE STANDARD DUCTILE IRON FITTINGS.
COORDINA TF POWER RELOCA 7101V WI TH PUGET SOUND
POWER.
ROLL 2 0,�
LUA-96-153LLA
LND— 30— 0159
469.38 (MEA S,
S 88 °49'09" E
40th S TRI
FOUND COPPER TACK
IN CONCRETE ROAD
W STEEL RING AS CASE
BLVD & N 40TH ST INTERSECTION
(10/21/93)
SEMER FORCE MAIN
REL OCA TION REOUIREMEN TS:
I. CON TRACTOR, TO VERIFY L OCA TION OF EXIS TING
FORCE MAIN AT LIFT STA 17ON AND AT RAILROAD
RIGHT OF WAY CROSSING.
2. ALL SEWER AND FORCE MAIN REL OCA TION WOR-in
SHALL BE COORDINA TED WI TH THE Cl T Y OF
REN TON PERSONNEL.
J. INSTALL GRA W TY SEWER AND OTHER U77LI TIES AS
NEEDED ADJACENT TO THE PROPOSED FORCE MAIN.
4. INSTALL AND TEST NEW FORCE MAIN.
5. MAKE FINAL CONNECTIONS TO THE EXISTING FORCE
MAIN PER DETAIL AND CITY REQUIREMENTS.
6. RELOCA TE POWER TO THE SEWER LIFT STA TION
B Y PUGS T SOUND ENERG Y. COORDINA TE WI TH
CITY OF REN TON PERSONNEL.
7 REMOVE EXISTING SEWER FORCE MAIN.
8 REMOVE EXISTING OLD ELECRICAL CONDUITS
BY PUGET SOUND ENERGY.
9. CON TINUE CONS TRUC TION WI TH THE REMAINDER
OF THE U TILT TIES, AND STREET IMPRO IIEMEN TS
DEADMAN SEE
SHT. 9 FOR
DETAILS
CONNECT TO EX. SEWER
FORCE MAIN.
1- DEADMAN BLOCKING
2 -45• BEND -R. J. VERTICAL)
1--6" NIPPLE AS REQ V.
t�
INSTALL NEW 6 "SEWER
FORCE MAIN. 100 LFf
ALL FORCE MAIN
CONSTRUCTION KILL
REQUIRE REV RAINED JOINTS
AS REQUIRED IN NOTE BELOW
2 -30' BENDS -R. J.
1 -6" NIPPLE AS REQ'D.
CONNEC TION DETAIL
SEE SHEET 8 OF 12
FOR PROFILES
�F I;t 20,,3—
ah
"AS— BUILT" NOTE: I EXPUMS
'AS-- BUILT" IS BASED ON A ACTUAL FIELD SURVEY
BY TOUMA ENGINEERS AND INFORMATION SUPPLIED
BY CONTRACTOR.
RECOMMENDED
FOR APPROVAL
BY DATE
BY DATE
BY DATE
BY DATE
BY DATE
�3 � 3cica 21
r
0
W N
Cr O
Ls- `v
r a
F- 3
0
Z
o
V U
W
� W
a
W W
� cr
Tr T
to
h
a
W A�
ft
a
Wa W
4 Z
1►� �N
4
a
Tal
o■
Z
Q
U a
a) W
0 or
W
J
-- 2
Z
C�
t
rA
C11 N
'r
N
4
n
n
a� z
° a
N � J
to
a
y
N
�
Z
Q
U a
a) W
0 or
W
J
-- 2
Z
C�
t
rA
C11 N
'r
N
4
n
n
a� z
° a
N � J
to
a
y