Loading...
HomeMy WebLinkAboutS-306204N to 0 C? I- Cm L I 1 SECTION 31,32 TOWNSHIP 24 NORTH, RANGE 5 EAST, W.M_ KING C01-JNTY, WASHINGTON. WATER SURFACE ELEVATION = 16.8'(NAVD88) AT TIME OF SURVEY. WATER SURFACE ELEVATION VARIES FROM 16.8 TO 18.8 :AL IS SCALED I et�� 'l ec�a; ACM, Inc. DHA -7 SCR "X" IN CONC WALK 1917 First Avenue E 1301246.3096 ELEV= 39.97' Seattle, Washington 98101 1 DRAWING CONFORMED TO CONSTRUCTION RECORDS 206443 -5300 Fax: 206 -443 -5372 NO. REVISION BY ROLL I 3, J HOUSE #3805 HOUSE #3719 NOTES: 1. HORIZONTAL AND VERTICAL LOCATION SHOWN FOR EXISTING 8' CAST IRON FLUSH MAIN IS APPROXIMATE. VERIFY HORIZONTAL AND VERTICAL LOCATION PRIOR TO MANHOLE SHOP DRAWING SUBMITTAL_ 2. SEE DIVISION 1 SPECIAL PROVISIONS FOR CONSTRAINTS AND MILESTONES OF IN —LAKE WORK AND OTHER WORK PRODUCTS. 3. AVAILABLE HYDRAULIC HEAD LOSS IN THE FLUSH STATION SYSTEM IS EXTREMELY LIMITED. SEWER BYPASSING AND /OR SEWER CLEANING METHODS THAT INTRODUCE SIGNIFICANT HEAD LOSS INTO THE SYSTEM OR SURCHARGE THE SYSTEM WILL RESULT IN SEWER BACKUPS INTO HOMES. CLEANING AND SEWER BYPASSING METHODS THAT RESULT IN SURCHARGING WILL NOT BE ALLOWED. THE CONTRACTOR SHALL AT ALL TIMES CONDUCT ITS WORK SO AS TO PREVENT ANY BLOCKAGE AND SURCHARGING IN THE SIDE SEWERS CONNECTED TO THE FLUSH MAIN. DAMAGE TO EXISTING FACILITIES AS A RESULT OF THE CONTRACTOR'S WORK SHALT. BE PROMPTLY REPAIRED IN KIND AT THE CONTRACTOR'S EXPENSE. 3-306204 Q CALL TWO BUSINESS DAYS J� BEFORE YOU DIG 1 -500 -424 -5555 UPg N N d �v ° 20 0 20 40 a Q SCALE IN FEET $ IN CITY OF w.o + MAY 2003 AS NOTED. tea: xo ,ssr, FENTON KENNYDALE LAKEFRONT s SEWER IMPROVEMENTg r� aau DATUM planning /Building /Public Works Dept. SITE MANHOLE LOCATION C2 F IW OE r]I 2 ,nnnm s�ac.mtrvar 4 X10 8x SCANNEDHAR 29 -2—fc CD; 7--'?0 Fl-V w I IF DHA -7 SCR "X" IN CONC WALK N 1947172221 E 1301246.3096 ELEV= 39.97' NOTES: 1. HORIZONTAL AND VERTICAL LOCATION SHOWN FOR EXISTING 8' CAST IRON FLUSH MAIN IS APPROXIMATE. VERIFY HORIZONTAL AND VERTICAL LOCATION PRIOR TO MANHOLE SHOP DRAWING SUBMITTAL_ 2. SEE DIVISION 1 SPECIAL PROVISIONS FOR CONSTRAINTS AND MILESTONES OF IN —LAKE WORK AND OTHER WORK PRODUCTS. 3. AVAILABLE HYDRAULIC HEAD LOSS IN THE FLUSH STATION SYSTEM IS EXTREMELY LIMITED. SEWER BYPASSING AND /OR SEWER CLEANING METHODS THAT INTRODUCE SIGNIFICANT HEAD LOSS INTO THE SYSTEM OR SURCHARGE THE SYSTEM WILL RESULT IN SEWER BACKUPS INTO HOMES. CLEANING AND SEWER BYPASSING METHODS THAT RESULT IN SURCHARGING WILL NOT BE ALLOWED. THE CONTRACTOR SHALL AT ALL TIMES CONDUCT ITS WORK SO AS TO PREVENT ANY BLOCKAGE AND SURCHARGING IN THE SIDE SEWERS CONNECTED TO THE FLUSH MAIN. DAMAGE TO EXISTING FACILITIES AS A RESULT OF THE CONTRACTOR'S WORK SHALT. BE PROMPTLY REPAIRED IN KIND AT THE CONTRACTOR'S EXPENSE. 3-306204 Q CALL TWO BUSINESS DAYS J� BEFORE YOU DIG 1 -500 -424 -5555 UPg N N d �v ° 20 0 20 40 a Q SCALE IN FEET $ IN CITY OF w.o + MAY 2003 AS NOTED. tea: xo ,ssr, FENTON KENNYDALE LAKEFRONT s SEWER IMPROVEMENTg r� aau DATUM planning /Building /Public Works Dept. SITE MANHOLE LOCATION C2 F IW OE r]I 2 ,nnnm s�ac.mtrvar 4 X10 8x SCANNEDHAR 29 -2—fc CD; 7--'?0 Fl-V w I IF