Loading...
HomeMy WebLinkAboutS-306205N LD O C? r_ N ► c I FLUSH MAIN HORIZONTAL AND VERTICAL/ - LOCATION IS SCALED FROM SHEET 3 OF 6 CITY OF RENTON PUBLIC WORKS / PROJECT 5 -442 - DATED 11 -1986 4- WA TER SURFACE ELEVATION = 16.8'(NA VO88) / A T TIME OF SURVEY. WA TER SURFACE ELEVA T1 ON / / �O) VARIES FROM 16.8 TO 18.8 / �y �QJ LAIIKE AS IN ON T z r7 � a` � BOAT SP1KE /GRAVEL N 193202-4220 E 1300549.6929 -692 2 / ELEV= 24.93" " M HOLE CO RDI AT S / „ EX T NG 8/G T � / IP F U H IN MANHOLE COORDINATES o / BED , nc � 47 /P X RE AINT �z� a• � a4 122° 12'33" Z/A LE N 396378.6127 47'31'16" E 5886 .1272 / / / SITE 2 MANHOLE i j / j SEE 4 122° 12'34" N 396352.0267 E 58866.7446 __q° i A PP � SS / SS� / /� MEGALUG INSTALLED CPt N SAN CLEANOUTR I / .ROCKERY rV ?9�OE5.775F E 1_700_ Ccl,5_;rl9 li Tetra Tech /KCM, Inc. First Avenue Seattle, Washington 98101 2054435300 Fax: 206443 -5372 HOUSE #5233 Flill J� � �O NOTES: 1. HORIZONTAL AND VERTICAL LOCATION SHOWN FOR EXISTING 8" CAST IRON FLUSH MAIN IS APPROXIMATE. VERIFY HORIZONTAL AND VERTICAL LOCATION PRIOR TO MANHOLE SHOP DRAWING SUBMITTAL- 2. SEE DIVISION 1 SPECIAL PROVISIONS FOR CONSTRAINTS AND MILESTONES OF IN -LAKE WORK AND OTHER WORK PRODUCTS_ 3. AVAILABLE HYDRAULIC HEAD LOSS IN THE FLUSH STATION SYSTEM IS EXTREMELY LIMITED. SEWER BYPASSING AND /OR SEWER CLEANING METHODS THAT INTRODUCE SIGNIFICANT HEAD LOSS INTO THE SYSTEM OR SURCHARGE THE SYSTEM WILL RESULT IN SEWER BACKUPS INTO HOMES. CLEANING AND SEWER BYPASSING METHODS THAT RESULT IN SURCHARGING WILL NOT BE ALLOWED. THE CONTRACTOR SHALL AT ALL TIMES CONDUCT ITS WORK SO AS TO PREVENT ANY BLOCKAGE AND SURCHARGING IN THE SIDE SEWERS CONNECTED TO THE FLUSH MAIN. DAMAGE TO EXISTING FACILITIES AS A RESULT OF THE CONTRACTOR'S WORK SHALL. BE PROMPTLY REPAIRED IN KIND AT THE CONTRACTOR'S EXPENSE. S CALL TWO BUSINESS DAYS BEFORE YOU DIG 1- 800. -424 -5555 W z • i ^I N N y ^ 7 _J I b 0� o N 20 0 20 40 o 5111115025111120 T!!!Siiiiiiiia v SCALE IN FEET v 6 K 3 D e AS NOTED 10°° CITY OF RENTON KENNYDALE LAKEFRONT MAY 2003 "$ a — �a�n_!+� � DATUM SEWER IMPROVEMENT - ow.• 1 DRAWING CONFORMED TO CONSTRUCTION RECORDS 12/03 omaa a�wu.sxc l FxO�UE Mp1 Planning /Building /Public Works Dept. 'SITE AND SITE 3 MANHOLE LOCATIONS C3 .: NO. REVISION BY DATE APPR "Pg1pT� " 0C°°a ` 5 -10 gx SCANNED NAR 2 8 2—* Gam, 3a 6s e — 0 ROLL 1 9-, 3' fh FR A i A