Loading...
HomeMy WebLinkAboutS-310003Y SANTARY'SEWER NOTES AND S' CATIONS 1. ALL WORK MATERWS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RMTON UTILITY DEPARTMENT.AND THE LATEST:. EDITION OF': THE WSDOT /APWA STANDARDS AND :: SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE UMITED TO.$:30 A.M! TO ON V Q � 4. ALL LOCATIONS OF IXISTING UTILBIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION'. 50 AS To ........... ...... -.. W Q O SEA. s0 +0329,:-046 RTi :: S.E. .916TH ST. =0 +00 00- =43311 AVOID DAMAGE OR DISTURBANCE ::: :: : '. ::: :::. :: EX - - { - = - .. - ... .. '.OF - - - - :. FIELD -VERIFY - :.... Q T 5. , A. PRECQNSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED PRIOR TO RIM ..: IE B PVC E 416 00 W Z CONTRACTOR. TO ; : :: VERTICAL AND HORIZONTAL LOCATION - - : _ ECUREGALL NECESSARY PERMITS PRIOR TO BE CONSIR�TION.�ONSPECTI N WILL Z. .: : m Q 1- LE 8 PVC W=413.91 436NEV! IE 4141£" B" IN ) BE ACCOMPUSHED BY A REPREMUATNE OF THE CITY OF RENTON): R SHALL BE THE OF EXISTING WATERMAIN PRIOR TO, ANT CONSTRUCTION: P TC CONNIRACTOR .. :. -...: >-' 0 Q .... - . -..:. CONTRACTOR'S RESPONSIBILITY 10 NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN - w a MAKING CONNECTIRIOR ON ADVANCE OF BACKFlLUNG ALL CONSTRUCTION. - . .. Q CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION: AND FOR THE SAFETY OF WORKERS AND OTHERS; ON THE CONSTRUCTION Z Z 8 D.L CAP W 2 iPLUG & 2° TEMP BLOW OFF ASSEMBL ¢ M N7. NEW 10" fGTIY OF RENTON) WATER UN EE BFJNG INSTALLED BY IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY �`� - .. : " : ': STA +2775, 7.50'�LT .. _ {PER an OF RENiON SIDS) CONC. 6LOCKING - .. .. OTHER RELATED PERMITS .PRIOR TO ANY CONSTRUCTION. DEVELOPER.. F RIDGELY, PLAT W -3950 '. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORI.S DEPARTMENT SN - TAKE ... ,.. - . :: " .— PRECEDENCE OVER ALL OTHER PLANS.. q3Q..:. - .:) 9. AOOPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION a .. :..: ? o' ... ..... ... ..._` . 178 TE a -D.I. W - .. - -.. _ ..... .. 4'30 IS i IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN�IAS -BUILT DRAWING OF 1n .. ... .. .. THE I SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A:LICENSED o. PROFESSIONAL' ENGINEER OR LICENSED PROFESSIONAL I SURVEYOR. it d 0 11. BACKFlLL SHAM.'. BE !PLACED EQUALLY ON BOTH SIDES OF, THE PIPE IN DYERS WITH A LOOSE CONCRETE: wT w AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTIi OF, 8 INCHES, I; THOROUGHLY ;TAMPING EACH O..O LAYER TO 95 PERCENT OV,MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND -', SIDE OF THE PIPE OR TO,1HE SIDE OF THE TRENCH. a 3 E- - : .... FOR ONE PIPE DIAMETER ON EACH TO COMPLETE THE FILL OVER PIPE SWILL BE THE SAME AS IDESCRIBED.I ..:. .:.:. - - -: : - :. - .... ... ✓-' �, 12. OPEN CUi ROAD CROSSINGS FOR MMiY: TRENCHES 'ONI IXISITNG'TRAVELED ROADWAY 'OPEN NE1N.8.85'';OUL�E DROP . . . . ::: . : . : . :: :CONSTRUCTION::PRIOR TO CONTRACTOR :::: SHALL BE BACKFlLLED WITH' CRUSHED (ROCK AND MECHANICALLY COMPACTED. I CUTS INTO THE EXISTING, (ASPHALT SHALL BE NEATLINE CUT WITH SAW 1 IN A 'CONTINUOUS. ONE. A. AND U TEMPORARY MIX PATCH, MUST BE PLACED IMMEDIATELY AFTIR BACKFlLL COMPACTION. A PERMANENT ( HOT MIXIPATCH SHALL BE PLACED:'WIHIN 10`DAYS.. AND - - - •� SHALL BE PER CITY OF I RENTON CURRENT STANDARDS. m 13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. a c 41 •c 14. ",J_' DlS URBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE �.. o SATISFACTION. OF THE, DEPARTMENT FOR THE PREVENTION': OF ON -SITE. EROSION AFTER THE STA 2+06 .26 SEWER a P COMPLETION. OF.'CONSTRUCTION. ' 15. ALL PIPE'AND :APPURTENANCES SHALL BE DUD'', ON A. PROPERLY' PREPARED. FOUNDATION IN .. ACCORDANCE WITH SECTION "7 - 02.3(1) OF THE CURRENT STATE'; OF WASHINGTON STANDARD EM 40 8 IN) IE 422.0 8 CHANNEL TO -. IE 4219 8 OU17 S:):.. SPECIFICATIONS `FOR ROAD AND I BRIDGE' CONSTRUCTION. THIS SHALL iNCWDEI NECESSARY LEVELING OF THE, TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT ;AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE .. ... 0 50 TIiAT THE ENTIRE LENGTH OF THE PIPE WILL BE.SUPPORTED.ON A UNIFORMLY DENSE UNYIELDING BASE PIPE BEDDING SHALL BE PEA. GRAVEL 6 INCHES ABOVE AND .BELOW THE - 30 :LF:8 ': PVC. SS : 030%' PIPE.:.:. 16. SANITARY SEWER PIPE' SHALL BE POLYVINYL CHLORIDE'. (PVC) RUBBER GASKETED T ASTM D 3034; SDR -35; OR 'DUCTILE. IRON CLASS'50. r 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE IN PAVED AREA, COVER MUST SLOPE IN ALL ti „ y DIRECTIONS TO MATCH PAVING. 2 3/4" SQUARES SPACED - 3/4" AS INDICATED - HT. 1/8" 0 0 0 11 k °°11 -r ` 0 0 0 x x RAISE -1/2" WIDE BORDER a� ii 0 l0•• 3/4 "�I 5/8.. I 1 15" CAST IRON RING AND COVER Z 0' PIPE MATERIAL AS SPECIFIED to BY THE ENGINEER SANITARY SEWER PROFILE, NOTES I AND DETAILS 6° MINA /... \ MIN" 6 "MI+ / + / - ..MIN. - I- PROPERTY LINE 1/2 BLIND FLANGE AS DAM 3• -0•' MIN. I 1/2 PLUG AS s• -0" D.I.P. TEE CL50 FUTURE ONE LENGTH OF DUCTILE IRON 6" BUILDING SEWER PIPE BUILDING SEWER PIPE (CLASS 50) TO SOlJD TYPICAL � TEE ONE LENGTH, OF DUCTILE IRON 37 BEARING WHEN SPAN MANHOLE \ \ 2" MIN. PIPE (CLASS' 50) TO SOLID w IS MORE THAN 4'. > BEARING WHEN ��SPAN z J 2 "x 4" STUD SERVICE MARKER PAINT UPPER FLEXIBLE JOINT'' \) IS 'MORE ';THAN .4'. TEE WITH G" SIDE OUTLET PORTION WHITE ANS STENCIL ON SIDE -j I r WARDING 'SEWER' WITH 3" HIGH BLACK LETTERS. 6" MIN: AND #6 WIRE WRAPPED AROUND THE STUD AND 6" SIDE SEWER AND BUILDING SEWER w EXTENDED TO THE TOP OF THE STUD. I I � 0 o' UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS FLEXIBLE JOINT WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. 60" ALLOWABLE MAX. VITRIFIED CLAY, PLAIN AND REINFORCED CONCRETE, D1 PIPE AND C1 LH PIPE SEWER MAINS ARE TO BE CORE DRILLED CAST AL' a Q. BACKFILL WITH ORRDUCTILERIRON PIPE PE. COMPACTED MATEERIAL. S ENGINEER 6° MIN: ENGINEER BY BLOCKIND EGNERE E D.I.P. CI.50 I I ♦ y� P�`E 9 WITH MIN. 4 6° MIN. I :ALL PIPE EXCEPT DUTILE IRON. SHALL BE r.�" TnPy"C EA SHACKLE:. RODS : - :CONCRETE ENCASED_ PE MIN SLO 1 1" MAX. CEMENT CONCRETE GLASS POURED IN PLACE p HORIZONTAL CEMENT CONCRETE " .. W SIDE Dur�Er.. TEe, CLASS CBLOCK "' :�, 90' BEND s° MIN. SEWER MAIN L- SEWER'MAIN POURED IN "PLACE _ (TYTON U -651) STANDARD SIDE SEWER INSTALLATION CONCRETE BLOCKING. ANGLE � ._, SEWER MAN TO PROPER "h',LINE BE ` 'DROP CONNECTION FOR SANITARY: SEWERS OF TEE AT MAIN OVER' TYPICAL SIDE' SEWER ELEVATION D.I.P. 90' ND - ( ) 1 CL.50 907 X N TYPICAL -: MANHOLE ( ) FOUNDATION ELEVATION: DUCTILE IRON CONSTRUCTION DROP CONNECTIOND CITY ADOOTR NIT NUTE1 ADOPTED. CONS LTTY OF RENTON DROP CONNECTION ♦ ♦ �otr UNLESS OTHERWISE. SHOWN ON PLAN, SIDE SEWER SHALL. HAVE A MINIMUM. 5' COVER AT PROPERTY ♦ Stana�a pi- Stanaerla nom ,. LINE: OR 3 -5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. 0 IST DATE 12 /15/91 '.IST DATE: 3 /6/95 BY: APPR DWG. NAME: BW78 SP PAGE-B075 DATE REVISION': DWG. NAME: BR39 SP PAGE: 8078 DATE REVISION BY APPR D 12" B FIBER PACKI svb3l I° v f W - J?/®a ) ..... ......... .... ...... x sSUH ..._...... ......... ...... - .....--- ------.. - ----- - -- ---... .... . -.... ............. ......... ...- ........... ...... -.. SEA. s0 +0329,:-046 RTi :: S.E. .916TH ST. =0 +00 00- =43311 ... ... `�' ::: :: : '. ::: :::. :: EX - - { - = - .. - ... .. '.OF - - - - :. FIELD -VERIFY - :.... GRADE ® -q ... S E 116x-1 ST. .. - . .. .. ... .. - .. . w .:. .. . ... . RIM ..: IE B PVC E 416 00 ... i CONTRACTOR. TO ; : :: VERTICAL AND HORIZONTAL LOCATION - - : _ I STAL .. - - Z. .: : LE 8 PVC W=413.91 436NEV! IE 4141£" B" IN ) OF EXISTING WATERMAIN PRIOR TO, ANT CONSTRUCTION: P TC CONNIRACTOR .. :. -...: STA. 2+0528 750 LT. - . - 1 8 VERTCAf CROSS IIwNG�. ( ) .... - . -..:. M°o - - w a MAKING CONNECTIRIOR ON 2 8 PLUGS MJ� - 4 SRBu CF�K Y I - . .. _.{ 1. : y4 - - 8 D.L CAP W 2 iPLUG & 2° TEMP BLOW OFF ASSEMBL ¢ M NEW 10" fGTIY OF RENTON) WATER UN EE BFJNG INSTALLED BY .: _ �`� - .. : " : ': STA +2775, 7.50'�LT .. _ {PER an OF RENiON SIDS) CONC. 6LOCKING - .. .. o DEVELOPER.. F RIDGELY, PLAT W -3950 '. .. 4� L_F 8 Age -j) ... ,.. - . :: " .— .. q3Q..:. - .:) ..:.. _ -.DJ --W °0 ...Q :. _ - 6-GATE VALVE -(FlxW) .. : �6 D.L EXTENSION a .. :..: ? o' ... ..... ... ..._` . 178 TE a -D.I. W - .. - -.. _ ..... .. 4'30 E 1 -5 1/4 MVO F.H.'. ASSY 1n .. ... .. .. GOING., . BLOCKING CONCRETE: .. CLASS 3000 .. .. - - . 425 ... - :. .. -... . .. ! .... - : .... - CONTRACTOR TO FlEID VERIFY ... :. VERTICAL.AND HORIZONTAL LOCATION: :.:.. :.- _ .... OF F)05DNG SAN.: SEWER! PRIOR'. TO ANY..... ..:. .:.:. - - -: : - :. - .... ... .... -.:. 425 ... ..... . 30 NE1N.8.85'';OUL�E DROP . . . . ::: . : . : . :: :CONSTRUCTION::PRIOR TO CONTRACTOR :::: PE ' DEFAII.'THIS:SNEET ...: - - .:. - - - - - - - MAKING'.�CONNECTION :.:...... ... .. . . 42Q .. - ..:. 420 NEIN<� STA 2+06 .26 SEWER :: .. P 0 +3120 SEWER .. - RIM =4300± .. EM 40 8 IN) IE 422.0 8 CHANNEL TO -. IE 4219 8 OU17 S:):.. .:: IE 4209:8° OUT) .. .. .. ... .. 30 :LF:8 ': PVC. SS : 030%' 415 �P F 0 W 2 vla 3975 ��p 0+00 1+00 2+00 �Q- S /ONA 1 SANITARY SEWER PROFILE VIEW EXPIRES 6 10 -03 SCALE: 1"=20' HORIZONTAL 1"_5' VERTICAL �,,. CITY OF RENTON 00 I DEVELOPER DEPARTMENT O'. F PUBLIC WORKS ^: ;: Si1NE BALYEAT'; -_-_ �i....HAI: 1