HomeMy WebLinkAboutS-3149290)
It
C+)
O
0
Uj
I--
c
RIM ELEV,
SEE TABLE
1. PLAIN END PIPE SHALL BE
USED FOR PENETRATION OF
MANHOLE WALLS.
MANHOLE ELEVATION DATA
STATION
RIM
IE IE IN
DIRECTION
96" IE
HETNO.
a p•
.
BELOW
R02 -3
LOGAN 48 +13t
-
10.40
10.65
E
W
7,65
R02 -5
LOGAN 56 +80t
31.02
±11.99
E
8.85
K RE N SEAL BOOT)
o
Q
11.85
W
R02 -7
PARK 46 +60f
29.07
113.17
SE
9.50
3350 .Monte Villa Parkway
Bothell, Washington 98021 -8972
(425)951 -4800
(425)951 -4808 Fax
whpacific. com
NOT TO SCALE
BHC Consultants, LLC
720 Third Avenue, Suite 1200
Seattle, Washington M04 -1820
Tel: (206) 505 -3400
CONSULTANTS Fax: (206) 505-.3406
Fonnedy a Division of Berryman 8 Henigar
C/L
EX CONC
ENCASEMENT
AT M H
U06s'U24
-,m
r � r i� � rrr ••,� �r
r
•
EX PIPE: AND ENCASEMENT
SHALL BE CORE DRILLED
FOR KOR—N --SEAL BOOT
WITH STAINLESS STEEL
WEDGES (DIST BY HANSEN
PIPE PRODUCTS)
CUT THROUGH EX 1"
STEEL PLATE USED FOR
SHORING MIN 3" BEYOND
PIPE. BACKFILL CDF MIN 3'
EITHER SIDE OF NEW
SEWER C /L, AND TO 1'
ABOVE NEW SEWER
FLEXIBLE JOINT,
PUSH --ON
12" OR 15" PVC
SEWER AS NOTED
ON PLANS
0
NOTE: SEE "METRO SEWER
NOTES" ON DWG U00 FOR
CONDITIONS THAT APPLY
TO THIS WORK
. I
NEW SEWER CROWN TO MATCH
SPRING LINE OF EX METRO
SEWER PIPE, OR WHERE EX �-
PIPE CONN EXISTS, REMOVE EX O_
PIPE AND CENTER NEW CORE
DRILL HOLE ON EX HOLE o ""
CONNECTION AT N 8TH ST DETAIL
�w■rwwp .r�.lr■.■■ir.rnr�■�� n ir■ �r.r � ■ i ■ �■�n�■ i rr� �■■�. ■ i � ..r�r■�r� r ■ r.� i r r i i n ��� ri�■n i i �� wr ■■■��■■
NOT TO SCALE
Sm:
AS SHOWN AU 00 N3/101 CITY OF
RENTON
I ow Im I DATU M
a W.ME Planning/Building/Public Works De
F Nor ow r" t.
P
SC" ACCORDNW
4wX 0
CITY OF RENTON .
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
METRO SEWER CONNECTION DETAILS
4/17/06
Pm:
mwm W.
U28
sN 110 204
EX 96"
SEWER
p
a
a p•
.
CORE DRILLED HOLE
-
A I
(SIZ TO MATC H
A p a
K RE N SEAL BOOT)
o
Q
EX PIPE AND ENCASEMENT,
-
a �
• .•
SHALL BE CORE DRLLED
g
FOR KOR -N -SEAL' BOOT
Q
WITH STAINLESS STEEL
a
WEDGES (DIST BY HANSEN
a
PIPE PRODUCTS)
p
CUT THROUGH EX STEEL
_
NEW SEWER CROWN TO MATCH
a �
SHORING /FORMING AS
SPRING LINE OF DC METRO
.
NOTED ON DETAIL 2/—
SEWER PIPE, OR WHERE DC
PIPE CONN EXISTS, REMOVE EX
FLEXIBLE JOINT,
PIPE AND CENTER NEW CORE 4
PUSH —ON
DRILL HOLE ON EX HOLE �j
�
12" PVC SEWER
�
D
12" IE,
SEE TABLE
p t
Q
2' TO 3'
f1' -4"
.
i
O'
r
I 96"
IE
C/L SEE
TABLE
METRO
SEWER MANHOLE CONNECTION
DETAIL
3350 .Monte Villa Parkway
Bothell, Washington 98021 -8972
(425)951 -4800
(425)951 -4808 Fax
whpacific. com
NOT TO SCALE
BHC Consultants, LLC
720 Third Avenue, Suite 1200
Seattle, Washington M04 -1820
Tel: (206) 505 -3400
CONSULTANTS Fax: (206) 505-.3406
Fonnedy a Division of Berryman 8 Henigar
C/L
EX CONC
ENCASEMENT
AT M H
U06s'U24
-,m
r � r i� � rrr ••,� �r
r
•
EX PIPE: AND ENCASEMENT
SHALL BE CORE DRILLED
FOR KOR—N --SEAL BOOT
WITH STAINLESS STEEL
WEDGES (DIST BY HANSEN
PIPE PRODUCTS)
CUT THROUGH EX 1"
STEEL PLATE USED FOR
SHORING MIN 3" BEYOND
PIPE. BACKFILL CDF MIN 3'
EITHER SIDE OF NEW
SEWER C /L, AND TO 1'
ABOVE NEW SEWER
FLEXIBLE JOINT,
PUSH --ON
12" OR 15" PVC
SEWER AS NOTED
ON PLANS
0
NOTE: SEE "METRO SEWER
NOTES" ON DWG U00 FOR
CONDITIONS THAT APPLY
TO THIS WORK
. I
NEW SEWER CROWN TO MATCH
SPRING LINE OF EX METRO
SEWER PIPE, OR WHERE EX �-
PIPE CONN EXISTS, REMOVE EX O_
PIPE AND CENTER NEW CORE
DRILL HOLE ON EX HOLE o ""
CONNECTION AT N 8TH ST DETAIL
�w■rwwp .r�.lr■.■■ir.rnr�■�� n ir■ �r.r � ■ i ■ �■�n�■ i rr� �■■�. ■ i � ..r�r■�r� r ■ r.� i r r i i n ��� ri�■n i i �� wr ■■■��■■
NOT TO SCALE
Sm:
AS SHOWN AU 00 N3/101 CITY OF
RENTON
I ow Im I DATU M
a W.ME Planning/Building/Public Works De
F Nor ow r" t.
P
SC" ACCORDNW
4wX 0
CITY OF RENTON .
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
METRO SEWER CONNECTION DETAILS
4/17/06
Pm:
mwm W.
U28
sN 110 204