Loading...
HomeMy WebLinkAboutS-318803r-. 1 ` rr, S v 1 00 00 roo CA M � r c� 1 '0 N � c a w L -w 4 z 9 Z W } g M1 a i 0I u1 I Ti I �l I NI J 1 �I u1 3� �I JI Lai Q'I M, N rl I W, n� i' i i I i i I I I I i I i i i I i i I � W f'o - CL-6i I I o L- 8 Cv STA. 5 +65.78, 18.00' LT. O p o'E • � 3a RIM = 246.20 .0 W D.I. I W II I I I I 1 - 8" G.V. (FLxMJ) IE = 238.40(E) U II 'V E W SSMH S� H RIM = 244.58 mE 11 RIM = 252.60 l.� Al 1 1 � W f'o - s c I } I i� _6 "-W CL-6i I I o L- STA. 5 +77.78, 6.00' LT.11 1 - 8" 45' BEND (MJ)II STA. 5 +65.78, 18.00' LT. O p o'E • � 3a RIM = 246.20 .0 W D.I. I W II I I I I 1 - 8" G.V. (FLxMJ) IE = 238.40(E) w II 'V E IE = 238.30(W) SSMH S� H RIM = 244.58 mE 11 RIM = 252.60 IE = 238.13(E -S -N) Al 1 1 •c mm IF = 238.03(W) on s c I } I i� _6 "-W O ^ p R" SS O 8" SS ° It Z g" � B" - S U -8 --W 17.0 LF 8"� D.I. W UP SSMH GA ZZ� RIM = 242.61 �"" -� SD IE = 234.16(E) IE = 234.06(W) •I I I STA. 5 +77.78, 6.00' LT.11 1 - 8" 45' BEND (MJ)II STA. 5 +65.78, 18.00' LT. SSM11`4 O I I UP `i 1 - 8" 45' BEND (MJxFL) RIM = 246.20 D.I. I W II I I I I 1 - 8" G.V. (FLxMJ) IE = 238.40(E) w II CN - BLOCK IE = 238.30(W) SSMH S� H RIM = 244.58 "1 SD - -- - ° EMOVE EX. 8 TO SOUTH 11 RIM = 252.60 IE = 238.13(E -S -N) II IE = 247.05(E) IF = 238.03(W) WV FH II IE - 246.95(W) ` 11 Z ! 12" -W I _ 12„ W STA. 7 +34.61. 6.00' LT. I I _ . 1 - 6" G.V. (FLxRJ) I I > NE. 24TH STREET 18.5 LF 6" D.I. I I -- - O -- - - N CA O ^ p R" SS O 8" SS ° It Z g" � B" - S U -8 --W 17.0 LF 8"� D.I. W UP SSMH GA ZZ� RIM = 242.61 �"" -� SD IE = 234.16(E) IE = 234.06(W) •I I I STA. 5 +77.78, 6.00' LT.11 1 - 8" 45' BEND (MJ)II U, 1 - BLOCK" O I I UP 00 I 156.8 LF ,13" D.I. I W II I I I I - I I 11 II w II zi II w I 11 Z II Q I II W 7 11 Z ! 0� STA. 7 +34.61. 6.00' LT. I I 1 - 8" TEE (MJxFL) . 1 - 6" G.V. (FLxRJ) I I 00 18.5 LF 6" D.I. I I 1 - F.H. ASSY. J 1 - BLOCK COON NPI PE Nf1�,CTl (NO CORE DRILL) 30.6 LF 8" L \� D.I. W I I I STA,\ 7 +65.20, 6.00' LT. 1 - \Ib"x4" TEE (MJxFL) I ` i I 1 ��" G.V. (FLxMJ) I I 1 - BLOCK 8 I i ! I I I ! 116.1 LF 8" -, D.I. W I Lr� I i 00 I i I I j 1 I I 4 Ilk + - •� t I i i �Z9.43''�' c� --� f 39.33�N1 !\� STA. 8 +81.32, 6.00' LT. 45' BEND (FL) 1 - BLOCK - I wwp ,gyp . -*#& WV x 8 -�-- SS V) M wl SS WV r 4 • :04 , 4 to! }- , 1 a • I 0 PVLT GAS --�- IP WM + 239.76' W �� ± ` _ITELR �L %.4 -- 0 UP 00 N 8� 7 16 E 85. iS 6 >.U1 T.T. ..0� T.T ALI IE= 247.67 V) IE= 247.99 W. M . TO Id L = 23.19' EX. HOUSE, EX. SS TEST TEE. i -- - RE -USE FOR LOT R - 15.00' -RE -USE - -- - 6 0 FOR LOT 8�FIELD VERIFY Z I I I ,t (VERIFY CONDITION) A LE TO DET PMiN I " IE =2 9.13 �' (TYp) OT 1 � 3/4 MIN.) �_ . _._- LOT 9 Q 0 +59 T.T. I ° I . w NEW f" PVC SSS FF = 249 o I _� LOT $ FF = 259 ' co -, a� FF - 254 I v I I ® 2% MIN. ( W d r4 J EXTEND COPPER TAIL PIECE u4 I u I REMOVE EX. •.. I o Z " TO 1 -FOOT PAST P/L (TYP.) 0 6 PVC SSS Q 3/4 _ _J BETWEEN EX.--- - J W.M. (2) 589'07'16 "W T. T. & EX. I C.O. i v i . 85 EX. 6" C.O. ; RE -USE FOR NEW 6" PVC SSS ® ' LOT 7 ` 2% MIN. 14 100 I �' r 66.11' P6.12 C. 1 o I I I00 N8y'v i ' i 61 04 3 1 I STAIRS 1TT LOT2 ( _ + 11 W K PVS, SSS •• r - % ON. 4 FF = 249 I oI O rn - 4 I L 1. _ LOT 7 • S89'07'16 "W 2,521 SO.r i. HOUSE GM O I 103-1 y• -_ - i (18.34 LOT COVERAGE) I w I I N LOT 3 I :7 _ S$CO I 14 6. +6 I T.T. NEW (G" PVC SSS 3.6 I I DECK (UNCOVERED) ® 2% MIN. FF = 249 (q USTI 0 •03/4 I ADE) SSCO Ll M' STA. 7+ 34.61, 24.50' LT. I.E. = 248.5 RIM = 256.7 F.H. ASSY. ' ) 'NE W\6 �''�!C SSS � (ADJUST TO GRADE) ®\2��MIN� I.E. = 251.5 N89007'1 6 E 150.09 - _ _ -- W.M. I- + .C.o. SSCO I 23 6 -T 0 O -' RIM - 258.8 to SS UTILITY EASEMENT N 89'01' 16 "E i 04.8 4' Z - -f--}= `- rq 93.66 0 11.18' �I :�' ADJUST TO GRADE) I.E. = 253:8 187.6 LF 47 D.I. W. STA. 11 +93.60, --- -4 5.00' R T. " FF = 262 ... W. M. //4 - 2" PERMANENT • WM• B. V. ASSY. 1 1 - " CAP (M J) I i SSCO 1 - B CK LOT 6 RIM = 256.8 I (ADJUST TO GRADE I I I SSCO 00 � - I.E. = 251.8 � I I RIM 253.8 � j I (ADJUST TO GRA�E) \ s� I I.E. = 248.8 �,5, I I I I LOT 5 �% • \ i STORM TRACT LOT 4 �, �, FF = 257 i I - -- - \ i FF = 252 I II II I I L I I/� i' VVV I I I va 111 I II - 9 3.6 I STA. 8 +90.32, 15.00' LT. N 8910'27" E 254.77' _ I 1 - 8w 45' BEND (MJ) 1 - 6 G. V. (M J) 1 - BLOCK .I V, 1A REMOVE EX. 8" PIPE SECTION TO NORTH ot vv n V SEE TESTING DETAIL �-i r-- x UNDERGROt D K11 LOCAnOW sASUD ON SURFACE FCA7 UU& ACTUAL L )CATroM MAV VARY. I OOINMM TRAT TWE L.00ATIIDIMS, M"ATK MF, DEPTHS, AND Ate(= COhOdEM REFLEC'11NG PAATERIALS AL"MALLY USPD DLliLROG 0UIN3TI UCT10H. ACCT IRATELY REPL&oC TS EKIS7.NG FIELD Cc �NtXI'XIIIIIII!! AS OE?ER DFA MY DIRFk*T 55I1;,1:0V:SION 0N. 7M DATE. _ 12 " -W 3/4" W.M.(2) O rn CV I IW Lo 00 N °o I•i 41h. -Sho • E X. 8" D. I. W. /11 NEW 8" D.I. -� 10' t 8 "x8" VERTICAL CROSS FOR POLYPIGGING (SEE DETAIL) / S♦ 2" TEMP. BLOWOFF ASSEMBLY `Z` p 8" SS ° LSSMH RIM = 265.33 UP IE = 248.08(E -S -N) C` OTFI R IE = 247.98(W) RECONNECT W. SVC. TO EX. HOUSE ROLL 200 FR39� EX. 8" D.I. W. -/1 NEW 8" D.I. GRAPHIC SCALE 20 0 10 20 40 m = ( IN FEET ) I inch = 20 ft CUT AND CAP OR REMOVE EXIST. 8" W I rll-� TESTING DETAIL FINAL CONNECTION DETAIL FINAL CONNECTION AFTER ALL TESTING, DISINFECTION AND POLYPIGGING, REMOVE TEMP. BLOWOFF AND CONNECT TO EX. 8" WATER MAIN WITH: 45' BEND (MJ) 8" SLEEVE 8" GATE VALVE D! SPOOLS TO FIT WATER MAIN CONNECTION DETAIL NITS TEMPORARY 2' GALVANIZED PIPE AND 2' GATE VALVE FINISHED GRADE ELEVATION zO or or or or INSTALL 2' PLUG ON TOP BLIND FLANGE AFTER REMOVAL OF POLYPIG 3 FT MIN. COVER (10 -INCH DIAMETER AND UNDER) 4 FT MIN. COVER (12 -INCH DIAMETER AND OVER) NEW WATER MAIN POLYPIG .44 i EK!:i AL r-POSS r DR '= 'DLYPiGGINr STATION SIZE Or vERT:CAL CROSS SHALL BE 'ME SAME AS SIZE OF MAIN LINE VERTICAL CROSS (MJ X rL ONE BLIND FLANGE ON TOP OF CROSS WITH 2' TAP L 2' TEMPORARY BLOW -OFF ASSEMBL Y (REMOVE BLOW-OFF ASSEMBLY AND INSTALL 2' PLUG AFTER REMOVAL OF CLEANING 'Pay -PIG'' 7NE BLIND FLAWjE ON BOTTOM OF CROSS ONE PLUG (MJ) ON END OF CROSS -pNCRE'L BLOCKING ALL DEBRIS AND "OLYpIGS SMAL: BE REMOVEL, rRO►M SUMP OF VER'ICA; CRMS BEFORE DISINFECTION OF NEW WATER MAIN WATER MAIN POLYPIGGING STATION RECOMMENDED VERTICAL CROSS FOR POLYPIGGING FO APPROV L ; BY VIAL Il�dfo�t VI BY CHECKED FOR COMPLIANCE TO CITY STANDARDS �✓ Dote i ply Dote 11. , Dote ���, • • DALEY- MORROW- POBLETE, INC. � ' E L J 3) - 33...1-22 0. 3- �3� -,�..6 L Iona) .AND SLVVYEYM •. • �� - - -. - _ -__._ __. _J __. EAPIRE5 9 jAN 2 00 -.,,o W.- „4r. "LEcc wwr 0 SCANNED APR Z Z "i L 4