Loading...
HomeMy WebLinkAboutS-322001N GJ 9 3 ka a d C OZ .FA C T3 -- > X m Lv C _O 3 °' N C (n _C: Cn O U N N -Y _ O Z7 >, N CK) Q� i • Q) 0 Z Q) V) n C D C/7 CL v C)Q 0 3: >-4z E-4 a !"MAN c m c �i a 0 Va* Map NOTTOSCALE Lob MMiVim►, Project LoCatk Horizontal Control NOT TO SCALE N 01046'15" E 664.81' 0 I IT I I / Z 91 FND MON IN CASE SS -3 1i W/ BRASS NAIL SS -4 NORTHWEST CORNER OF 5 -23-05 CITY MON 11886 12 -29 -04 O FND MON IN CASE W/ BRASS PIN CITY MON #1836 12 -29 -04 1� MON IN CASE NORTH 1/4 CORNER OF 5 -23-05 CALC PER CITY N OW05520 W 2633.59' % r FOUND MON IN CASE CL OF LAKE s WASH. BLVD N 7 -27-04 FOUND � �l IN CL OF �58.52' w�. e�w 1514.70' 7 -� -04 =%32' 28' 29' �n W N O Pi of tig 824.71 N W51 W N NON NI CASE ON SOUTH L11E CALL PER R06 * Checked for Compliance to City Standards Wwp •J�'l2J0 MON IN CASE Ensr 1/4 CORDER OF 5 -23-05 cwc PER CRY W R N b� O 2 MON IN CASE SOUTH 1/4 OF 5-23-06 GILC PER R06 S WM'Od" E 2849.45' MON( N CASE SOUTHEAST CORNER 5 -23-06 CHILD PER CITY CO N g Surveyor sADLER- BARNARD it Assoc. INC. 12714 VALLEY AVE. E. SUITE B SUMNER, WA 98390 (253) 826 -8135 CONTACT: MIKE LUNA Site Benchmark R/R SPIKE SET IN PIOWER POLE AT SOUTHWEST CORNER OF SITE a -51.60 01�-:o If: 11 D-:7-I - :4� i ea 'IT, 8E 1/4, 81N 1/4, 5 SEC., T23.N,, R 5 E-4 W.M. Vertical Datum cmr OF RENTON BENCHMARK #2177 ae ew►ss DISK AT TMe Nw CORNER OF CONC. BASE OF sIGAAL BRIDGE AT THE R/R CROSSING AT THE NORTH ENTRANCE OF OOULON PARK EL= 37.254 FEET w►w ee Bade of �81"n0 RECORD OF SURVEY AS RECORDED UNDER RECORDING NUMBER 9901159003, RECORDS OF THE KING COUNTY AUDITOR (ROS) NORTH 75 FEET OF LOTS 312 THROUGH 315 OF THE PUT OF CD HILLMAN'S LAKE WASHINGTON GARDEN OF EDEN, DIVISION NO. 5, RECORDED IN VOLUME 11, PAGE 83 RECORDS OF KING COUNTY, WASHINGTON. TOGETHER WITH THE SOUT'HE RLY 30 FRET OF MORGAN AVE. (TO BE VACATED) CM Shmt Irmlex SS -1 COVER SHEET SS -2 SANITARY SEWER DXTENSION PLAN AND PROFILE SS -3 SANITARY SEWER EXTENSION DETAILS SS -4 SANITARY SEWER D(TENSION DETAILS ROLL 1'9�� Cmetwhon Sequence 1. BEFORE ANY CONSTRUCT ON OR DEVELOPMENT ACTIVITY, A PRECONSTRUC10 MEETING MUST BE HELD BETWEEN THE CRY OF RIENTON, 1HE APPLICANT AND THE APPLICANTS CONSTRUCTION REPRESENTATIVE. 2. VERIFY VER?ICAI. AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UnLITES, CONTACT ALL UTILITY COMPANIES THAT MAY BE EFFECTED BY THE PROPOSED CONSTRUCTION. THE ONE CALL NUMBER IS 1 -B00- 424 -5555. 3. MAINTAIN ALL EXISTING UTLITY SERVICES DURING CONSTRUCTION. 4. VERIFY GRADES PRIOR TO CONSTRUCTION. FLAG CLEARING LIMITS. 5. INSTALL STABILIZED CONSTRUCTK)N ENTRANCE. 6. INSTALL FILTER FABRIC FENCE AS INDICATED ON PLAN. 7. INSTALL OFFSITE CATCH BASIN PROTECTION. 8. CLEAR W GRUB AREAS OF THE SITE TO BE ROUGH GRADED OF FILLED. 9. CONSTRUCT SEDIMENT INTERCEPTOR SWALES AND CHECK DAMS. 10. REMOVE UNSUITABLE BEARING MATERIAL AS REQUIRED. 11. GRADE AND PLACE ACCEPTABLE FILL AS REQUIRED AND COMPACT ACCESS DRIVE SUB -GRADE AS INDICATED ON THE DRAWINGS. INSTALL STORM CONVEYANCE SYSTEM. DIRECT ALL SURFACE (MATER TO THE PROPOSED CATCH BASIN. NO UNCONTROLLED SURFACE WATER SHALL BE ALLOWED TO LEAVE THE SITE AT ANY TIME DURING THE GRADING OPERATIONS. USE CATCH BASIN SEDIMENT FILTERS TO CAPTURE SEDIMENT PRIOR TO DISCHARGE. 12. INSTALL NEW UTILITIES PER THE DRAWINGS. A. WET TAPS TO THE CITY OF RENTON WATER SYSTEM 9i ALL BE MADE BY A CITY APPROVED SUBCONTRACTOR. B. THE CITY OF RENTON SHALL INSTALL THE DOMESTIC WATER METERS, 13. FINISH GRADE SITE AND CONSTRUCT ASPHALT PAVING AREAS, ACCESS DRIVES SIDEWALKS, CURBS AND GUTTERS. 14. COMPLETE STABILIZATION IN ACCORDANCE WITH LANDSCAPE PLANS. 15. REMOVE EXCESS EXCAVATED MATERIALS, TRASH DEBRIS, AND WASTE MATERIALS AND DISPOSE OF IN AN AUTHORIZED LOCATION AT NO COST TO THE OWNER. 16. CLEAN STORM DRAINAGE SYSTEM OF ALL SEDIMENT AND DENS. 17. REMOVE TEMPORARY EROSION CONTROL FACILITIES WHEN SITE IS COMPLETELY STABILIZED. Erosion Control Motes 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND POTENTIAL. FOR ON-SRE EROSION HAS PASSED. THE IMPLEMENTATION, MMNTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE POWM 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAINING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO FEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL. CONDITIONS DICTATE, THE PERMI TEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE DURING THE COURSE OF CONSTRUCTION, R SHALL. BE THE OB!"TION AND RESPONSIBILITY OF THE PERM! I I TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CRFATED BY HIS ACMES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMIENITS, AS MAY BE NEEDED TO PROTECT ADJACENT AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN LS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT aWTII'UTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, REST RICTOR% CHANNELS,, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LENT UNWORKED FOR MORE THAI TWELVE (12) HOURS. SHILL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED ARM MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THE SIEP I D R INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT 5 IN THE INTEREST OF THE PIERMIIlEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING,, OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SUM TIME PERIOD. 8. FOR ALL EROSION /SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES„ A FENCE, A MNNNMIUM OF 3 FEET HIGH IS REQUIRED, WITH 3:1 SIDE SLOPES 9. A TD AWAY GRAVEL CONSTRUCTION ENTRANCE, 24' X 50' X 8' OF 4- TO 6- INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR MIGRESS AND EGRESS TO THE CONSTRiUCTO SITE. 10. THE CITY OF RENTON INSPECTOR MAY REQUIRED ADDITIONAL. EROSION CONTROL AT ANY TIME AS NECESSAAY. Sanftary sewer Notes and SoecYicatione 1. ALL WORK MATERIALS SHALL BE IN CONFORMAXE WITH 1HE STANDARDS AND SPECFKATIONS OF THE CITY OF RENTON UTMJTY DEPAI rMENT AND 1HE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECf1GTI0NS. 2. THE HOURS OF WORK IN THE STREET RI%(T OF WAY SHALL BE LWNTED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE R ANNING/BUILDING /PUBIC WORKS DEPARTMENT AT 235 -2520. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE RANNNING/ BUILDING /PUBLIC WORKS DEPARTMENT 72 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FRE DEPARTMENT, AND 911 SMALL BE NOTIFIED 24 HOURS IN ADVANCE OF ANY WORK IN THE TIGHT OF WAY. 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 'STANDARD SPECIFICATIONS FOR MUNICIPAL. PUBLIC WORKS CONSTRUCTION* PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITES SHOWN ARE APPROXIMATE AND R SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECIESSSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (NSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S DWJB LITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BAC:KFIL LING ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE C ONNSTRUCt10N SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLAINS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT, SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 9. A COPY OF THESE APPROVED PUNS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUST DRAWING OF THE SANIITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DIENSff. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 12. OPEN CUT ROAD CROSSINGS FOR LMLITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND IiEDMICALLY COMPACTED. CUTS INTO THE EX5M ASPHALT SHALL BE NEATUNE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13. DATUM SHALL BE CRY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1 ) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONMOON. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNNFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL C ABOVE AND BELOW THE PPE. 16. SANITARY SEWER PPE SHALL BE POLYVINYL CHLORIDE ( PVC) RUBBER GASKf. M ASTIR D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17. IN UNNMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FN6,SH0 WADE. IN PAVED AREA COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. Call 3 Working Days Before You DIG! 1- 800 - 424 -5555 FFL 41,4. S- 3 ? ?n01 LPD ENGINEERING, PLLC 7936 SEWARD PARK AVENUE S. SEATTLE, WASHINGTON 98118 PH: 206.725.1211 FAX: 206.725.1211 J. 0 wAS,yI AI STv L ,2S 1 EWIWS 9/ +4 /MM Kennydale Cafe Sewer Extension 1322 Lake Washington Blvd 01 -25 -05 Sanitary Sewer Notes and Details SS-1 1 4