Loading...
HomeMy WebLinkAboutS-323517BAND CLAMP BAND CLAMP ANVILFIG. TYPE 2T2 PIPE -CLAMP WITH GALV. FINISH SIDE VIEW TOP VIEW OR EQUAL SPLIT AT SPRINGLIKE. SPLIT AT SPRINGLIKE - - CLAMP ID 14 "'MINTO ALLOW :PIPE TOSLIDE THRU CLAMP. o Qo o FABRICATE (4) 1/4" PLATE ASTM A36 STEEL GALV. AFTER FABRICATION PER ASTM A723. 12 ":HDPE PIPE � COMPACTED CORNERS 1/2" FILLET COLLAR (2" PIPE ARRANGE HOLES TO FIT WELDED TO STAKE) - (OD ^- 12'75) BACKFILL BAND CLAMP AND CABLE ENDS. 3/4" BOLT, FILLET 1/2" TYP p�pE CABLE END / NUT, WASHERS � F, EACH SIDE o OO 3/4" DIA. FOR CABLE - 7/8 Di °' 2 DI °. � 1`�p �' I PLATE �'y BOLT FOR r/ � �, FOR PIPE PENETRATION as 4' SEE HDPE CONNECTION CLAMP. (TYP) � � - - �- - DETAIL THIS SHEET - CHANCE CHAIN SHACKLE • • W4�•(.� °e sy� • � � ,;:; ��� i 0p 00 0000 00 0p00000 ° e0 ° ° O •0 . EX. PAVEMENT � /// \ \i � SAW CUT L BAND CLAMP, SEE DETAIL pVp� �0 \\ \ � MATERIAL �' �" ° � �7 /B,.J— 4 164;%2. 6 "MIN. CLAMP TIGHT TO PIPE, ��pF. ��' ,BEDDING MATERIALS TENSION CABLES. I I��I 3/6" GALV STEEL CABLE, �� �� SHAPE PIN PLATE DETAIL TWO CLAMPS EACH END, TYP. 1 =11 - TO A POINT - I _�I I 1/4" PLATE ASTM A36 STEEL BAND CLAMP (TYP) _ �I � GALV. AFTERFABRICATION PERASTM A123: 1111 III- CHANCE ANCHOR (TYP) - CONFIRM THAT PLATE WILLMATCH CLAMP FITTING AND BOLT DIMENSIONS - _� 11 -III- II III I BEFORE FABRICATION. 10 1�" X 8' PIN PILE EACH -SIDE _ _ ' - ASTM A36 STEEL GALV. AFTER.FABRICATION PER ASTMAT53. PIPE ANCHOR DETAIL NTS : TOP SLOPE ANCHOR w! PIPE CABLES DETAIL NTS 17Yz" DIA. CORE DRILL �� THRU CB WALL - III r -I II'I NON- SHRINK GROUT - 1- 'll T� NEW PRECAST = I/12" FLANGE ADAPTER II - NEW PRECAST MANHOLE SECTION I' � 1= 12" HDPE PIPE _ � I MANHOLE BASE II I 1� SECTION l _. _DRILL 6 1Ye" DIA. HOLES � I I - I I I� COMPACTED BEDDING' TO MATCH BOLT PATTERN z ] � II 24 "TYP` 1= 24 "TIP .1 E TI J1,I FABRICATE 1Ya" GALV. STEEL FLAN )�' � °' �� _ 24Yz' OD, 14" CENTER HOLE 21Yz" BOLT CIRCLE, MANHOLE _ i( - -� - - _1 - -��- n - _��_ 6 EVENLY SPACED tYfi" DIA. HOLES `" 6 -7/a "0 BOLTS LENGTH AS REQ'D., 14" ° F� NUTS &WASHERS a DETAIL NOTES: 3 z 1. CONTRACTOR SHALL CONFIRM ALL FITTING DIMENSIONS, u BOLT SIZES AND LENGTHS. ANY CHANGES SHALL BE `v SUBMITTED TO TH'c CITY FOR APPROVAL. a S 2. ALL BOLTS SHALL BE HEX HEAD, SAE GRADE 2 °o CORROSION RESISTANT STEEL. i N 0 3. ALL ELBOWS AND FITTINGS SHALL BE FABRICATED � TO THE PIPE MANUFACTURER'S SPECS. 4. USE NON- SHRINK GROUT TO FILL VOID SPACE BETWEEN a FLANGE AND OUTSIDE OF MH WALL. z 5. CHANNEL MH PER CITY STANDARDS. HDPE CONNECTION DETAIL � NTS 0 N O WK ;J S Roth Hill Engineering Partners, LLC s ^ 2600 1161h Avenue NE #100 _• Bellevue, Washin ton 98004 R ®th'II g � Tel 425.869.9446 � ®„/ Fax 425.669.1190 ELBOW COMPACTED BEDDING g SSMH. 18 12" HDPE SPOOL DETERMINE LENGTH IN FIELD TO FIT PIPE TO SLOPE, 2� MIN. CHANNEL MH PER CITY STANDARDS. 12 "SSMH CONNECTION DETAIL NTS 4" MAX. COMPACTED THICKNESS AC PAVEMENT, CLASS B (PATCH OVER TRENCH, MATCH EXIST. PAVEMENT THICKNESS) 6Yz" MIN. COMPACTED THICKNESS CRUSHED SURF�4�ING HDPE SEWER MAIN) ��- / ��� "�' " "• ���'�"� j ��P NADISTURBEDJ �; -III. =�T IVE j 1� "- - � - _,_,.III � - MATERIAL -111 -1 1 =11I- I =1 t 17 =rn m m COUPLING (TYP) HDPE SEWER MAIN qg" MIN. 12'SDR 35 12 "SDR 35 UNLESS OTHERWIS '- PVC SPOOL PVC SPOOL APPROVED BY' 4 "- 6" COMPACTEDCONCRETE OR SAND COLLARMH THE ENGWEER .BEDDING MATERIAL ADAPTER FOR PVC PIPE (TYP) ELEVATION INSTALLATION PROCEDURES: 1.. EXPOSE &REMOVE EXISTING PIPE. 2: SET MANHOLE &PVC SPOOL PIECES IN PLACE TO PROPER ALIGNMENT & GRADE 3. RECONNECT PIPE WITH COUPLINGS. (ROMAC 501 LONG BARREL OR EQUAL) COUPLINGS SHALL HAVE ROMAC S.S: - STIFFENING INSERT OR EQUAL FOR HDPE PIPE END. 4. CHANNEL MANHOLE PER CITY STANDARDS. 5. FOR SSMH #4 CONNECTION REQUIRED ON ONE SIDE (EAST) ONLY. ��IAN�OLE CUT -1N INSTALLATION NTS ROLL 207 3" MIN. COMPACTED DEPTH CRUSHED ROCK BANK RUN GRAVEL aa" Mlnl. WHEN REQUIRED UNLESS OTHERWISE APPROVED BY NATIVE BACKFILL OR THE ENGINEER BANK RUN GRAVEL WHEN RE UIRED Q o.e a•• °0� � • °'O °'$o � 6 "MIN. �.o•o.: ° QoO. PVC. PIPE °e ' 6 'o ".• a , PIPE ZONE MATERIALS 6 "MIN. BEDDING MATERIALS IN PAVING �.: • • W4�•(.� °e sy� • � � ,;:; ��� i 0p 00 0000 00 0p00000 ° e0 ° ° O •0 . EX. PAVEMENT � /// \ \i � SAW CUT �\ EDGE OF EX. UNDISTURBED PAVEMENT NATIVE NATIVE BACKFILL OR MATERIAL BANK RUN GRAVEL aa" Mlnl. WHEN REQUIRED UNLESS OTHERWISE APPROVED BY NATIVE BACKFILL OR THE ENGINEER BANK RUN GRAVEL WHEN RE UIRED Q o.e a•• °0� � • °'O °'$o � 6 "MIN. �.o•o.: ° QoO. PVC. PIPE °e ' 6 'o ".• a , PIPE ZONE MATERIALS 6 "MIN. BEDDING MATERIALS IN PAVING �.: TRENCH DETAIL NTS • 1 WAL /C 'CT K SLI F O • • W4�•(.� °e sy� • � EGG °F way F �� 38067 4 • � � ® ® �S�r' v�RECISTERF'���'�V � / ` " � t �� A ]6825 4 �OF 4'EGISTERF'� F'� ESSIONAL ENO`s H /lb �7 ° e0 ° ° O •0 . EXPIRES 11 16 2008 PVC PIPE O °•�^ v : °' :poo_: °o'' o • e . 6 "MIN. �' �" ° � PIPE ZONE MATERIALS 6 "MIN. ,BEDDING MATERIALS TRENCH DETAIL NTS • 1 WAL /C 'CT K SLI F O • • W4�•(.� °e sy� • � EGG °F way F �� 38067 4 • � � ® ® �S�r' v�RECISTERF'���'�V � / ` " � t �� A ]6825 4 �OF 4'EGISTERF'� F'� ESSIONAL ENO`s H /lb �7 X77 � !%Ii7 l . EXPIRES ]1 O1 2006 EXPIRES 11 16 2008 Cc�:5- 373CI% C m o A� ' C N 00 m � � ww' x I`v, ti W L